REQUEST FOR STATEMENT OF QUALIFICATIONS PRE-SUBMITTAL CONFERENCE Date: 1-11-11 CHICAGO CUBS

REQUEST FOR STATEMENT OF QUALIFICATIONS PRE-SUBMITTAL CONFERENCE Date: 1-11-11 CHICAGO CUBS SPRING TRAINING FACILITY & RIVERVIEW SITE DEVELOPMENT MASTERPLANNING, PROGRAMMING, DESIGN, AND/OR CONSTRUCTION CONSULTANT SERVICES CITY OF MESA PROJECT No. 10-554-001. Agenda.

irina
Download Presentation

REQUEST FOR STATEMENT OF QUALIFICATIONS PRE-SUBMITTAL CONFERENCE Date: 1-11-11 CHICAGO CUBS

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. REQUEST FOR STATEMENT OF QUALIFICATIONS PRE-SUBMITTAL CONFERENCE Date: 1-11-11 CHICAGO CUBS SPRING TRAINING FACILITY & RIVERVIEW SITE DEVELOPMENT MASTERPLANNING, PROGRAMMING, DESIGN, AND/OR CONSTRUCTION CONSULTANT SERVICES CITY OF MESA PROJECT No. 10-554-001

  2. Agenda • INTRODUCE PROJECT TEAM & OPENING REMARKS • PROJECT OVERVIEW • SITE OVERVIEW • SCOPE OF WORK • STATEMENT OF QUALIFICATIONS (SOQ) OVERVIEW • EVALUATION CRITERIA • SUBMITTAL REQUIREMENTS • SELECTION PROCESS • SCHEDULE • QUESTIONS AND ANSWERS

  3. PROJECT OVERVIEW • Master Planning and Design of the Riverview site to include the following potential components: • Major League Baseball Training Facilities and Stadium • Commercial/Retail development • A public park/open spaces integrated into the site facilities • Space for a future themed commercial development

  4. PROJECT OVERVIEW • Primary Design Feature: • Major League Spring Training Stadium • Stadium (up to 15,000 person capacity) • Clubhouse (approximately 50,000 square feet) • Six full-size baseball practice fields • Practice infield(s) • Agility field(s) • Covered Batting tunnels • Pitching mounds • Other site improvements as determined during the programming phase

  5. PROJECT OVERVIEW • Project Delivery Method: • Construction Manger At Risk (CMAR) has been selected • RFQ for CMAR (Release to be determined)

  6. SCOPE OF WORK • Scope of Work: • Task 1 – Planning/Design Team Project • Manager • Task 2 – Programming and/or Master Site • Development Plan • Task 3 – Detailed Design and Construction • Task 4 – Coordination with the CMAR • Task 5 – Construction Phase Services

  7. SOQ OVERVIEW • Statement of Qualifications Evaluation Criteria • General Information (5 points) • Experience and Qualifications of the Prime Firm (45 points) • Experience and Qualifications of the Team and Key Personnel (40 points) • Current Workload and Ability of Project Team to Start Immediately (5 points) • Principal Office Location and Local Participation • (5 points)

  8. SOQ OVERVIEW • Submittal Requirements: • Ten copies of Statement of Qualifications due by • February 3, 2011 at 10:00 a.m. • Maximum 20 pages • Submittals delivered to: • City of Mesa Engineering Department • Ross Renner, P.E. • Fifth Floor – Suite 500 • City Plaza Building • 20 E. Main Street • Mesa, AZ 85201

  9. SOQ OVERVIEW • Selection Process: • Qualifications-Based Selection Process based upon three evaluated elements: • Statement of Qualifications submitted • Reference Verification of the Finalists • Interviews of Short-Listed Firms • Select Firm/Team • Selection Committee will be combination of City and • Cubs Staff

  10. SOQ OVERVIEW • Tentative schedule: • Pre-Submittal Conference Today 1-11-11 • SOQ’s Due February 3, 2011 / 10 a.m. • Pre-Interview Conference Week of February 13, 2011 • Shortlist Interviews/Presentations Week of February 27, 2011 • Select Firm/Team Week of February 27, 2011

  11. Questions and Answers http://www.mesaaz.gov/engineering/cubs.aspx