1 / 11

NFMCC Friday Meeting January 4, 2008

NFMCC Friday Meeting January 4, 2008. Optical Diagnostic Results of MERIT Experiment at CERN HeeJin Park. Total 360 beam shots performed. Images for 260 beam shots are collected. MERIT beam shot summary website,

Download Presentation

NFMCC Friday Meeting January 4, 2008

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NFMCC Friday Meeting January 4, 2008 Optical Diagnostic Results of MERIT Experiment at CERN HeeJin Park

  2. Total 360 beam shots performed. Images for 260 beam shots are collected. MERIT beam shot summary website, http://www.hep.princeton.edu/~mcdonald/mumu/target/hkirk/MERIT_Beam_Program_110607.pdf Optics Configuration with respect to Beam Z=0

  3. Observation : Interaction of Hg Jet with 14 GeV Beam 5T, 16TP 10T, 12TP 0T, 8TP 0T, 4TP 10T, 20TP 5T, 16TP

  4. Observation : Velocity of Splash, 24GeV 3.8TP, 10T V = 24 m/s t=0.375 ms t=0.175 ms t=0 t=0.150 ms 6TP, 5T V = 47 m/s t=0.375 ms t=0.050 ms t=0.175 ms t=0

  5. Observation : Velocity of Splash, 24GeV 10TP, 10T V = 54 m/s t=0.375 ms t=0.175 ms t=0 t=0.075 ms 20TP, 10T V = 65 m/s t=0.375 ms t=0.050 ms t=0.175 ms t=0

  6. Horizontal Scan with Target In, 14GeV Program

  7. Intensity Scan, 14GeV Program

  8. Threshold Scan, 14GeV Program

  9. Intensity Scan, 24GeV Program

  10. Intensity Scan, 14GeV vs 24GeV Program

  11. Conclusions • It is observed that the splash begins at the bottom of jet and ends at the • top of jet. which is consistent with the beam trajectory. • Under relatively strong intensity of beam, jet breaks up but can be confined • by magnetic field. The breakup line might be consistent with the beam • trajectory and the product of cavity caused by the energy deposition of beam. • 2. The splash velocity increases as the beam intensity goes up. • However, magnetic field will reduce the effect. • 3. As the beam intensity goes up, the interaction length increases and it is • somewhat suppressed by magnetic field. • 4. 24GeV beam has longer interaction length than 14GeV beam. The intensity • of threshold in 24GeV beam is lower than 14GeV beam.

More Related