WHY MAINTAIN. Atlantic Intracoastal Waterway Norfolk, VA to St. Johns River, FL AIWA Conference – Myrtle Beach, SC November 2011. Phase I DMMP 20-yr Dredging & Storage Requirements Review Existing Data Define Operational Channel Reaches

Download Presentation

WHY MAINTAIN

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Why maintain

WHY MAINTAIN

Atlantic Intracoastal Waterway

Norfolk, VA to St. Johns River, FL

AIWA Conference – Myrtle Beach, SC

November 2011


Plan overview

Phase I DMMP

20-yr Dredging & Storage Requirements

Review Existing Data

Define Operational Channel Reaches

Develop Dredged Material Management Strategies for each Reach

Identify Critical Reaches

PLAN OVERVIEW


Norfolk district critical reaches

NORFOLK DISTRICT CRITICAL REACHES

  • 1 Critical Reach (NOR-4)

    • No existing confining DAs within 2.2 mile reach

    • 2.2 MCY 20-year storage volume requirement


Wilmington district critical reaches

WILMINGTON DISTRICT CRITICAL REACHES


Charleston district critical reaches

CHARLESTON DISTRICT CRITICAL REACHES


Savannah district critical reaches

SAVANNAH DISTRICT CRITICAL REACHES


Jacksonville district critical reaches

JACKSONVILLE DISTRICT CRITICAL REACHES

  • 1 Critical Reach (JAX-2)

    • 11 mile reach with one proposed 35-acre DA

    • 56,000 cy deficient 20-year storage volume requirement


Brunswick ga

Brunswick,GA

  • Jekyll Reach


Funding crisis

Funding Crisis

  • NO Federal Dollars

  • State – GA NO Dollars

  • Locals – Limited Dollars


Locals not pay for usace

Locals Not Payfor USACE

  • Federal designated waterway

  • Federal responsibility

  • Will they really close the waterway?

  • Well, let’s find out

  • Let’s see how serious they are


Questions

QUESTIONS?

JOHN ADAMS, P.E.

Office: 904-731-7040

Cell: 904-434-2571

[email protected]


  • Login