Department of labor and industry construction codes and licensing division ccld
Download
1 / 17

Department of Labor and Industry Construction Codes and Licensing Division (CCLD) - PowerPoint PPT Presentation


  • 66 Views
  • Uploaded on

Department of Labor and Industry Construction Codes and Licensing Division (CCLD). 443 Lafayette Road N. St. Paul, MN  55155 Phone:  (651) 284-5005, Phone:  1-800-DIAL-DLI (1-800-342-5354) TTY:  (651) 297-4198 - www.doli.state.mn.us. License Fee Restructuring Project

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' Department of Labor and Industry Construction Codes and Licensing Division (CCLD)' - idola-moses


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
Department of labor and industry construction codes and licensing division ccld

Department of Labor and IndustryConstruction Codes and Licensing Division (CCLD)

443 Lafayette Road N. St. Paul, MN  55155

Phone:  (651) 284-5005, Phone:  1-800-DIAL-DLI (1-800-342-5354) TTY:  (651) 297-4198 - www.doli.state.mn.us

License Fee Restructuring Project

2010 – Legislative Initiative


Department of labor and industry construction codes and licensing division ccld1

Department of Labor and IndustryConstruction Codes and Licensing Division (CCLD)

  • Purpose of the Project

  • Provide better equity, transparency, and accountability to licensees

  • Improve efficiency and control costs

  • Efficiency

  • consolidate license processes

  • renewal cycles, refunds

  • late fees, exams processing

  • consistent statutory model

  • License Equity

  • Improve consistency

  • Assign costs to skill level

  • Separate individual/business

  • Fee for service transparency


Department of labor and industry construction codes and licensing division ccld2

Department of Labor and IndustryConstruction Codes and Licensing Division (CCLD)

  • Current License Fee Structure - History

  • Currently a pre-construction code consolidation structure

  • Business processes from 5 different agencies

  • 16 different license rates, ranging from $0 to $450

  • Very little transparency relating licensing cost and service

  • High maintenance and support costs


Department of labor and industry construction codes and licensing division ccld3

Department of Labor and IndustryConstruction Codes and Licensing Division (CCLD)

  • Proposed License Fee Structure

  • Single CCLD license fee structure

  • 4 different base license rates, $10 to $100

  • Consolidated fee statutes

  • Provide transparency using fee for service methodology

  • Contain maintenance and support costs

  • Agency revenue neutral based on FY’2009 collections - $5.2M

  • DLI fee model with justifiable costs


Department of labor and industry construction codes and licensing division ccld4

Department of Labor and IndustryConstruction Codes and Licensing Division (CCLD)

Proposed License Fee Structure (continued)


Department of labor and industry construction codes and licensing division ccld5

Department of Labor and IndustryConstruction Codes and Licensing Division (CCLD)

Total CCLD Licenses and Bond Filings Affected

  • Fees include:

  • License Amount

  • Continuing Ed.

  • Board Fees

Max increase = $100

Max decrease = $366

107,969 Lic/Bonds


Department of labor and industry construction codes and licensing division ccld6

Department of Labor and IndustryConstruction Codes and Licensing Division (CCLD)

Plumbing / Water Conditioning Licenses Affected

  • Fees include:

  • License Amount

  • Continuing Ed.

  • Board Fees

Max increase = $64

Max decrease = $66

Exam increase = $10-$25

13,796 Lic/Bonds


Department of labor and industry construction codes and licensing division ccld7

Department of Labor and IndustryConstruction Codes and Licensing Division (CCLD)

Electrical Licenses Affected

  • Fees include:

  • License Amount

  • Continuing Ed.

  • Board Fees

Max increase = $39

Max decrease = $1

Exam increase = $25

37,462 Lic/Bonds


Department of labor and industry construction codes and licensing division ccld8

Department of Labor and IndustryConstruction Codes and Licensing Division (CCLD)

Building Official Licenses Affected

  • Fees include:

  • License Amount

  • Continuing Ed.

Max increase = $53

Min increase = $23

Exam costs = $60

605 Licenses


Department of labor and industry construction codes and licensing division ccld9

Department of Labor and IndustryConstruction Codes and Licensing Division (CCLD)

Boiler Operator Licenses Affected

  • Fees include:

  • License Amount

Max increase = $30

Max decrease = $10

Exam costs = $60

34,436 Licenses


Department of labor and industry construction codes and licensing division ccld10

Department of Labor and IndustryConstruction Codes and Licensing Division (CCLD)

Boat Master Licenses Affected

  • Fees include:

  • License Amount

Max increase = $30

Exam costs = $60

403 Licenses


Department of labor and industry construction codes and licensing division ccld11

Department of Labor and IndustryConstruction Codes and Licensing Division (CCLD)

Residential Builder Licenses Affected

  • Fees include:

  • License Amount

  • Continuing Ed.

Max increase = $10

Max decrease = N/A

14,272 Licenses

864 Exemption certificates


Department of labor and industry construction codes and licensing division ccld12

Department of Labor and IndustryConstruction Codes and Licensing Division (CCLD)

High Pressure Piping Licenses Affected

  • Fees include:

  • License Amount

  • Continuing Educ.

  • Board Fees

Max increase = N/A

Max decrease = $346

Exam increase = $30

2,786 Licenses


Department of labor and industry construction codes and licensing division ccld13

Department of Labor and IndustryConstruction Codes and Licensing Division (CCLD)

Manufactured Home Licenses Affected

  • Fees include:

  • License Amount

  • Continuing Ed.

Max increase = $10

Max decrease = $100

250 Total Licenses


Department of labor and industry construction codes and licensing division ccld14

Department of Labor and IndustryConstruction Codes and Licensing Division (CCLD)

Elevator Contractor/Constructor Licenses Affected

  • Fees include:

  • License Amount

  • Continuing Ed.

  • Board Fees

Max increase = $24

Max decrease = $1

Exam increase = $25

605 Licenses bonds


Department of labor and industry construction codes and licensing division ccld15

Department of Labor and IndustryConstruction Codes and Licensing Division (CCLD)

Office of Enterprise Technology License Surcharge

  • Fee collected to build a statewide licensing system

  • 10% of license cost with a $5 minimum and $150 Maximum

  • Collection started in July of this year

  • Due to sunset in 6 years

  • Estimated surcharge fees have not been included here


Department of labor and industry construction codes and licensing division ccld16

Department of Labor and IndustryConstruction Codes and Licensing Division (CCLD)

Questions - Discussion


ad