Craig Landefeld, P.E. Construction Pavements Engineer. 2013 C&MS Pavements Specification Updates. Major Changes. 499 – Concrete General 255 – Full Depth Removal and Rigid Replacement 451 – Reinforced Portland Cement Concrete Pavement

Download Presentation

2013 C&MS Pavements Specification Updates

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


2013 c ms pavements specification updates

Craig Landefeld, P.E.

Construction Pavements Engineer

2013 C&MSPavements Specification Updates


Major changes

Major Changes

  • 499 – Concrete General

    • 255 – Full Depth Removal and Rigid Replacement

    • 451 – Reinforced Portland Cement Concrete Pavement

    • 452 – Non-Reinforced Portland Cement Concrete Pavement

    • 455 – Quality Control Plan (QCP), Testing and Assurance…

    • 608 – Walks, Curb Ramps, and Steps

    • 609 – Curbing, Concrete Medians, and Traffic Islands

  • 202 – Removal of Structures

  • 251 – Partial Depth Pavement Repair

  • 320 – Rubblize and Roll

  • 423 – Crack Sealing

  • 615 – Roads and Pavements for Maintaining Traffic


499 concrete general

499 - Concrete General

  • What drove the 499 specification changes?

    • Experience with quality products from QC/QA

    • Bridge deck evaluation research of 2008/2009


2013 specification changes

2013 - Specification Changes


2013 specification changes1

2013 - Specification Changes

  • What drove specification changes?

    • Experience with quality products from QC/QA

    • Bridge deck evaluation research of 2008/2009

    • ODOT inspection staff

    • Opportunity to use industry expertise

    • Best practices from other states

      • Only 1 reported state from 34 responding has prescription mixes.

      • Texas Pavement example:


2013 specification changes2

2013 - Specification Changes


2013 specification changes3

2013 - Specification Changes


2013 specification changes4

2013 - Specification Changes


2013 499 concrete general

2013 - 499 Concrete General

499 Specifications changes

  • A new mix table

  • Incorporates seven mix classes


499 specification changes

499 Specification Changes


2013 499 specification changes

2013 - 499 Specification Changes

  • Supplier owns the mix design for ALL QC mixes

  • Adjustments greater than 100 lbs. require Engineer approval.

  • Supplier must maintain gradation in Zone II of the Coarseness Factor Chart.


2013 499 specification changes1

2013 - 499 Specification Changes


2013 499 specification changes2

2013 - 499 Specification Changes

  • Supplier owns the mix design for ALL QC mixes

  • Adjustments greater than 100 lbs. require Engineer approval.

  • Supplier must maintain gradation in Zone II of the Coarseness Factor Chart.

  • Temperature increase to ACI 95F .

  • Partial hand written batch tickets not

    an option


2013 concrete pavement specification changes

2013 – Concrete Pavement Specification Changes

Seven Major Specifications were revised or created

  • 499 Concrete - General

    • Prescription mixes Class F, C, S, HP, MS, FS are gone

    • Well graded aggregate requirements for both 451/452 and 511.

  • 451/452 Concrete Pavement

    • Revisions to adopt SS 888 ODOT QC/QA pavement concrete specifications

    • 455 Quality Control Plan, Testing QC/QA Concrete

      • Incorporates concrete quality control specifications for 511 and 451/452 into one document

  • Supplements 1126/1127

    • S1126 Mix design submittal for JMF

    • S1127 New Pay factor criteria for 451, 452 and 511

      Three other pavement specifications were updated to reflect material changes

    • 255 Full Depth Removal with Rigid Replacement

      • RRCM - special mix design for rapid repair concrete was added.

    • 608 Walks, Curb Ramps, and Steps

    • 609 Curbing, Concrete Medians, and Traffic Islands


451 452 specification changes

451-452 Specification Changes

  • Materials section was updated to reflect the modifications to 499.

    • References to 455 Quality Control Plan, Testing QC/QA Concrete

  • Basis of Payment was modified to include “with QC/QA” or without.

  • Longitudinal tining is now default. Transverse tining only allowed in small areas approved by Engineer.

  • MIT Scan-2 Equipment is required for

    DBI paving.

  • 451.18/S1127 Strength Pay Factors


2013 with qc qa or without

2013 – “with QC/QA” or without?

Without QC/QA

  • Contractor performs QC to meet CMS 499.

  • ODOT Perform QC checks on project for compliance with CMS 499 (slump, air, yield).

  • Beam for every 7500yd2 or fraction thereof daily by ODOT.

  • Supplier/Contractor responsible to assure your well graded aggregates are maintained in Zone II.

  • Core for every 2000yd2 by contractor per S1064.

    With QC/QA

  • CMS 455 governs QC/QA in addition to CMS 499


  • 455 quality control requirements

    455 Quality Control Requirements

    • Incorporates concrete quality control specifications from SS 888 and SS 898 for 511 and 451/452 into one document

    • Only when “with QC/QA” is specified in the bid item.

  • 451-452 – generally over 10,000 Sq Yd

  • Sets minimum requirements for Contractor’s Quality

    Control Plan (QCP).

  • Project Engineer must review and approve QCP and

    can require changes.

  • Sets the Quality Assurance testing requirements

    for the ODOT Project Staff.

  • Side by side air content – 10% of QC Samples

  • QA strength core for 1 in 10 QC Strength Cores


  • Supplement 1126 1127

    Supplement 1126 / 1127

    S1126 - Developing and Submitting a Portland Cement Concrete Mix Design for Acceptance

    • New supplement for Suppliers submission for JMF.

      S1127 - Pay Factors Determination for Pavement and Structure Concrete

    • Provides direction for pay factor determination and example calculations.


    2013 c ms pavements specification updates

    • 202 – Steps Removed can be Lump or Foot

      • Measure along the front edge of each tread. Include the width of an integral wall in the width measurement.

    • 251 – Partial Depth Pavement Repair

      • Partial Depth repairs can now be paid for by the Square Yard or Cubic Yard.


    320 rubblize and roll

    320 – Rubblize and Roll

    • Spec only applies to Reinforced Concrete Pavements.

    • Construction test pit requirements are redefined.

    • Particle size control has been adjusted.


    423 crack sealing hot applied

    423 – Crack Sealing, Hot applied

    • All items can now be paid for in Square Yards (Square Meters), in addition to Pounds (Kilograms).


    615 roads and pavements for maintaining traffic

    615 - Roads and Pavements for Maintaining Traffic

    • Section 615.01 Description work has been revised to include the removal of appurtenances.

    • For rigid pavements, deleted the use of Class C concrete and replaced it with Concrete, Class QC 1.

    • Section 615.10 Basis of Payment: Roads for Maintaining Traffic will include the installation, maintenance, and removal of all fencing, earthwork, guardrail, sidewalk, and all other items as necessary to provide a complete, functional, and safe installation.


    Odot pavements specification changes 2013 cms

    ODOT Pavements Specification Changes 2013 CMS

    Questions??