An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. GrocerSmart Standard ProtocolUpdate Regional Technical Forum March 18, 2014

  2. GrocerSmart Calibration Status • Provisional Protocol approved in 2011 • Software needs calibration, similar to SEEM • Requires metering on 36 measures • Protocol due to sunset in August, 2014 • To date, no knowledge of research (outside of PECI) being conducted to calibrate model

  3. GrocerSmart Calibration Status • PECI volunteering to meter 5 sites (10 measures) and analyze results • Will present initial findings and updated cost in August, 2014 • May re-convene R&E subcommittee before then to talk about sampling and costs • PECI estimates over a year to get to 36 measures given seasonal constraints • RTF will need to decide what to do in August • Deactivate Protocol • Extend Sunset Date to get more data • Something else