The issue of loop flows Aleksandra Gawlikowska-Fyk. Berlin, 4 December 2012. Main power flows in Europe. Source: ENTSO-E Ten-Year Network Developemnt Plan 2012. What are loop flows. Loop flows / unplanned power flows / unannounced power flows

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' The issue of loop flows Aleksandra Gawlikowska-Fyk' - indira-chan


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
The issue of loop flows aleksandra gawlikowska fyk

The issue of loop flows Aleksandra Gawlikowska-Fyk

Berlin, 4 December 2012


Main power flows in europe
Main powerflows in Europe

Source: ENTSO-E Ten-Year Network Developemnt Plan 2012


What are loop flows
What are loop flows

Loop flows / unplanned power flows / unannounced power flows

  • physical phenomena that occurs when generation and load centers diverge thus resulting in differences between commercial schedules and physical flows.

    Unplanned power flows result from:

  • internal transactions between Northern (supply of wind generation) and Southern Germany (demand) but also

  • exchanges within a common market area of Germany and Austria

    There are no explicit limits to these flows even if they are heavily using the networks of the neighbors.


Physical and commercial power flows

Sweden

Export: 303.3 GWh

Import: 1467.0 GWh

Out: 277.5 GWh

In: 1513.6 GWh

Germany

Export: 7233.6 GWh

Import: 1983.5 GWh

Export: 0.0 GWh

Import: 59.6 GWh

Out: 0.0 GWh

In: 59.6 GWh

Export: 2609.9 GWh

Import: 195.3 GWh

Out: 432.1 GWh

In: 5135.6 GWh

Ukraine

Export: 3035.9 GWh

Import: 224.4 GWh

Out: 8261.5 GWh

In: 44.0 GWh

Export: 1284.5 GWh

Import: 37.2 GWh

Out: 3051.6 GWh

In: 26.6 GWh

Czech Republic

Slovakia

Physical and commercial power flows

Source: Polish Energy Regulatory Office


Problems resulting from loop flows
Problemsresulting from loopflows


Winter 2011 2012 critical
Winter 2011/2012 – critical

  • Problems associated with loop flows increased both in numbers and scale

  • massive renewable energy sources development not corresponding with grid development

  • Energiewende

Source: Position of ČEPS, MAVIR, PSE Operator and SEPS regardingthe issue of

BiddingZonesDefinition


Why poland and germany will cooperate
Why Poland and Germany will cooperate

Regulation No 714/2009

and

Congestion Management Guidelines

  • Point 3.1. capacity allocation at an

  • interconnection shall be coordinated by

  • involved TSOs. If commercial exchanges

  • between two countries affect physical

  • flow in third country – coordination

  • between all affected TSOs.

  • Point 3.2. coordinated congestion management method shall be applied by not later than 1 January 2007 in regions: Central Eastern Europe (Germany, Poland, Czech Republic, Slovakia, Hungary, Austria and Slovenia)

7


Possible solutions
Possible solutions

Many initiatives aiming to address the problem:

  • The European Commission - study

  • ACER

  • ENTSO-E

  • BNetzA and Federal Ministry (internal)

    Many possible solutions:

  • short-term – better coordination and cooperation between TSOs related to operational security (re-dispatching)

  • mid-term – correct market design (adequate bidding zones)

  • long-term – infrastructure enhancement (interconnectors and internal grids)

    Phase Shifters  is it a real solution  Problem Shifters ???


Phase shifters in europe
Phase shifters in Europe

Source: PolishEnergy Regulatory Office


What can be done main investment projects of pse operator sa

Legend

:

750

kV

400

kV

220

kV

400

kV temporary at

220

kV

DC cable

450

kV

Ger

-

Pol Power Bridge

Ger

-

Pol Improvements

Wind Integration

Power Evacuation

_

OST

Power Evacuation

_

KOZ

Power Evacuation

_

DBN

Power Evacuation

_

NORTH

What can be done: main investment projects of PSE Operator SA

Source: PSE Operator SA


Improvements on german polish border
Improvements on German-Polish border

  • Phase shifting transformers:

  • better management of unplanned transits DE-PL-CZ

  • enhancement of transfer capacity on Polish synchronous profile. Expected NTC increase:

    • 500 MW for import and 1500 MW for export

  • greater security and reliability of the regional transmission network in Poland and in other countries of the CEE region

  • increased capability to accommodate more renewable energy resources in a safe and reliable manner

  • Third DE-PL interconnector:

    • strengthening market integration between member states

    • increasing NTC by 1500 MW for import and 500 MW for export on PL-DE/SK/CZ synchronous profile

    • improving network security - project contributes to increase of security of supply and flexibility of the transmission network