OASIS PLCS TC Telecon 4 January 2007 Trine Hansen – DNV. Estimated budget – Phase I (As presented in face-to-face mtg in Huntsville 31 Oct 06). Contributions to the OASIS project. * Direct costs not included. **Includes more development activities than originally estimated. Way Forward.

Download Presentation

OASIS PLCS TC Telecon 4 January 2007 Trine Hansen – DNV

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. OASIS PLCS TC Telecon 4 January 2007 Trine Hansen – DNV

  2. Estimated budget – Phase I(As presented in face-to-face mtg in Huntsville 31 Oct 06) PLCS Inc. (c) 2002

  3. Contributions to the OASIS project * Direct costs not included **Includes more development activities than originally estimated PLCS Inc. (c) 2002

  4. Way Forward • Deadline for contribution to the project: Friday 12 January 07 • Establish a Steering Committee by 19 January • Detailed planning week 3 and 4 (15 – 26 January) • Presentation of detailed plan for the Steering Committee week 5 (29 Jan – 2 Feb) • If accept for detailed plan: Kick-off meeting for the Core Team 7 – 8 February PLCS Inc. (c) 2002

  5. Detailed planning • Questions to be sorted out: • Are all identified activities covered through the contributions? (such as harmonization activities) • Are direct costs included in the contributions (e.g. travel expenses)? • Time frame limitations in on-going projects • Named resources to be identified and allocated • Etc. • Detailed plan to be worked out by the PM. Assisted by Rob Bodington and Leif Gyllström • Identify budget for Contingency PLCS Inc. (c) 2002

  6. Working method • Identify a Core Team • Use Net meetings as far as possible • Face-to-face meetings when necessary – primarily for Core Team members • Assume procedures and quality requirements from the Quality Group, such as • Requirements for checklists, documentation of methods etc. • Procedures for how to handle disagreements • ….. PLCS Inc. (c) 2002

  7. The end PLCS Inc. (c) 2002