1 / 55

Minimalist Mars Mission Establishing a Human Toehold on the Red Planet

Minimalist Mars Mission Establishing a Human Toehold on the Red Planet. January 2011 Review DevelopSpace MinMars Team. Agenda. Introduction and motivation Overall architecture Transportation: cargo and crew Surface infrastructure and mobility Life support, ISRU, and resupply logistics

ilya
Download Presentation

Minimalist Mars Mission Establishing a Human Toehold on the Red Planet

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Minimalist Mars MissionEstablishing a Human Toehold on the Red Planet January 2011 Review DevelopSpace MinMars Team

  2. Agenda • Introduction and motivation • Overall architecture • Transportation: cargo and crew • Surface infrastructure and mobility • Life support, ISRU, and resupply logistics • Launch manifest • Notional net-present-cost analysis • Expanding the toehold into a colony • Impact of new technologies on the architecture • Interesting topics for future work

  3. Agenda • Introduction and motivation • Overall architecture • Transportation: cargo and crew • Surface infrastructure and mobility • Life support, ISRU, and resupply logistics • Launch manifest • Notional net-present-cost analysis • Expanding the toehold into a colony • Impact of new technologies on the architecture • Interesting topics for future work

  4. Project Motivation • For manifold reasons, it is our destiny as humans to expand our presence: • Since the existence of our species, we have expanded our habitat over almost the entire Earth • This expansion was enabled by using technology (e.g. living in central Europe or northern Minnesota and surviving the winter) • The next logical step is to go beyond Earth • Requires more significant reliance on technology • In addition to expanding our presence, there may be numerous other benefits from this: • Rekindling of frontier spirit, societal invigoration • Generation of new technologies, now knowledge • Backup of our species and its achievements There are people who want to make it happen

  5. Why Mars? • Why would we want to expand to Mars, instead of other destinations such as the Moon? • Of all the bodies of the inner solar system eligible for near-term colonization, Mars is the most suitable • Mars has an atmosphere, specifically a CO2 atmosphere (GCR / SPR protection, feedstock for ISRU) • All the other elements necessary for sustained human existence are present in one for or another on the Martian surface • Nitrogen, hydrogen, oxygen, carbon, iron, aluminum, etc. • From a mass / energy perspective, the Martian surface is about as hard to reach as the lunar surface • Higher gravity level than on the Moon • Major challenges of Mars are that it takes longer to get there and aeroentry / aerocapture is required

  6. Agenda • Introduction and motivation • Overall architecture • Transportation: cargo and crew • Surface infrastructure and mobility • Life support, ISRU, and resupply logistics • Launch manifest • Notional net-present-cost analysis • Expanding the toehold into a colony • Impact of new technologies on the architecture • Interesting topics for future work

  7. MinMars Outpost Architecture Overview • Initial crew size: 4 • Location: • 20-40 deg northern latitude • Longitude not specified, preferably close to sites of scientific interest • Surface altitude < -2 km • Outpost initial operational duration: 20 opportunities • Build-up of a colony should be possible during that time • Use of commercial launch vehicles (e.g. Falcon 9 Heavy) for deployment and re-supply • Use of Mars in-situ resources (in particular the Mars atmosphere) as a means of reducing re-supply needs • Use of existing technologies or near-term extrapolations thereof (in particular for Mars EDL) • Use of solar power generation

  8. Mars Surface Water Content • While in-situ production of water is not planned for the initial stage of the MinMars outpost operations, it may be essential for a full colony • Within the outpost location zones dictated by solar power generation and Mars EDL considerations there seems to be a minimum water mass fraction of 4% in the Mars surface soil

  9. Overall MinMars Outpost Arrangement Landing zone Habitat andISRU equipment 1-2 km Solar arraydeployment area Approach corridor

  10. Agenda • Introduction and motivation • Overall architecture • Transportation: cargo and crew • Surface infrastructure and mobility • Life support, ISRU, and resupply logistics • Launch manifest • Notional net-present-cost analysis • Expanding the toehold into a colony • Impact of new technologies on the architecture • Interesting topics for future work

  11. Cargo Transportation Mars 2 mt of useful payload on the surfaceof Mars; 1 km landing accuracy Pre-deployed beacon Direct Mars entry (lifting) using anextension of Viking EDL technology Low Mars Orbit Trans-Mars coast (~ 6-8 months) 1-13 monthsof loitering Highly Elliptic Earth Orbit (e.g. GTO) Commercial Earth launch(e.g. on a Falcon 9 Heavy) Earth

  12. Mars EDL Concept Ballisticcoefficient: • Analyses indicate that existing Mars EDL technology can be extended to a payload mass of 2000 kg • See NASA Mars Design Reference Architecture 5.0 • Existing Mars EDL technology was developed for Viking • => Extension of the MSL EDL system (however, no skycrane, lander stage instead): • MSL ballistic coefficient: 115 kg/m2 • MSL reference area (4.6 m diameter): 16.62 m2 • Payload mass fraction on entry: 775 kg / 2800 kg = 0.28 • MSL hypersonic drag coefficient: 2800 kg / (115 kg/m2 x 16.62 m2) = 1.46 • MSL propellant mass estimate: 8 x 50 kg = 400 kg • MinMars EDL system characteristics: • Entry mass: 2000 kg / 0.28 = 7143 kg • Reference area: 7143 kg / (1.46 x 115 kg / m2) = 42.54 m2 • Aeroshell diameter: 7.36 m • Lander propellant mass: 2000 kg / 775 kg x 400 kg = 1032 kg • EDL system dry mass (including the cruise stage):8000 kg – 2000 kg – 1032 kg = 4968 kg MSL scaled up 7.36 m MinMars aeroshell Payload envelope(cylinder): 1.5 m diameter,2.5 m height

  13. NASA MSL

  14. Launch and Earth Departure for Cargo • Trans-Mars injection Δv: 4000 m/s (from LEO); 1500 m/s (from GTO) • Falcon 9 heavy payload performance to GTO: 19500 kg • Trans-Mars injection payload mass:8000 kg (including cruise stage) • Kick stage design • Propellant combination: MMH + N2O4 (hypergolic + storable); Isp = 316 s • Propellant mass: 5687 kg • Structure mass: 1137 kg (20% of propellant mass) • Total Falcon 9 Heavy payload mass to GTO: 14824 kg “Storage” orbit (GTO) Earth Trans-Marsdeparturehyperbola

  15. Crew Transportation (for 2 Crew) Mars 2 crew members on the surfaceof Mars; 1 km landing accuracy Pre-deployed beacon Direct Mars entry (lifting) using anextension of Viking EDL technology Low Mars Orbit ITH discarded Commercial cargo launch(e.g. on a Falcon 9 Heavy) Trans-Mars coast (~ 6 months) 1-5 months of loitering forEarth departure stages Earth departure stages discarded Low Earth Orbit (e.g. GTO) ITH Earthdeparturestage 1 Earthdeparturestage 2 Mars lander Commercial crew launch(e.g. Falcon 9 / Dragon) Earth

  16. Interplanetary Transfer Habitat (ITH) • The ITH design is based on a NASA habitat design for a Sun-Earth L2 mission habitat (100-day mission with a crew of 4) • The MinMars version of this habitat would house a crew of 2 for 200 days (twice the pressurized volume available per crew member) • Habitat total wet mass at launch: 14540 kg • Habitat envelope during launch (deflated): 4 m diameter, 10 m length • Minimum consumables mass: 800 kg (food) + 200 d x 2 p x 3 kg / p / d = 2000 kg • => Conservative estimate of ITH inert mass (for estimating cost): 12540 kg • Total launch mass of ITH and Mars Crew Lander: 14540 kg + 7143 kg = 21683 kg NASA hab design

  17. Mars Crew Lander • The crew lander consists of the cargo lander aeroshell, propulsion and landing system, and a 2 mt crew landing module (as payload) • The crew landing module design is adapted from an Apollo-era lunar surface shelter design • The crew landing module provides post-landing life-support for 2 crew for 10 days (also includes and airlock) • Module may be reused as overnight shelter for excursions (after relocation)

  18. Earth Departure Stage: Adapted Centaur V1

  19. Earth Departure Propulsive Capability 4 Centaur V1 stages 3 Centaur V1 stages 1 Centaur V1 stage 2 Centaur V1 stages

  20. Agenda • Introduction and motivation • Overall architecture • Transportation: cargo and crew • Surface infrastructure and mobility • Life support, ISRU, and resupply logistics • Launch manifest • Notional net-present-cost analysis • Expanding the toehold into a colony • Impact of new technologies on the architecture • Interesting topics for future work

  21. Habitation Infrastructure I H R I H I H R H I

  22. Surface Hab Module • The surface hab module design is adapted from an Apollo-era lunar surface shelter design • Each hab module provides life-support, thermal control, and crew systems • Each hab module has an airlock and 3 interfaces for connection to other modules (re-supply, inflatable, etc.) • 4 hab modules are delivered to the Martian surface and connected linearly Image credit: NASA

  23. Resupply Module • The resupply module design is adapted from an Apollo-era lunar surface shelter design (airlock included) • Each module has one interface for connection to a hab module • Based on the adapted design, each module can deliver a total of 853 kg of usable resupply (very conservative estimate) • 8 modules are required to deliver the press. resupply for one opportunity • Modules are also used for storing trash or as shelters for surface excursions Image credit: NASA

  24. Inflatable Module Source: Four Seasons Hotel. Boston. 380 sqft Superior Room MinMars version assumedto be about 1000 kg perinflatable module (no airlock) Source: Spampinato, P. “Expandable Habitat Structures for Long Duration Lunar Missions”. 3rd Space Exploration Conference & Exhibit. Feb 2008. ILC Dover. • Antarctic Habitat Demonstrator • 8 ft max head room • Floor Area: 384 sq ft (24 ft x 16 ft) [35.7 m2] • Packed System: 1000 lbs [455 kg] • 2 packages (3 ft by 4 ft by 8 ft)

  25. Mobility / Offloading Elements Image credit: NASA • CMC (Crewed Mobility Chassis) • NASA’s current estimate for the CMC is 969 kg dry vehicle mass (3 mt payload) • Source: Culbert, C. “Lunar Surface Systems Project Overview.” USCC Programmatic Workshop on NASA Lunar Surface Systems Concepts. NASA. Feb 2009. • LSMS (Lunar Surface Manipulator System) • NASA’s current estimate for the LSMS is 190 kg (6 mt capability) • Source: Culbert, C. “Lunar Surface Systems Project Overview.” USCC Programmatic Workshop on NASA Lunar Surface Systems Concepts. NASA. Feb 2009. • Mobility elements used for both crew exploration and infrastructure deployment • Two CMC + LSMS are prepositioned on the Martian surface; in each resupply opportunity one CMC + LSMS is sent to Mars

  26. Unpressurized Mobility Capabilities 2 identical unpressurized vehicles on traverse,each capable of transporting the entire crew Image credit: NASA

  27. Mars Surface Power System Metrics Power output to user during typical Martian day(solar power generation, non-tracking arrays) • Metrics for performance-based analysis: • Mass-specific average power [W/kg] • Volume-specific average power [W/m3] • Two options for evaluation: • Equal-power analysis: all architectures provide the same power to the user at any time • Equal-energy analysis: each architecture provides the same energy per day to the user Day Energyrequired tochargeenergystorage Power profile over Martian day Night Energyavailable fordaytime use • Nuclear fission and dynamic RTG systems insensitive to evaluation option • Photovoltaic systems with energy storage very sensitive to evaluation options • Comprehensive analysis based on equal-energy analysis and evaluation

  28. Mars Surface Power Architectures

  29. Latitude-Dependence of Performance for Solar Power

  30. Considerations for Large Solar Array Fields on Mars • Mars surface deployment (manual after crew arrival): • Considered a 10,000 m2 rollout array field which will provide 63 kW average power for about 100 kW daytime power • Assume array blankets are 2 m wide for easy storage and handling by two astronauts, need 14 blankets total • Assume astronauts can unroll array at a walking speed of 1 m/s, requires only 3 hrs for unrolling; total deployment time about 17 hours for 2 crew • Robotic deployment technology would enable solar power for in-situ propellant production; nuclear fission power requires robotic deployment • Power generation during manual deployment following landing: • Mars surface energy storage system is brought with crew, charged full during Earth Mars cruise and / or Mars orbit loiter • System can provide 20 kW for 14 hours; 10 kW for 28 hours • Dealing with global dust storms and dust removal: • Experience with the Mars Exploration Rovers suggests that during a global dust storm, arrays provide 10% or more of clear skies power output • For full power, crew needs to clean arrays periodically (~once every 30 days) • Array degradation due to radiation, dust: • Reuse of arrays from mission to mission requires new arrays to make up for degradation

  31. MinMars Surface Power System • For the MinMars toehold, a power system based on thin-film amorphous silicon arrays and Li-Ion batteries was selected (30 degree northern lat.): • Usable energy per day: 63 kWe x 24.5 h = 1543.5 kWhe • Peak power: ~200 kWe Nighttime power: 12 kWe • Mass: 6000 kg • Volume (stowed): 36 m3 • Replacement units with an additional 20000 kWe are brought every opportunity (1000 kg, 6 m3) • This is a conservative estimate, because the reuse of batteries from landers and from mobility chassis in the surface power system is not considered and nighttime power demand is assumed to be 16 kWe (high)

  32. MinMars Surface Energy Usage • Total energy provided: • 63 kWe x 24.5 h = 1543.5 kWhe • Energy consumption by habitation and ISRU: • ISRU: 20 kWe x 24.5 h = 490 kWhe • Life support: 4 kWe x 24.5 h == 98 kWhe • Crew systems: 2 kWe x 24.5 h == 49 kWhe • Other habitation (avionics, comm, etc.): 2 kWe x 24.5 h = 49 kWhe • Battery charging: 12 kWe x 2 x 14 h = 336 kWe • Total: 1071 kWhe • Energy available for mobility and science: 472.5 kWhe Mobility+ science ISRU Battery charging Life support, habitation

  33. Agenda • Introduction and motivation • Overall architecture • Transportation: cargo and crew • Surface infrastructure and mobility • Life support, ISRU, and resupply logistics • Launch manifest • Notional net-present-cost analysis • Expanding the toehold into a colony • Impact of new technologies on the architecture • Interesting topics for future work

  34. Life Support System Design

  35. In-Situ Resource Utilization • ISRU system provides oxygen and buffer gas production for habitation and EVA: • Oxygen: 10 kg / d • Buffer gases (Ar, N2): 0.72 kg / d • System design is based on the NASA Mars DRM 1.0 ISRU system design • Design is scaled down, 4 units, operated only during the day • No methane production using Sabatier or water electrolysis • System mass: 4 x 828 kg = 3312 kg • System volume: 3 x 10 m3 = 40 m3 • System power demand: 60 kWe for 8 hours during the day • One additional ISRU unit is brought every opportunity (sort of a spare part) • No water ISRU initially Image credit: NASA

  36. Consumables and Spare Parts

  37. Agenda • Introduction and motivation • Overall architecture • Transportation: cargo and crew • Surface infrastructure and mobility • Life support, ISRU, and resupply logistics • Launch manifest • Notional net-present-cost analysis • Expanding the toehold into a colony • Impact of new technologies on the architecture • Interesting topics for future work

  38. Launch 1 / Flight 1: Hab module #1 Launch 2 / Flight 2: Hab module #2 Launch 3 / Flight 3: Hab module #3 Launch 4 / Flight 4: Hab module #4 Launch 5 / Flight 5: Mobility chassis #1 ISRU unit #1 Launch 6 / Flight 6: Mobility chassis #2 ISRU unit #2 Launch 7 / Flight 7: Power system #1 ISRU unit #3 Launch 8 / Flight 8: Power system #2 ISRU unit #4 Launch 9 / Flight 9: Power system #3 Inflatable module #1 Launch 10 / Flight 10: Power system #4 Inflatable module #2 Launch 11 / Flight 11: Power system #5 Emergency spares Launch 12 / Flight 12: Power system #6 Emergency spares Manifest Opportunity 1 (Prepositioning)

  39. Launch 1 / Flight 1: Resupply module #1 Launch 2 / Flight 2: Resupply module #2 Launch 3 / Flight 3: Resupply module #3 Launch 4 / Flight 4: Resupply module #4 Launch 5 / Flight 5: Resupply module #5 Launch 6 / Flight 6: Resupply module #6 Launch 7 / Flight 7: Resupply module #7 Launch 8 / Flight 8: Resupply module #8 Launch 9 / Flight 9: Water resupply #1 Mobility chassis #3 Launch 10 / Flight 10: Water resupply #2 Inflatable module #3 Launch 11 / Flight 11: Water resupply #3 Inflatable module #4 Launch 12 / Flight 12: Water resupply #4 Emergency spare parts Manifest Opportunity 2 (Prepositioning)

  40. Launch 1: ITH #1 Launch 2: ITH #2 Launch 3: Earth departure stage #1 Launch 4: Earth departure stage #2 Launch 5: Earth departure stage #3 Launch 6: Earth departure stage #4 Launch 7: Delivery of the crew to the ITHs Launch 8: Mobility chassis #3 Emergency spare parts Launch 9 / Flight 9: Emergency food Emergency water Launch 10 / Flight 10: Emergency food Emergency water Launch 11 / Flight 11: Emergency food Emergency water Launch 12 / Flight 12: Emergency food Emergency water Manifest Opportunity 3 (Crew Transfer)

  41. Launch 1 / Flight 1: Resupply module #1 Launch 2 / Flight 2: Resupply module #2 Launch 3 / Flight 3: Resupply module #3 Launch 4 / Flight 4: Resupply module #4 Launch 5 / Flight 5: Resupply module #5 Launch 6 / Flight 6: Resupply module #6 Launch 7 / Flight 7: Resupply module #7 Launch 8 / Flight 8: Resupply module #8 Launch 9 / Flight 9: Water resupply #1 Mobility chassis #4 Launch 10 / Flight 10: Water resupply #2 ISRU unit #5 Launch 11 / Flight 11: Water resupply #3 Power unit #7 Launch 12 / Flight 12: Water resupply #4 Discretionary Manifest Opportunity 4 (Resupply)

  42. Launch 1 / Flight 1: Resupply module #1 Launch 2 / Flight 2: Resupply module #2 Launch 3 / Flight 3: Resupply module #3 Launch 4 / Flight 4: Resupply module #4 Launch 5 / Flight 5: Resupply module #5 Launch 6 / Flight 6: Resupply module #6 Launch 7 / Flight 7: Resupply module #7 Launch 8 / Flight 8: Resupply module #8 Launch 9 / Flight 9: Water resupply #1 Mobility chassis #5 Launch 10 / Flight 10: Water resupply #2 ISRU unit #6 Launch 11 / Flight 11: Water resupply #3 Power unit #8 Launch 12 / Flight 12: Water resupply #4 Discretionary Manifest Opportunity 5 (Resupply)

  43. Agenda • Introduction and motivation • Overall architecture • Transportation: cargo and crew • Surface infrastructure and mobility • Life support, ISRU, and resupply logistics • Launch manifest • Notional net-present-cost analysis • Expanding the toehold into a colony • Impact of new technologies on the architecture • Interesting topics for future work

  44. Net-Present-Cost (NPC) Analysis Assumptions Notional • Cost estimates for spacecraft, surface infrastructure, and propulsion systems carried out with mass-based CERs • All estimates in FY04 $ Mn • Launch cost for a Falcon 9 Heavy class launch vehicle assumed to be FY04 $ 150 Mn • Learning rates (and associated reduction of unit costs) not included in the analysis presented here • Non-discounted as well as discounted analyses (sensitivity analysis to discount rate) • Time horizon for DDT&E: 5 opportunities (~ 10 years)

  45. NPC Results (5% Discount Rate) Notional

  46. NPC Results (10% Discount Rate) Notional

  47. NPC by Category Notional Non-discounted 5% discount rate 10% discount rate

  48. MinMars Conclusions • Establishing a permanently inhabited toehold outpost for 4 crew is feasible with existing technologies or modest extensions thereof • 12 Falcon 9 Heavy class launches required per opportunity • With a limitation of “chunk size” to 2 mt of payload on the surface of Mars, a number of assembly operations are required in order to establish and maintain the toehold • 7 assembly operations for assembling the habitat • 12 assembly operations per opportunity for resupply (roughly 1 assembly operation every two months) • Notional cost analysis indicates that the NPC of a4-person toehold may be on the order of $ 20 – 40 bn

  49. Agenda • Introduction and motivation • Overall architecture • Transportation: cargo and crew • Surface infrastructure and mobility • Life support, ISRU, and resupply logistics • Launch manifest • Notional net-present-cost analysis • Expanding the toehold into a colony • Impact of new technologies on the architecture • Interesting topics for future work

  50. Toehold Expansion • The toehold is intended as the nucleus for the development of a full, mostly self-sustained colony • Expanding the crew size may also be a “must” from the perspective of psychology • It is unlikely that the toehold would be expanded before re-supply cost can be reduced (i.e. fewer re-supply launches are required per person per opportunity) • The next slide shows an example of expansion without reduction of resupply cost • Following section provides suggestions for technology investments to reduced resupply needs (as well as operational risk)

More Related