1 / 13

Recent changes in the NCEP global ensemble forecast system

Recent changes in the NCEP global ensemble forecast system. Yuejian Zhu, Zoltan Toth, Richard Wobus*, and Lacey Holland* EMC/NCEP *SAIC at NCEP September 19 2003 http://wwwt.emc.ncep.noaa.gov/gmb/ens/ Acknowledgements: H.-L. Pan, S. Lord, D. Michaud, and T. Marchok. Contents.

Download Presentation

Recent changes in the NCEP global ensemble forecast system

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Recent changes in the NCEP global ensemble forecast system Yuejian Zhu, Zoltan Toth, Richard Wobus*, and Lacey Holland* EMC/NCEP *SAIC at NCEP September 19 2003 http://wwwt.emc.ncep.noaa.gov/gmb/ens/ Acknowledgements: H.-L. Pan, S. Lord, D. Michaud, and T. Marchok

  2. Contents • Introduction • Configuration of NCEP global ensemble forecast system • Recent implementation (May 2003) • Performance statistics • Next implementation (Oct-Nov. 2003) • Ongoing research / Plans

  3. Introduction • NCEP global ensemble system operated daily since December 1992. • Initial perturbations are generated by Breeding method (Toth and Kalnay, 1993 1997) • Ensemble size: <10 --> 25 (now)  45 (next month) • Ensemble resolution: T62  T126 (first 180 hours) • Ensemble based products have been generated. • Wide range of users both nationally and internationally • Evaluation (including potential economic value)

  4. NCEP global ensemble current configuration • High resolution Control • 4 cycles (00, 06, 12, 18 UTC) • 3 different resolutions (from high to low) • Ensemble • 2 cycles (00, 12 UTC) • 2 different resolutions • 5 pairs (+/- perturbation) • BGM • Total • 1 low resolution control • 25 global forecasts/day

  5. Recent implementation (April 29 2003) • Motivation: Bring initial perturbation amplitude more in line with actual uncertainty in analysis • Compare fit of first guess to observational data with perturbation amplitude • Additional consideration: NCEP global ensemble does not account for model error • Set initial amplitudes somewhat above level of initial uncertainty (forecast error at 2-3 days matches ensemble pert. amplitudes) • Change: Revise mask used to set perturbation amplitudes: • 10% reduced for NH • 60% reduced for SH • 50% reduced for tropics • Experimental period: • 20020824 – 20020930 (38 days) • Results:1.5% (NH) and 7.6% (SH) RMS error reduction

  6. Experimental results (1) • NH 500hPa height Brier Skill Scores (BSS) and decomposition (resolution and reliability) • No significant impact by reducing spread by 10% • Similar results for PAC, RMS, and other probabilistic scores --- operational (control) --- I – reduced spread --- J – reduced spread

  7. --- Climate mean forecast Experimental results (2) --- operational (control) --- I – reduced spread --- J – reduced spread • Top: SH 500hPa height PAC • There is a significant improvement from short to medium range • Bottom: SH 500hPa height RMS errors • Similar to PAC, reduced spread, decreased RMS errors spread

  8. Experimental results (3) • Top: SH 500hPa height economic values for 10:1 cost-loss ratio • Experiments have higher values for all lead times • Bottom: SH 500hPa height ROC area skill scores (ROCASS) • Experiments improve probabilistic forecast skill

  9. Experimental results (4) • Tropical storm track errors • Atlantic, east Pacific and west Pacific regions • Comparing to operational ensemble, ensemble control and GFS

  10. Current performance (1) • 45-day statistics • Top: NH (20-80N) 500hPa height PAC for GFS, ensemble control and mean, ensemble mean is better than GFS for 4-day and beyond • Bottom: NH 500hPa height RMS for GFS, CTL, ensemble mean and climate, and ensemble spread

  11. Current performance (2) • 45-day statistics • Top: SH (20-80S) 500hPa height PAC for GFS, ensemble control and mean, ensemble mean is better than GFS for 1% for 5-day forecast • Bottom: SH 500hPa height RMS for GFS,CTL, ensemble mean and climate, and ensemble spread

  12. Next implementation • Time: October-November 2003 • Extending T126 model resolution from 84 hours to 180 hours • Increasing ensemble size from 25 to 45 by adding 10 (5 pairs) at 0600UTC and 10 (5 pairs) at 1800UTC • Adding more probabilistic forecast products: PQPF (old, total precipitation), PQRF(rain), PQSF(snow), PQIF(ice pellets) and PQFF(freezing rain)

  13. Ongoing work • Adapt ETKF for rescaling in (place of) breeding method (Wang and Bishop) • Explore new ways to account for model related errors in ensemble forecasting (use different/modified convective schemes, etc) • Bias-correct first and second moments of ensemble Plans • Develop North American Ensemble Forecast System (Joint work with Meteorological Service of Canada, for joint NCEP-MSC ensemble products) • Inter-compare 4 different ensemble-based data assimilation algorithms (collaborative work among 4 groups)

More Related