1 / 3

Overview Build 2 Testing & DDWG Reports

Overview Build 2 Testing & DDWG Reports. PDS4 Operational Readiness Review and Acceptance Review 30 November 2011. Build 2 Testing. Every DN attempted prototyping an existing PDS3 data set. Tests the model and its implementation. Does not actively test the System.

inari
Download Presentation

Overview Build 2 Testing & DDWG Reports

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. OverviewBuild 2 Testing & DDWG Reports PDS4 Operational Readiness Review and Acceptance Review 30 November 2011

  2. Build 2 Testing • Every DN attempted prototyping an existing PDS3 data set. • Tests the model and its implementation. • Does not actively test the System. • Although the official 'focus' was on XML schema 1.0, several nodes worked with the XML schema 1.1 implementation. • We identified a lot of issues

  3. DDWG Reports Issues considered critical for build 2b • Information Model Issues – Contents, Outstanding Design Issues, Model-to-Schema • Producing Local Data Dictionaries • Issues with the Document Set • "Other Issues" – Aggregation Products, Binary Data • XML Schema and implementation process

More Related