1 / 4

2013 Indiana Pre-Shift Contest

LC. LC. 2013 Indiana Pre-Shift Contest. FACE NOT BOLTED WITHIN 24 HOURS. Last row of Permanent support. ENTRY #1 OFFSIGHTS. Last row of Permanent support. FACE. FACE. FACE. x. x. x. Danger out last row. D I. D I. GT. GT. Danger out last row. X X X X. X X X X.

Download Presentation

2013 Indiana Pre-Shift Contest

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. LC LC 2013 Indiana Pre-Shift Contest FACE NOT BOLTED WITHIN 24 HOURS Last row of Permanent support ENTRY #1 OFFSIGHTS Last row of Permanent support FACE FACE FACE x x x Danger out last row DI DI GT GT Danger out last row X X X X X X X X Energized Continuous Mining Machine Last row of Permanent support LC DE-ENERGIZE X X X X DI GT Danger out last row DANGER DI Water Over Knee Deep Test hole DANGER DI X X NO TEST HOLE DANGER DI Test hole Water over Knee deep HANG CURTAIN High spot In roof DANGER DI Energized Non-permissible Pump X X GT DE-ENERGIZE AND MOVE 2.0% CH4 20.5% O2 NO TEST HOLE Test hole R O O F B A D GT DANGER DI GT2 DANGER DI X DANGER DI Energized Roof bolter HANG CURTAIN HANG CURTAIN Test hole DE-ENERGIZE D Test hole SCOOP ON RB CABLE Test hole Battery scoop X X NO TEST HOLE R/R R/R R/R COAL PILE 8’x10’x1’ BELT TAIL & FEEDER DANGER COAL PILE DANGER FLOAT DUST HANG CURTAIN AT TAIL FLOAT DUST ON RIBS Test hole Test hole X GT DI GT DI PRY BAR LC X NO LIFELINE R LC LC X X R X X POWER CENTER D GT DI X X CLOSE REGULATOR DOOR OPEN PROBE Test hole CLOSE DOOR THREE BELT ROLLERS SCALE 1” = 10’ NO LIFELINE

  2. LC LC 2013 Indiana Pre-Shift Contest Last row of Permanent support Last row of Permanent support FACE FACE FACE x x x X X X X X X X X Energized Continuous Mining Machine Last row of Permanent support LC X X X X Water Over Knee Deep Test hole X X Test hole Water over Knee deep High spot In roof Energized Non-permissible Pump X X 2.0% CH4 20.5% O2 Test hole R O O F B A D X Energized Roof bolter Test hole Test hole Test hole Battery scoop X X COAL PILE 8’x10’x1’ BELT TAIL & FEEDER FLOAT DUST ON RIBS Test hole Test hole FIREBOSS STATION X PRY BAR LC X R LC LC X X R X X POWER CENTER X D X X DOOR OPEN PROBE Test hole THREE BELT ROLLERS TEAM NO. ______ FIELD NO. ______ SCALE 1” = 10’

  3. 2013 Indiana Pre-Shift Contest FIREBOSS STATION POWER CENTER X TEAM NO. ______ FIELD NO. ______ SCALE 1” = 10’

  4. Typical Ventilation Map R POWER CENTER

More Related