1 / 12

Electric Vehicle Charging

Electric Vehicle Charging. CCI Fund EVSE Vendor's Eligible Product Line Overview - October 30, 2012. Powering Businesses Worldwide for 100 Years. Founded in 1911 by J.O. Eaton World Headquarters in Cleveland, OH USA Electrical Headquarters in Pittsburgh, PA USA

harmon
Download Presentation

Electric Vehicle Charging

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Electric Vehicle Charging CCI Fund EVSE Vendor's Eligible Product Line Overview - October 30, 2012

  2. Powering Businesses Worldwide for 100 Years Founded in 1911 by J.O. Eaton World Headquarters in Cleveland, OH USA Electrical Headquarters in Pittsburgh, PA USA Regional Headquarters in Shanghai, China; Morges, Switzerland; Sao Paulo, Brazil Innovation Centers in the USA, China, and India Customers in More Than 150 Countries 2011 Sales of $16.0 Billion Approx. 70,000 Employees Chairman & CEO – Alexander M. Cutler US Assembly of EVSE (Williamsburg, VA and Asheville, NC)

  3. EatonEVSE Family Level 1 16amp Receptacle Level 1 & 2 AC 16 & 30amp Level 2 AC 30-70amp DC Quick Charger 12 – 18 Hours 4 - 8 Hours 4 - 8 Hours 20 – 30 Minutes

  4. Level 2 AC – Commercial / Fleet • Product Details • Level 2 configuration (208V or 240V) • Wall-mount or Pedestal • Field Upgradeable • NEMA 3R Rating • SAE J1772 compliant • ETL listed to UL 2594/2231/1998 & CSA C22.2 No178 • Easy operation, no start/stop buttons • Modbus RTU and Serial communications • Optional: Level 1 outlet • ChargePoint enabled • Access Control • Credit Card Swipe

  5. Options & Peripherals Product Details Level 1 outlet – 120VAC, separate feed 1% Meter for Level 2 AC Integrated JACE-2 or JACE-6 (-6 American) ChargePoint Network (RFID Card only or with Contactless Credit Card option) Basic RFID – lock & key access Synchronous code generation keypad – stored codes, time based codes, pay by phone service Field Upgradable Control Station Plates

  6. Eaton ChargePoint enabled • Product Details • ChargePoint Network option: • - Two offerings for access control / payment • - ChargePoint card only (based on service plan can be monetized or not) • - ChargePoint card and Contactless Credit Cards (EMV) • - Three types of Communications gateways • - GSM/GPRS USA (AT&T) • - GSM/GPRS Canada (AT&T) • - CDMA (T-Mobile / Sprint/ Verizon) • - Software “service plans” available but contract will be held with Coulomb Technologies, Inc. Shown as ChargePoint card & Contactless Credit Card accepted

  7. EV Simulator – Test Fixture Product Details Electric Vehicle simulation with any SAE J1772 EVSE SAE J1772 specification verification Ground Fault condition simulation Ability to test 120V & 240V system Durable, engineered resin enclosure Easy certification of EVSE installation

  8. DC Quick Charger – Commercial / Fleet Product Details 125A, 208VAC 3-phase, 3-wire 400VDC output – up to 50kW power CHAdeMO connector ****** Free-standing floor mounted Rear, side, bottom conduit entry Outdoor rated, up to 15FT cable Est. Charge Time: 20-30 minutes to 80% Compatible with Nissan LEAF and Mitsubishi i-MiEV ETL Mark (Certified to UL & CSA) DC Technology expertise needed as inverters move from vehicle to EVSE

  9. DC Quick Charger Interior Main Control Box Power Unit #1 Power Unit #2 Power Unit #3 Power Unit #4 Power Unit #5 • Product Details • Utilizes 10kW power drawers • 20-50kW output offered • Field upgradeable • 10kW increments up to 50kW • Utilizes N-1 technology • Allows for charging with loss of one power drawer • Software programmable kW output rate • Aids in demand planning • Charge Session time/date stamp with Energy usage available • Options coming soon - • - ChargePoint Network • - Field upgrade to SAE standard

  10. Eaton…throughout the lifecycle of the building… Engineering & Consulting Services Turnkey & Modernization Services Contract & Support Services Power Distribution Aftermarket Engineering Services Energy Solutions Major Projects Federal Systems Software & Meters • Federal Government Contract Management • Turnkey projects • Engineering & Field Services • MV Breaker Replacement • LV Breaker Replacement • Equipment Rebuild and Reconditioning • Life Extension & Modernization • Arc Flash Solutions • Recycling Services • Power System Engineering & Studies • Arc Flash & Safety Studies • Power Chain Audits • Power System Automation • Systems Int. • Metering Systems • Alternative Energy • Turnkey Projects >$500k • Project Management • Meters • C-Comms • X-Comms • Software • Power Quality • Energy Management • Startup & Commission • Extended Warranty • Maintenance Contracts • Testing & General Field Services • Small Projects • Renewal Parts • 24/7 Response • Energy Audits • Engineering, Design, & Consulting • Performance Contracting • Turnkey Energy Saving Projects • Demand Side Management • Supply Side Management

  11. It’s more than just an EVSE...It is an extension of the distribution system. Loadcenters Circuit Breakers Utility Meters EVSE Equipment The Canadian & National Electric Codes delineates that the EVSE must be considered a 100% dedicated load requiring 125% upstream protection “Overcurrent protection for feeders and branch circuits supplying electric vehicle supply equipment shall be sized for continuous duty and shall have a rating of not less than 125 percent of the maximum load of the electric vehicle supply equipment.” - Article 625.21 Installation Some installations may be easy and inexpensive, but some may also require service or equipment upgrades that can which can make installation more complex A Reliable Partner is One That Understands the System

More Related