1 / 12

Please read this before using presentation

Please read this before using presentation. This presentation is based on content presented at the Registration of cranes information session held in July 2014

holmes-soto
Download Presentation

Please read this before using presentation

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Please read this before using presentation • This presentation is based on content presented at the Registration of cranes information session held in July 2014 • It is made available for non-commercial use (e.g. toolbox meetings, OHS discussions) subject to the condition that the PowerPoint file is not altered without permission from Resources Safety • Supporting resources, such as brochures and posters, are available from Resources Safety • For resources, information or clarification, please contact: RSDComms@dmp.wa.gov.au or visit www.dmp.wa.gov.au/ResourcesSafety

  2. Crane incidents in Western Australia – Recent learnings

  3. Power failure – testing runaways

  4. Power failure – testing – learnings Emergency stop devices do not always sufficiently simulate conditions under a power failure Depending on how the power failed, this can lead to a voltage “spike” Persons performing crane load tests require adequate testing criteria, and appropriate training to apply these criteria

  5. Deflection and/or alignment requirements – learnings Deflection and/or rail alignment requirements are as defined by: AS 1418.18 section 5.13 for structural deflections AS 1418.1 table 7.20.9 for the rail alignment DMP has identified mine sites with failed rails and rail fixings, primarily associated with misalignment and deflection incompatibility.

  6. Wind loading Uncontrolled movements of cranes due to wind load ‒why? Designs not considering correct loading or factors specified in AS 1170.2 Crane manufacturers not understanding design requirements Sites not following the requirements of design

  7. Wind runaways – requirements AS 1170.2 , section 2.3 states: AS 1418.1, section 2.2 states:

  8. AS 1170.0 table F3

  9. AS 1170.2 table 3.1

  10. Electrical isolation issues Regulation 5.29 Isolation of equipment Each responsible person at a mine must ensure that – electrical equipment at the mine is provided with full current isolating devices capable of being secured in the isolating position

  11. Typical arrangement of electrical isolation AS 1418, figure 8.10.2

  12. Recommended actions for isolation From AS 1418.1 … safety is frequently introduced by making the stop buttons latch in the open state, mechanically and by requiring a reset by a start button to re-establish the contactor independently of the reset of the stop button contacts. The system described may be characterised as fail-safe provided that the probability that the contactor will open when commanded (its intended service) is within the appropriate ranges…. Call these control switches rather than isolators – otherwise they need to be lockable