1 / 12

#3224 Sat 17 th November

#3224 Sat 17 th November. Restored an “AP” set-up with some measurement of Twiss. The idea was to take some BPM data with a known twiss set-up to see how the bunch-to-bunch position variation correlates with the T wiss. Took BPM data in AR1. Scanned AR1-Q1/4 to close dispersion

homer
Download Presentation

#3224 Sat 17 th November

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. #3224 Sat 17th November • Restored an “AP” set-up with some measurement of Twiss. • The idea was to take some BPM data with a known twiss set-up to see how the bunch-to-bunch position variation correlates with the Twiss. • Took BPM data in AR1. • Scanned AR1-Q1/4 to close dispersion • Scanned AR1-Q1/4 to make isochronous.

  2. #3224 Twiss • AP set up from #3139 • See \\Dlfiles03\alice\Analysis\Period 14 data\AP_period13and14\transversemodel\3139 • Repeated the same scans to compare Twiss repeatability. • ST1-Q1 scan Q2 = 0.6 A Q3/4 = 0 A • ST1-Q2 scan (0-1.4A) with Q1 = 0.40A.

  3. ST1-Q1 scan Q2 = 0.6 A Q3/4 = 0 A, beamsize measured on ST1-4 Yuri original meas’t on #3139 #3224. Position of minimum looks similar but curve much shallower My analysis of #3139

  4. ST1-Q2 scan (0-1.4A) with Q1 = 0.40A. beamsize measured on ST1-4 No plot available from Yuri’s file My analysis of #3224 My analysis of #3139

  5. Twiss Calculation Uses parabolic fit to σ^2 vsk.l Constrain parabola vertical offset to smallest beamsize measurement

  6. Twiss Conclusions • NB: I didn’t go to divisor 20 like Yuri did. But I would expect the result (if any) of this would be to make my beamsizes on #3224 larger due to increased beam loading. However, my beamsizes are smaller. • I set up phases “accurately” to match #3224 60pC; BC=-10/+15deg; Lc = crests. Pb=1.2kW. • Comparison of the quad scan data suggests optics are not highly repeatable. Two months gap between measurements being compared. Maybe this is too long a gap.

  7. Model vs Measure #3224 ST2-2 AR2-1 ST1-3 ST2-1 Model/measure agreement not too bad

  8. Bunch intra-train variation/jitter compared with β function x-plane AR1-BPM-01 AR1-BPM-03 AR1-BPM-04 AR1-BPM-06 Plot sqrt(β) (~ beamsize) vsrms x position with the train, for each BPM trace. The β at each BPM comes from model on previous slide. There does seem to be strong correlation, perhaps expected. AR1-BPM-03 AR1-BPM-04 AR1-BPM-01 AR1-BPM-06

  9. After Twiss evaluation, restore the #3139 “AP” set up and study dispersion and R56 of AR1 AR1 Studies

  10. AR1 Dispersion Measured on AR1-BPM-06 Each plot is BPM x position vs beam energy Vary AR1-Q1/4 from 1.9 to 2.4 in 8 steps Dispersion (mm) vsAR1-Q1/4 current

  11. AR1 R56 measured on AR1-BPM-06 Each plot is BPM relative path length vs beam energy Vary AR1-Q1/4 from 1.9 to 2.4 in 8 steps R56 (mm) vsAR1-Q1/4 current AR1-Q1/4 current

  12. Summary R56 R16 AR1-Q1/4 current AR1-Q1/4 current Isochronous + zero dispersion condition at AR1-Q1/4 = 2.18 A

More Related