Implementation at RAL

Implementation at RAL. Iouri Ivaniouchenkov on behalf of Elwyn Baynham, Tom Bradshaw, Tony Jones, Jim Rochford Engineering Department, RAL. MICE Collaboration meeting @ Columbia, 14 June 2003. Scope of presentation. Magnetic shielding : Latest results from magnetic simulation

Download Presentation

Implementation at RAL

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Implementation at RAL Iouri Ivaniouchenkov on behalf of Elwyn Baynham, Tom Bradshaw, Tony Jones, Jim Rochford Engineering Department, RAL MICE Collaboration meeting @ Columbia, 14 June 2003

  2. Scope of presentation • Magnetic shielding : Latest results from magnetic simulation • done by Jim Rochford • Layout & Safety: Current status MICE Collaboration meeting @ Columbia, 14 June 2003

  3. MICE magnetic field: Conclusion from previous work • MICE will produce magnetic field which extends outside experimental hall: Configuration 5 Gauss Line Final MICE R~6800 mm, Z~13400 mm Solenoid mode R~14200 mm, Z~19900 mm Modified solenoid mode R~14900 mm, Z~21000 mm • Magnetic simulations are under way. First results show that shielding can be • achieved by using steel cladding in the hall. MICE Collaboration meeting @ Columbia, 14 June 2003

  4. 8 m 20 mm 20 mm 8 m r =4 m Coil axis Coil axis 20 m 2d axi-symmetric model of iron shield 3d rectangular model of iron shield 8 m 4 m 20 mm 20 mm 6 m 20 m Coil axis Coil axis 2 m 20 m MICE magnetic shield: Models 8 m 3d rectangular model of iron shield extended to ground level 3d rectangular model of iron shield top half only MICE Collaboration meeting @ Columbia, 14 June 2003

  5. MICE magnetic shields: Iron BH curve for iron as used in the models MICE Collaboration meeting @ Columbia, 14 June 2003

  6. MICE magnetic shield: Cylindrical shield 5 gauss line is within cylinder wall z R Plot showing flux lines in cylindrical shield Bpeak=0.82T MICE Collaboration meeting @ Columbia, 14 June 2003

  7. MICE magnetic shield: Complete rectangular shield 5 gauss line 3d model of complete rectangular shield Bpeak=0.67T MICE Collaboration meeting @ Columbia, 14 June 2003

  8. MICE magnetic shield: Half of a rectangular shield 5 gauss line 3d model of ½ a rectangular shield Bpeak=0.93T MICE Collaboration meeting @ Columbia, 14 June 2003

  9. MICE magnetic shield: Extended half of a rectangular shield 5 gauss line 3d model of a rectangular shield extending to floor Bpeak=0.82T MICE Collaboration meeting @ Columbia, 14 June 2003

  10. MICE magnetic shield: Peak field in shield Peak field in shield for different models MICE Collaboration meeting @ Columbia, 14 June 2003

  11. MICE magnetic shield: Effect on the axis field Effect of the presence of the shield on the axis field MICE Collaboration meeting @ Columbia, 14 June 2003

  12. MICE magnetic shield: Forces Top Fx=0,Fy=-1470,Fz=0 Sides Fx=(+/-)1330, Fy=-150, Fz=0 1470N 1330N 150N Y X Z MICE Collaboration meeting @ Columbia, 14 June 2003

  13. MICE magnetic shield: Summary • 2d and 3d models agree well • Can effectively contain 5 gauss line within hall by using a 20mm thick rectangular shield. • Initial calculations of the forces on the shield are small • The field has a very small effect on the axis field MICE Collaboration meeting @ Columbia, 14 June 2003

  14. Magnetic shielding: Cost estimation • Structure: • 4 wall box 8 m (width) *6 m (height) * 20 m (length) * 20 mm • = 11.2 m^3 • Material : soft magnetic steel (£600 / tonne) • Steel cost: 11.2 m^3 * 7.9 tonne/m^3 = 25.28 tonnes • -> £ 15168 (= 21316 Euro = 24965 $US ) • Shielding cost = steel cost * 2(3) = £ 30336 (£ 45504) MICE Collaboration meeting @ Columbia, 14 June 2003

  15. MICE layout • AutoCAD drawing for MICE experimental hall plus ISIS machine hall plus ISIS control room is finished by Tony Jones. • Various options for the layout of MICE are being considered. • Consultations with ISIS and RAL Safety Officers are under way. MICE Collaboration meeting @ Columbia, 14 June 2003

  16. MICE layout: 2D Model MICE Collaboration meeting @ Columbia, 14 June 2003

  17. MICE layout: Options Exit Main gate Option 1 slope stay clear zone 5 m 3.9 m beam axis services zone cellar trench 2.3 metres deep 6.8 m door High level exit Concrete radiation shielding Steel magnetic shielding Scale: 1 m MICE Collaboration meeting @ Columbia, 14 June 2003

  18. MICE layout: Options Option 2 Exit Main gate slope stay clear zone 5 m 3.9 m beam axis services zone cellar 4.8 m trench 2.3 metres deep door 1.6 m High level exit Concrete radiation shielding Steel magnetic shielding Scale: 1 m MICE Collaboration meeting @ Columbia, 14 June 2003

  19. MICE layout: Options Exit Option 3 Main gate slope services zone 5 m 3.9 m beam axis stay clear zone cellar 4.8 m trench 2.3 metres deep door High level exit 1.6 m Components transportation: By crane, a part of roof slides off By crane, a part of roof folds up On a moving platform without taking roof off Scale: 1 m Steel magnetic shielding Concrete radiation shielding MICE Collaboration meeting @ Columbia, 14 June 2003

  20. MICE layout: Options Option 4 Exit Door moved Main gate door slope services zone 5 m 3.9 m beam axis stay clear zone cellar 4.8 m trench 2.3 metres deep door door High level exit >= 0.8 m Scale: 1 m Steel magnetic shielding Concrete radiation shielding MICE Collaboration meeting @ Columbia, 14 June 2003

  21. MICE Shielding: Steel-lead sandwich Combined shielding: magnetic shielding + radiation shielding - crainable/movable sections (5-6 tonnes each) - steel/lead sandwich Lead 100 mm Steel 20 mm Steel 20 mm Pb Lead vs. Concrete Gamma Attenuation Factor Eγ = 1 MeV Eγ = 10 MeV Lead: t=100 mm 3168 282 Concrete: t=540 mm 3187 Concrete: t=1080 mm 287 1 m * 1 m section: 1.45 tonnes 1m * 4 m section: 5.8 tonnes MICE Collaboration meeting @ Columbia, 14 June 2003

  22. MICE Layout MICE Collaboration meeting @ Columbia, 14 June 2003

  23. MICE Layout MICE Collaboration meeting @ Columbia, 14 June 2003

  24. MICE Layout & Safety: Summary • Fire safety: • - existing door can be moved (more floor space plus better excess to • MICE control room) • - put 2 more doors at the MICE shielding to minimize escape roots • - keep pathway open along MICE • Radiation safety: • - detailed information is required for the RAL Radiation Safety Officer in • order to be able to calculate the shielding -> request to MICE • - combined shield concept (steel-lead sandwiched panels) to make shielding • compact and crainable/movable • Layout : • - hall layout is done; • - various options for the MICE layout are under consideration MICE Collaboration meeting @ Columbia, 14 June 2003