An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Stormwater Management Regulation Update UDC Update Project Agricultural Advisory Board November 13, 2007 Snohomish CountyPlanning & Development Services

  2. UDC CODE PROVISIONS Processes & Procedures Land Use & Zoning Development Standards Life, Health & Safety POLICY FOUNDATION LEGAL FOUNDATION UDC Life, Health & Safety Pillar

  3. Why Are We Doing This Update? • Protect health and safety • Prevent/minimize degradation of water quality and slope instability • Preserve WQ for aquatic habitats, recreation, and drinking water • Comply with CWA and DOE NPDES Permit

  4. Phase 1 Municipal Stormwater Permit Requirements • Adopt Appendix 1 Minimum Technical Requirements for New Development and Redevelopment • Adopt 2005 DOE Stormwater Manual for Western Washington with a Snohomish County Addendum

  5. Project Managers

  6. How is Stormwater Managed? • Construction Stormwater Pollution Prevention Plan (SWPPP) • Control water flow, install sediment controls, stabilize soils, protect slopes, wetlands, drain inlets, channels and outlets • Control pollutants with Best Management Practices (BMPs), source control, runoff treatment, and treatment facility sizing

  7. What’s New? • More restrictive exemptions • Applies to development and redevelopment • Applies to Class IV FP conversions - stormwater calculations required • More analysis is required for discharges to wetlands and a different baseline is used for the analysis in the 2005 DOE Manual

  8. What’s New? (continued) • Larger detention and retention ponds • Pre LDA site inspection • Reporting and inspections: existing facilities and upgrades • New pollution source control rules • Permit has several less restrictive provisions than existing code

  9. Code Revisions • Revisions to drainage & grading codes - Exemptions - Development & redevelopment thresholds - Minimum requirements

  10. DOE 2005 Manual • Adopt 2005 DOE Manual with addendum and ref to drainage and grading • Change to reflect Snohomish County business practices • Modify for clarity • Change to make “user friendly”

  11. Engineering Design & Development Standards (EDDS) • Revisions to address LID design standards • Review other standards (roads, drainage, etc.) for appropriate revisions • Modify for consistency with code and Drainage Manual • Adopted per rulemaking process

  12. Permit Exemptions 30.63A.020  Exemptions. (draft code in progress)    (1)  The following commercial agricultural production activities conducted outside ((critical)) wetlands, lakes, marine waters, and fish and wildlife habitatconservation areas and on land designated riverway commercial farmland, upland commercial farmland, or local commercial farmland by the comprehensive plan are exempt from the requirements of this chapter:      (a)  Tilling, soil preparation, and maintenance; and     (b)  Fallow rotation, planting, and harvesting except: (i) Conversions from timberland to agriculture and (ii) Construction of impervious surfaces, including but not limited to roads.

  13. Permit Exemptions (2)  The following commercial agricultural production activities conducted outside ((critical)) wetlands, lakes, marine waters and fish and wildlife habitat conservation areas and on land designated riverway commercial farmland, upland commercial farmland, or local commercial farmland by the comprehensive plan are exempt from all other requirements of this title except that they shall comply with the stormwater pollution prevention plan (SWPPP) requirements of SCC 30.63A.220(1)(a)-(g), and:

  14. Permit Exemptions (a)  Maintenance and repair except the creation of any new impervious surface on private property of existing commercial agricultural facilities, which may include drainage facilities, ponds, animal stock flood sanctuaries, animal waste management facilities, agricultural buildings, fences, roads, and bridges;      (b)  New construction (((including enlargement))) of drainage ditches that are less than 500 cubic yards or less of land disturbing activity of 2,000 square feet or less, which does not adversely impact ((critical areas, lakes,)) wetlands, lakes, marine waters and fish and wildlife habitat conservation areas or upstream or downstream properties, when such ditches do not have a surface connection within 100 feet of wetlands, lakes, marine waters and fish and wildlife habitat conservation areas or which contain water on-site for retention, infiltration or evaporation pursuant to chapter 30.62 SCC.

  15. Right to Farm (RTF) • DOE and FEMA exemptions: • De minimus ag activities that do not alter contours including tilling, plowing, harvesting, soil amendments and farm ditch digging if the originally constructed ditch configuration is not altered & spoils are removed or tilled as a soil amendment. • Exempt activities also include farm road construction or maintenance which does not alter contours, use culverts and is < 6 inches above grade.

  16. Permit vs. RTF • Federal CWA mandate trumps local initiative • Not allowed: Construction of • Roads • Impervious Surfaces

  17. County’s Strategy • Discuss de-minimus RTF activity with DOE • Provide de-minimus RTF justifications • Send draft code to DOE including existing right to farm provisions

  18. Right to Farm Justification • DOE allows de minimus construction that does not alter contours • Water infiltrates into outwash soils • Roads typically generate < 0.1 cfs threshold • DOE regulates stormwater on farmlands • Drainage plans and development reg by NRCS • Farm plans address stormwater management • Farm roads typically do not impact stormwater systems

  19. Alternatives • Amend code to match permit and include options if DOE will not allow RTF • Porous pavement on roads • Quarry spalls access roads

  20. Related Non-Exemptions • Conversion from timberland to agriculture not exempt

  21. Agricultural Advisory Board Input • Your comments and suggestions on RTF justification and options

  22. General Project Schedule • SEP: Draft codes and DOE Manual • OCT – DEC: Draft documents and public outreach • DEC: Review drafts • FEB: Transmit codes and manual to DOE for 60-day review • APR – JUL 2008: PC and Council Public Hearings • AUG/SEP 2008: Adoption for NPDES permit compliance

  23. Keep in Touch • Status updates and drafts available on the UDC Update Project homepage at www.snoco.org(search UDC Update) • Public can submit comments on the project page

  24. Staff Contacts • Bill Leif, Environmental Program Compliance Specialist, 425-388-3148 • Randy Sleight, Chief Engineering Officer, 425-388-3311, x2014 • Arthur Lee, Project Specialist, 425-388-3812 • Bob McEwen, Transportation Specialist, 425-388-3488, x4578 • Linda Kuller, Chief Planning Officer, 425-388-3412

  25. Acronyms • BMP – Best Management Practices • CESCL – Certified Erosion-Soil Control Lead • CWA – Clean Water Act • DOE – Department of Ecology • DOE Manual – 2005 Stormwater Manual for Western WA • EDDS – Engineering Design & Development Standards • LID – Low Impact Development • NPDES – National Pollutant Discharge Elimination Permit • SWPPP – Stormwater Pollution Prevention Plan • WWHM: Western WA Hydrology Model