An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Northeast Water SystemInformational Meeting November 29, 2010

  2. Northeast Water System Agenda • Project Update • Construction Schedule & Progress • Water Rate & Billing • Taps Availability & Procedures • Households Connection Assistance • Project & Water System Contact Information

  3. Northeast Water System Construction Schedule & Progress: ContractCompletion Date • A – Pump Station 12/14/2010 • B – Water Tank 12/14/2010 • C – Electrical 12/14/2010 • DI – Waterline 11/03/2010 • DII – Waterline 11/03/2010 • DIII – Waterline 12/10/2010

  4. Northeast Water System Water Rate & Billing: • Rate – $6.95 per 1000-gallon • Toledo water rate increase by 9.9% - Northeast water rate would be $7.11/1000 gal • Minimum Water Bill – 1000-gallon per month • Bi-Monthly Billing • Water Bill from Fulton County • Water Bill to Property Owner • Payment Options • Delinquent Accounts

  5. Northeast Water System Taps Availability & Procedures: • Tap Application • Tap Fees & Waiver

  6. Northeast Water System Taps Availability & Procedures: • Service Line & Meter Specifications • Service Line Diagram • Pressure Regulator Valve

  7. Northeast Water System Taps Availability & Procedures: • Approved Tapping Contractors

  8. Northeast Water System Taps Availability & Procedures: • Existing On-Lot Water Source (s) • Tap Work Inspection

  9. Northeast Water System Households Connection Assistance: Steve Brown Regional Planning Commission 152 South Fulton Street, Suite 230 Wauseon, Ohio 43567 (419) 337-9214

  10. Northeast Water System Project & Water System Contact Information: Kelly Borton Kenny Cowell Rick Meiring Ziad Musallam Fulton County Sanitary Engineer 125 South Fulton Street, Suite 240 Wauseon, Ohio 43567 Phone (419) 337-9263 www.fultoncountyoh.com

  11. Northeast Water System Summary & Notes: 1. Project completion dates are based on Toledo Edison progress in providing power service to the pump station. 2.Northeast Water System rate may increase if Toledo rate is increased by 9.9%. 3. Billing is expected to be done around the 1st of each period (bi-monthly) and due in 15 days with 10% late charges. Water use rules and regulations are available on-line or by calling the office. 4. Fulton County will notify all potentially new customers of waterline availability to tap. 5. Tap fee ($1000) waiver will be valid for 6 months from the date of waterline availability. 6. Service line and meter specifications are available on-line or by calling the office.