An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Session 3 – InjectionCONSIDERATIONS FOR 2012 Alick Macpherson Malika Meddahi Speakers: LeneDrosdal Wolfgang Bartmann Karel Cornelis Chiara Bracco

  2. Beam preparation in the injectors- Considerations for 2012 • Produce a list of nominal beam parameters in the injector chain and sick to it for regular physics operation; • Immediate gain: intelligent use of SPS scraping and no more stretched beam parameter requests • Decide on the SPS super cycle composition when filling LHC and stick to it: • 1 (or 2?) CNGS cycle(s) + LHC cycle (27 s to 33s cycle) – advantage: less time spent at LHC flat bottom (reduce emittance blow up) while compromising ZS sparks with high intensity • Accept the drawback : take FT cycle out so impact on PS users; • Agree on the strategy: Pilot - then steering of TL with12b – then 4x36b checks in the SPS (15’) – then filling for physics with NO more changes in PSB and PS. • To note: • improvement: no more sequence changes in the SPS injectors (from 12b to 36b)! • ZS limitations - maybe need more resources on 2012 investigations

  3. Injection -Considerations for 2012 CONTINUE • Studies on TL stability (Lene + Verena) for fewer TL beam steering Give early SPS beam time for MSE4/6 and MKE4 (G. Le Godec + ABT) • Improving tools • IQC - trajectory at collimators, envelopes for monitors and correctors, intensity dependent and thus easy colour code • Transverse diagnostics in the injector chain • Mitigation and cure campaigns concerning beam losses and protection (shielding, BLM sunglasses, moving/adding TCDIs) • Dedicated beam time for injection and beam dump systems w/wo beam to properly test components (new electronics, SW, FW....) and set up (collimators, IQC references for steering...) • Respect safety instructions (Experiments off during injection, MKI vacuum and temperature interlocks)

  4. Injection - summary • Beam preparation in the injectors – agree on beam parameters and strategy …. and document them • Beam transfer and injection • Reducing the beam losses : Tracking the culprits of the instability observed and curing the problems; • Protection against beam losses and potential damages: Mitigation and new measures being put in places; • All in place to not reproduce the problems encountered with the HW and SW during 2011 • Beam time needed as soon as the machine restart to re-commission and set-up the injection and beam dump systems.