State of the Project
Download
1 / 19

State of the Project SHARELIFE Delft, April 29th 2008 (Mathis Schröder) - PowerPoint PPT Presentation


  • 71 Views
  • Uploaded on

State of the Project SHARELIFE Delft, April 29th 2008 (Mathis Schröder). Agenda. Timeline: detailed schedule Translation and Certification Country pilot feedback Country pilot results. Tasks and Timetable (from March 2007). Phase 1: First Pre-Test by December 2007

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' State of the Project SHARELIFE Delft, April 29th 2008 (Mathis Schröder)' - ilar


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript

State of the ProjectSHARELIFE

Delft, April 29th 2008

(Mathis Schröder)


Agenda
Agenda

  • Timeline: detailed schedule

  • Translation and Certification

  • Country pilot feedback

  • Country pilot results


Tasks and timetable from march 2007
Tasks and Timetable(from March 2007)

  • Phase 1: First Pre-Test by December 2007

    First survey draft: finished in July 2007

    Programming: finished in September 2007

    1st pilot : finished successfully in September/October 2007

    2nd pilot: not in the field in January 2008, “in-house” testing

  • Phase 2: Main Survey ready by November 2008

    survey revision and translation for country pilots: March 2008

    country pre-testing: July 2008

  • Phase 3: “First Results” by December 2009

    data collection finished: June 2009

    cleaning and first evaluation: November 2009


Timeline pre test
Timeline – Pre-Test

  • Translations (LMU open):

    • Version 3.5 (changes from pilot): May 2nd to May 9th

    • Version 3.6 (pre-test version): May 16th to May 23rd

  • SMS/CAPI versions scheduled release:

    • Version 3.5 (generic): May 6th

      -> feedback until May 12th

    • Version 3.5 (country): May 16th (Translation!)

    • Version 3.6 (generic): May 16th

    • Version 3.6 (country): May 30th (Translation!)

  • SMS Server:

    • First version released May 9th

    • Final generic version May 16th


Timeline pre test1
Timeline – Pre-Test

  • Fieldwork material:

    • SRC prepares

    • To be delivered by May 13th

  • Preload database:

    • Prepared by MEA by May 16th

    • Checked by Agencies until pre-test starts in June

  • TTT:

    • Server SMS: May 19th, Frankfurt Airport, 10:30-16:00

    • Make sure Survey Agencies know!

    • May 27th-29th in Mannheim


Timeline pre test2
Timeline – Pre-Test

  • Pre-Test Field Duration:

    • National Training Sessions (NTS) from June 2nd to 13th

    • Deliver Data by July 18th (50 days after TTT)

  • After the pre-test…

    • Evaluation of pre-test results in August

    • Edesheim 21./22.8.

    • Translate the changes to final version

  • TTT September 23rd – 26th in Mannheim

  • Main Field Duration:

    • Start in October/November 2008

    • Be finished by March/April 2009



Adaptation
Adaptation

  • Certification

    • Done externally by cApStAn

    • Received a subset of the translated questions

    • Evaluate adaptations using the generic questionnaire

    • 14 Items in the first round, for all countries

    • Based on first round results, second round with 11 Items

    • 5 out of 10 versions went into second round

    • Overall, some flaws were found, some questioning the comparability of the questions across countries

  • For the LMU 3.5, each country will receive the results of the certification separately tomorrow (4-30)


Pilot feedback
Pilot - Feedback

  • Thanks to all CTLs for providing feedback!

  • The interviewer feedback is mainly positive

    • Interview enjoyable

    • Almost no technical breakdowns

    • Flexible modules order was not used

    • Corrections were made via the calendar

    • The search tool is not used…








Length summary
Length Summary

  • We are overall OK in terms of time

  • What happened in Denmark?

  • Some quick stats: 2% > 2.5 h 4% > 2 h 15% > 1.5 h 26% < 45 min 3% < 30 min

  • But: still add CV and Grip Strength


And what now
And what now…?

  • Cuts or changes have already been made in the…

    • AC module: moves starting at age 10

    • RE module: some questions out, clarified others (ISCO)

    • HS module: deleted some questions, combined others

    • HC module: major cuts in the loops for preventive care

    • RC module: cut the stillbirths and abortion loop

    • RP module: improved the marriage section

  • Addition in the GL-module on persecution

    • Thanks to Radim and Michal for pointing this out