An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ERCOT Update on UFLS Annual Survey with TSP/DSP September 2014

  2. Background on UFLS Survey Requirement • ERCOT coordinated and conducted an annual survey on May 13, 2014 with the TSPs and DSPs to ensure that the required automatic under-frequency load shed circuits were configured to provide the appropriate load relief in an under-frequency event as required by table below from Operating Guides 2.6.1(1) Requirements for Under-Frequency Load Shedding:

  3. Results of UFLS Survey Requirement Below is a list of dates and activities reflecting the timeline and coordination of this survey: • 04/23/2014 - ERCOT announcement of survey timeline and effort to OWG • 04/10/2014 -  ERCOT email notification sent by Client Services to TSP/DSP Authorized Representatives • 05/13/2014 -  Survey test day • 06/13/2014 -  Survey results due back to ERCOT • September/October-  Results compiled and being reported to OWG/ROS/TAC

  4. Execution of UFLS Survey Requirement The results of the requirement were successful and are reflected below: ERCOT Reliability and Compliance contacted several participants to request that the 5%, 10%, 10% breakdown be adhered to, if possible. Some participants met the 25% total but had more load in the 5% or one of the 10% brackets and not quite 10% in the other bracket

  5. Execution of UFLS Survey Requirement The survey submitted by the participants indicated that they all could meet the 25% minimum requirement. Some participants met the cumulative 25% total by having more load in one bracket but not the minimum amount in another bracket. The load was reallocated to different relays to meet this minimal requirement of at least 5%, 10%, 10% in each bracket.