An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Communications and Networking Testing Schedule Tim Krout

  2. Jan 5 - 15 2004 • COC-X - DARPA • Basic objectives • “ring out” COC computer / voice procedures • Verify PC configuration (LMR, tracking s/w) • Demonstrate ESTOP • Key components • 56 Iridium SBD trackers being tracked around Beltway for multiple days – system works as planned • 5 ESTOP pairs + masters – demo functionality, demo ability to down load data and store screen shot into computer memory • Conference call to simulate / emulate voice traffic – call out waypoints, logging procedures, etc. • Real Time Tracking - DARPA • Demo (Mindtel) of basic application functionality • 5 PCs in the 5 “tracking” vehicles (1 each) / 1 PC to monitor tracks in real-time (Verizon radio card) • Compare results w/ Iridium SBD (Be aware of Verizon QoS setting up our latency – not an issue in DCG • SCORE / CenGen - SOCAL • Outfit 3 trucks (F-250s) • Build mounting plates, test mount h/w

  3. Jan 16 2004 • Mindtel, Omnitech, SRA, CenGen, SCORE (?) • All real-time tracking hands meeting – DC • Assess Real-time tracking • Application status - MindTel • Multicast s/w status – Omnitech • Vehicle configuration status – CenGen • Ready to test in the field review • Is Omnitech ready to test LOS relays • Is CenGen ready to test satellite phone options

  4. Jan 19 – 28 2004 • Field testing of Real-Time Tracking Options • Omnitech • Will be ready to test using at least 1 balloon and two fixed (uWave) tower location • And three mobile nodes • CenGen • Will be ready to test using at least five satellite phones • Omnitech will provide multicast s/w tool • Mindtel will provide application to graph the location of mobile nodes from a “monitor” point • SCORE – 5 trucks online • Most likely scenario has us using • /X as the “base” of operations (SAF) • Setup “tower” at SAF for terrestrial relay • Use balloon in “open area” (high pt) for one test • Use balloon in “switch backs (high pt) for another test • Use 1st (heading toward Primm) uWave tower as terrestrial relay attachment point • Move 3 (up to 5 if h/w supports) CVs between /X to beyond 1st uWave tower • Verify connectivity / ability to track • Using terrestrial relay (Omnitech) and Satellite phone (CenGen) • Objective 1 – assess readiness to support real-time tracking • Objective 2 – enable a decision as to pursue • An all terrestrial real-time tracking solution • An all satellite real-time tracking solution • A mix (extra $) • Verify functional COC PSTN connectivity • Between uWave towers • To external entities

  5. Feb 2 – 8 2004 • 2 Feb – receive ESTOP units from Teams • Procure / install h/w for selected option • Update to latest application load - MindTel • Outfit CVs – 25/28 • Test placement of bridges if all terrestrial option selected

  6. Feb 9-15 2004 • Objectives 9-13 Feb • Support COC training • Using as much of real-time tracking as possible • Use Iridium SBD at a minimum • Verify terrestrial Voice comms • Test real-time tracking • Objective 14/15 Feb • Static test of real-time tracking system • 25 CVs, parked (Primm) run for multiple hours • Mobile run of course to support / demo real-time tracking capability • Monitor from COC

  7. Feb 16 - 29 2004 • 16 Feb – return ESTOP units to teams • Send Iridium SBD units to teams • Objectives • “clean-up” real-time tracking • Using 5 spare ESTOP tracking sets • Test QID PSTN connectivity • Setup routes for QID • Test tracking connectivity QID – COC • Add CV “tracking” laptop to CV if funded • Test functionality

  8. March 1 - 14 2004 • Support training • Support QID • Support DCG