Status and Highlights of the Pulsed Magnet Program

Delivered 350 th science pulse > 70T in 75T magnets assembly. (March 2008) Completed rebuild & rework of 100T outsert coils 1-4, (November 2008)

hedva
Download Presentation

Status and Highlights of the Pulsed Magnet Program

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Delivered 350th science pulse > 70T in 75T magnets assembly. (March 2008) • Completed rebuild & rework of 100T outsert coils 1-4, (November 2008) • Completed assembly of 100T Outsert, (January 2009) • Science Program delivers 100th 85T pulse (Insert #1) (May 2009) • 1st insert fault , non destructive as predicted. (June 2009) • Completed conceptual design of Duplex user magnet upgrade. (October 2009) • Magnet Group awarded R&D 100 Award (MRI for Carry-on Liquids) (October 2009) • Science Program delivers 150th 85T pulse (Insert #2) (December 2009) • Completed conceptual design of 95T – 100T insert upgrade (May 2010) • Commissioned 4 MJ Capacitor bank for User Program (June 2010) • Insert #3 fabricated and delivered as a spare (June 2010) • Science Program delivers 177th 85T pulse (Insert #2) (July 2010) • Released Outsert Conductor Procurement Package (spare outsert work) (July 2010) • Complete 10mm CAD Package for 95T-100T Upgrade (August 2010) WR Status and Highlights of the Pulsed Magnet Program WR WR WR as of summer 2010, mid-point in current award period

  2. Deliver 2ndgeneration insert magnet upgrade (95T–100T ) (Jan 2011) • 95T attainable, 100T operations at proof of principal level • Deliver duplex magnet technology (> 70T ops for user program) (June 2011) • Complete fabrication of outsertcoil replacements coils 3,4,5,6 (Oct 2011) • Large cross section Cu-Nb conductor developed & delivered (July 2011) • Development in progress 2010 at Bochvar, #1 priority • Production of outsert coils #1 & #2 using Cu-Nb conductor • Enable increase in field from Outsert circuit #1 Visionfor the Pulsed Magnet Program (2012) TBD? TBD? as of summer 2010, mid-point in current award period

  3. Delivering sustained 100 T science pulses using 2nd generation coil upgrades. • Operating 10-50 MJ capacitor bank or new Lithium-ion battery bank. • User facility operating at 80T–85T using duplex magnet technology optimized for new power technology. • coils use enhanced composite and conductor technologies. • Implementing 3rd generation coil technology for generator magnets. • 3rd generation upgrades implement fault tolerant coil technology and enhanced materials. Visionfor the Pulsed Magnet Program (2017) as of summer 2010, mid-point in current award period