Introductory Seminar on Research CIS5935 Fall 2008

Introductory Seminar on Research CIS5935 Fall 2008. Ted Baker. Outline. Introduction to myself My past research My current research areas Technical talk: on RT MP EDF Scheduling The problem The new results The basis for the analysis Why a better result might be possible.

irina
Download Presentation

Introductory Seminar on Research CIS5935 Fall 2008

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Introductory Seminar on ResearchCIS5935 Fall 2008 Ted Baker

  2. Outline • Introduction to myself • My past research • My current research areas • Technical talk: on RT MP EDF Scheduling • The problem • The new results • The basis for the analysis • Why a better result might be possible

  3. Past Research • Relative computability • Relativizations of the P=NP? question (1975-1979) • Algorithms • N-dim pattern matching (1978) • extended LR parsing (1981) • Compilers & PL implementation • Ada compiler and runtime systems (1979-1998) • Real-time runtime systems, multi-threading • FSU Pthreads & other RT OS projects (1985-1998) • Real-time scheduling & synch. • Stack Resource Protocol (1991) • Deadline Sporadic Server (1995) • RT Software standards • POSIX, Ada (1987-1999)

  4. Recent/Current Research • Multiprocessor real-time scheduling (1998-…) • how to guarantee deadlines for task systems scheduled on multiprocessors? with M. Cirinei & M. Bertogna (Pisa), N. Fisher & S. Baruah (UNC) • Real-time device drivers (2006-…) • how to support schedulability analysis with an operating system? • how to get predictable I/O response times? with A. Wang & Mark Stanovich (FSU)

  5. A Real-Time Scheduling Problem Will a set of independent sporadic tasks miss any deadlines if scheduled using a global preemptive Earliest-Deadline-First (EDF) policy on a set of identical multiprocessors?

  6. Background & Terminology • job = schedulable unit of computation, with • arrival time • worst-case execution time (WCET) • deadline • task = sequence of jobs • task system = set of tasks • independent tasks: can be scheduled without consideration of interactions, precedence, coordination, etc.

  7. Sporadic Task i • Ti = minimum inter-arrival time • Ci = worst-case execution time • Di = relative deadline job completes deadline job released next release scheduling window

  8. Multiprocessor Scheduling • m identical processors (vs. uniform/hetero.) • shared memory (vs. distributed) • preemptive (vs. non-preemptive) • on-line (vs. off-line) • EDF • earlier deadline  higher priority • global (vs. partitioned) • single queue • tasks can migrate between processors

  9. Questions • Is a given system schedulable by global-EDF? • How good is global-EDF at finding a schedule? • How does it compare to optimal?

  10. Schedulability Testing Global-EDF schedulability for sporadic task systems can be decided by brute-force state-space enumeration (in exponential time) [Baker, OPODIS 2007] but we don’t have any practical algorithm. We do have several practical sufficient conditions.

  11. Sufficient Conditions for Global EDF • Varying degrees of complexity and accuracy • Examples: • Goossens, Funk, Baruah: density test (2003) • Baker: analysis of -busy interval (2003) • Bertogna, Cirinei: iterative slack time estimation (2007) • Difficult to compare quality, except by experimentation • All tests are very conservative

  12. Density Test for Global EDF Sporadic task system  is schedulable on m unit-capacity processors if where

  13. A more precise load metric maximum demand of jobs of i that arrive in and have deadlines within any interval of length t maximum fraction of processor demanded by jobs of i that arrive in and have deadlines within any time interval

  14. Rationale for DBF single processor analysis uses maximal busy interval, which has no “carried in” jobs.

  15. Load-based test: Theorem 3 Sporadic task system t is global-EDF schedulable on m unit-capacity processors if where

  16. Optimality • There is no optimal on-line global scheduling algorithm for sporadic tasks [Fisher, 2007] • global EDF is not optimal • so we can’t compare to an optimal on-line algorithm • but we can compare it to an optimal clairvoyant scheduler

  17. Speed-up Factors, used in Competitive Analysis A scheduling algorithm has a processor speedup factor f ≥ 1 if for any task system  that is feasible on a given multiprocessor platform the algorithm schedules  to meet all deadlines on a platform in which each processor is faster by a factor f.

  18. EDF Job Scheduling Speedup Any set of independent jobs that can be scheduled to meet all deadlines on m unit-speed processors will meet all deadlines if scheduled using Global EDF on m processors of speed 2 - 1/m. [Phillips et al., 1997] But how do we tell whether a sporadic task system is feasible?

  19. Sporadic EDF Speed-up If t is feasible on m processors of speed x then it will be correctly identified as global-EDF schedulable on m unit-capacity processors by Theorem 3 if

  20. Corollary 2 The processor speedup bound for the global-EDF schedulability test of Theorem 3 is bounded above by

  21. Interpretation The processor speed-up of compensates for both • non-optimality of global EDF • pessimism of our schedulability test There is no penalty for allowing post-period deadlines in the analysis (Makes sense, but not borne out by prior analyses, e.g., of partitioned EDF)

  22. Steps of Analysis • lower bound m on load to miss deadline • lower bound on length of m-busy window • downward closure of m-busy window • upper bound on carried-in work per task • upper bound on per-task contribution to load, in terms of DBF • upper bound on DBF, in terms of density • upper bound on number of tasks with carry-in • sufficient condition for schedulability • derivation of speed-up result

  23. problem job arrives first misseddeadline other jobs execute problem job executes Consider the first “problem job”, that misses its deadline. What must be true for this to happen?

  24. Details of the First Step What is a lower bound on the load needed to miss a deadline?

  25. problem job arrives first missed deadline previous job of problem task problem job ready The problem job is not ready to execute until the preceding job of the same task completes.

  26. first missed deadline problem window previous job of problem task problem job ready Restrict consideration to the “problem window” during which the problem job is eligible to execute.

  27. problem window other tasks execute problem task executes The ability of the problem job to complete within the problem window depends on its own execution time and interference from jobs of other tasks.

  28. problem window carried-in jobs deadline > td • The interfering jobs are of two kinds: • local jobs: arrive in the window and have deadlines in the window • carried-in jobs: arrive before the window and have deadlines in the window

  29. other tasks interfere problem task executes Interference only occurs when all processors are busy executing jobs of other tasks.

  30. other tasks interfere problem task executes Therefore, we can get a lower bound on the necessary interfering demand by considering only “blocks” of interference.

  31. other tasks interfere problem task executes The total amount of block interference is not affected by where it occurs within the window.

  32. other tasks interfere problem task executes The total demand with deadline  td includes the problem problem job and the interference. processors busy executing jobs with deadline  problem job

  33. approximation of interference (blocks) by demand (formless) average competing workload in [ta,td) processors busy executing other jobs with deadline  problem job From this, we can find the average workload with deadline  td that is needed to cause a missed deadline.

  34. previous deadline of problem task problem job arrives previous job of problem task The minimum inter-arrival time and the deadline give us a lower bound on the length of the problem window.

  35. The WCET of the problem job and the number of processors allow us to find a lower bound on the average competing workload.

  36. What we have shown There can be no missed deadline unless there is a “-busy” problem window.

  37. The Rest of the Analysis • [lower bound m on load to miss deadline] • lower bound on length of m-busy window • downward closure of m-busy window • upper bound on carried-in work per task • upper bound on per-task contribution to load, in terms of DBF • upper bound on DBF, in terms of density • upper bound on number of tasks with carry-in • sufficient condition for schedulability • derivation of speed-up result

  38. Key Elements of the Rest of the Analysis # tasks with carried-in jobs  m-1 shows carried-in load  max Observe length of -busy interval ≥ min(Dk,Tk) covers case Dk>Tk • Derive speed-up bounds

  39. previous deadline of problem task problem job arrives previous job of problem task Observe length of -busy interval ≥ min(Dk,Tk) This covers both case Dk≤TkandDk>Tk

  40. To minimize the contributions of carried-in jobs, we can extend the problem window downward until the competing load falls below . maximal -busy interval

  41. maximal -busy interval at most carried-in jobs Observe # tasks with carried-in jobs  m-1 Use this to show carried-in load  max

  42. Summary • New speed-up bound for global EDF on sporadic tasks with arbitrary deadlines • Based on bounding number of tasks with carried-in jobs • Tighter analysis may be possible in future work

  43. Where analysis might be tighter • approximation of interference (blocks) by demand (formless) • bounding i by max (only considering one value of ) • bounding DBF(i, i +) by (i +)max(t) • double-counting work of carry-in tasks

  44. bounding DBF(i, i +) by (i +)max(t) contribution of i

  45. double-counting internal load from tasks with carried-in jobs carry-in cases non-carry-in cases

  46. Some Other Fundamental Questions • Is the underlying MP model realistic? • Can reasonably accurate WCET’s be found for MP systems? (How do we deal with memory and L2 cache interference effects?) • What is the preemption cost? • What is the task migration cost? • What is the best way to implement it?

  47. The End questions?

  48. maximal -busy interval at most carried-in jobs

  49. maximal -busy interval

  50. maximal -busy interval