Survey results
Download
1 / 12

Survey Results - PowerPoint PPT Presentation


  • 62 Views
  • Uploaded on

Survey Results. MAPA Summary of February 2010 Survey. Feedback through Surveys. A second MAPA survey was administered in February 2010 to DoDEA assistant principals, principals, assistant superintendents, and superintendents Approximately six months into implementation

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' Survey Results' - ilario


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
Survey results
Survey Results

MAPA

Summary of

February 2010 Survey


Feedback through surveys

Feedback through Surveys

A second MAPA survey was administered in February 2010 to DoDEA assistant principals, principals, assistant superintendents, and superintendents

Approximately six months into implementation

244 respondents -- 65%response rate









Next steps
Next Steps

MAPA Task Group

  • Answering the call for further professional development

  • Responding to the need to complete an entire cycle before collecting more data via a survey


Next steps1
Next Steps

Kaizen

September- October, 2010 – administer surveyafter cycle has ended

  • Analyze results, strengths, and deficiencies

    September– October 2010 - evaluate E-MAPA (automated, paperless application pilot)

  • Determine improvements needed

  • Complete and test changes

  • Determine capability for DoDEA-wide

    implementation

  • Implement throughout DoDEA


Next steps2
Next Steps

Kaizen

September– October 2010 – administer surveyafter cycle has ended

September– October 2010 -- evaluateE-MAPA


ad