Ramshorn pond dam rehabilitation Public information session

Ramshorn pond dam rehabilitation Public information session. May 14, 2014. PARE CORPORATION, FOXBORO, MA Allen R. Orsi, P.E., Managing Engineer. OUTLINE. Additional Evaluations Proposed Design Approach Additional Design Considerations. Additional evaluations.

isaura
Download Presentation

Ramshorn pond dam rehabilitation Public information session

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Ramshorn pond damrehabilitationPublic information session May 14, 2014 PARE CORPORATION, FOXBORO, MA Allen R. Orsi, P.E., Managing Engineer

  2. OUTLINE • Additional Evaluations • Proposed Design Approach • Additional Design Considerations

  3. Additional evaluations • Upstream Membrane Option

  4. Additional evaluations • Upstream Membrane Option

  5. Additional evaluations • Toe Drain Impacts • Reviewed improvements provided by downstream toe drain • Existing Seepage Exit Gradient Factor of Safety = 1.2 • With Toe Drain Exit Gradient Factor of Safety = 2.0 • Dam safety practice designs for a Factor of Safety = 5.0

  6. Additional evaluations • Opinions of Cost • Significant cost impacts associated with contingencies and early stage of design

  7. Additional evaluations • Recommended Approach • Upstream Cutoff Wall • Durability • Permittability • Schedule • Drawdowns

  8. Design approach • Proposed Site Plan

  9. Design approach • Proposed Spillway

  10. Design approach • Proposed Low Level Outlet

  11. Design approach • Proposed Upstream Wall

  12. Design approach • Proposed Parking

  13. Design approach • Proposed Public Access

  14. Design approach • Proposed Drainage

  15. Additional design considerations • Control of Water • Drawdowns • Bypass / Flow Maintenance • Cofferdams • Construction Phasing • Detours / Road Closure • Public Access Information / Signage

  16. questions