Vacuum & Cooling Systems Updates F. Makahleh On behave of Vacuum & Cooling Group

Vacuum & Cooling Systems Updates F. Makahleh On behave of Vacuum & Cooling Group. TAC 2013, F. Makahleh, Vacuum & Cooling. OUTLINES BR Vacuum System SR Vacuum System Remarks on Commissioning of Cooling System. TAC 2013, F. Makahleh, Vacuum & Cooling. BR Dipole Chamber FAT FMB April, 2013.

iren
Download Presentation

Vacuum & Cooling Systems Updates F. Makahleh On behave of Vacuum & Cooling Group

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Vacuum & Cooling Systems UpdatesF. Makahleh On behave of Vacuum & Cooling Group TAC 2013, F. Makahleh, Vacuum & Cooling

  2. OUTLINES BR Vacuum System SR Vacuum System Remarks on Commissioning of Cooling System TAC 2013, F. Makahleh, Vacuum & Cooling

  3. BR Dipole Chamber FAT FMB April, 2013

  4. BR Dipole Chamber FAT FMB April, 2013 • The following tests were carried out: • Bake out at 250 °C for 48 hours • Helium leak test after bake out • Final pressure test after bake out • Desorption rate test after bake out • Residual Gas Analyses (RGA) after bake out • The permeability of chamber including welding seams Laser Arm Measurement

  5. BR Installation

  6. BR Vacuum GUI Start with 2 Screens More Screens: TL1 Vacuum Trend Vacuum Profile Alarms Access Level

  7. BR Vacuum Trend P min = 1.2 E-8 mbar S3 P max = 1.2 E-7 mbar Ext.Septum Time (Weeks)

  8. SR Vacuum Chambers Magnets, Chambers and Girder Coil width increased by 40 mm when optimized by CERN CERN Double Check

  9. IR Dipole Vacuum Chamber Rectangular flange design (fits inside the coil 3mm far from the edges) Circular flange design (hits the magnet coils at the two edges) IR opening is kept 40*15 mrad @ 2.15 m

  10. Vacuum Chamber Tender Findings Rewarded to FMB with 1.45 M € (Lowest Price)

  11. What Else for Vacuum System ?? Ready

  12. Cooling Plant

  13. Cooling GUIs 20 Screens Data logging Alarms Web Address

  14. Cooling Commissioning • System commissioning with Control System : • Include Temperatures, pressures, flow rates, KWh , and scheduling. • Also include point-point check. • BR Cooling circuit (PIDs) are adjusted for temperature, pressure and flow • SR,RF and BL are adjusted for pressure and flow (Same PID) parameters. • All circuits to be re-commissioned (end of 2015)? Temp. Stability = ± 0.4 °C Average.abs.diff = 0.15 °C Time (hours)

  15. Acknowledgment: Many Thanks for Lothar Schulz for advices and discussions stated 2006 which lead to optimized design. Thank You