SWG Report to TAS
This presentation is the property of its rightful owner.
Sponsored Links
1 / 8

SWG Report to TAS 2010 Study Program August 19, 2010 Marv Landauer PowerPoint PPT Presentation


  • 57 Views
  • Uploaded on
  • Presentation posted in: General

SWG Report to TAS 2010 Study Program August 19, 2010 Marv Landauer. SWG Update. 2010 Study Program Status Marv Landauer 2029 Study Report (earlier) 2019 Study Progress and ResultsHeidi Pacini 2020 Study Development i) Transmission Marv Landauer

Download Presentation

SWG Report to TAS 2010 Study Program August 19, 2010 Marv Landauer

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Swg report to tas 2010 study program august 19 2010 marv landauer

SWG Report to TAS

2010 Study Program

August 19, 2010

Marv Landauer


Swg update

SWG Update

  • 2010 Study Program Status Marv Landauer

  • 2029 Study Report (earlier)

  • 2019 Study Progress and ResultsHeidi Pacini

  • 2020 Study Development

    i) Transmission Marv Landauer

    (1) Documentation recommendation Steve Walton

    ii) Resource Development Tom Carr

    iii) 2020 case status Heidi and Ismael Aguayo

  • Future Study Case DevelopmentSteven Wallace


Adjacent criteria study

Adjacent Criteria Study

  • NTTG requested evaluation of congestion impacts of removal of WECC adjacent circuit criteria

  • Resistance from TSS to provide information

    • Resource requirements and having another “Rating” out there

    • TSS wants proper description/caveats for study

  • Reviewed critical outages listed in Path Rating Catalog

  • Pursued existing paths that listed N-2 outages or did not list a critical outage with TSS contact

  • Harder to quantify rating change for future projects – assume expected ratings would not change

    • criteria change would be most beneficial for siting projects


Adjacent criteria study1

Adjacent Criteria Study

  • 17 path directions listed N-2 outage as critical outage or did not list a critical outage

  • 14 of those path directions included common towers, had RAS to mitigate N-2 outage, had additional N-1 limiting outages, etc – would not result in path increase w/o criterion

  • Only 3 paths would result in increases w/o criterion

    • Path 18 N-S: 8 MW

    • Path 26 S-N: 1000 MW

    • Path 51: 400 MW


Adjacent criteria study2

Adjacent Criteria Study

  • from 2019 PC1A

  • Given limited potential increases, do we still want to run this study?


Transmission cost estimates

Transmission Cost Estimates

  • SWG is using transmission cost estimates developed by WREZ process.

  • SWG will use developer mileages, WREZ cost per mile to develop project costs

  • Substation costs seem high, were ignored in the cost estimates developed for last year’s study.

  • Task force being created to review and update these costs – needed by September 30

  • Jeff Hein to lead ([email protected])


2010 study program

2010 Study Program

  • 2019 Study results - Heidi


Scg foundation project list

SCG Foundation Project List

  • SCG Final Foundation List posted

  • SWG Foundation List webinar July 16

  • SWG discussion July 28

    • SWG agrees with criteria used to develop Foundation List and the application of the criteria

    • SWG plans to use Foundation Project List for 2020 base case (one abstention)

    • One issue remaining with NV projects (SNIP)

    • Additional documentation is desired (WECC staff recommendation – Steve)


  • Login