1 / 28

Outline

King Fahd University of Petroleum and Minerals Mechanical Engineering Department Maintenance and Preventive Maintenance of Heavy Equipment Coop Training : Central Heavy Equipment Department In Aramco. Outline. Central Heavy Equipment Department Heavy Equipment Shops Cases Study Conclusion.

hao
Download Presentation

Outline

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. King Fahd University of Petroleum and MineralsMechanical Engineering DepartmentMaintenance and Preventive Maintenance of Heavy EquipmentCoop Training : Central Heavy Equipment Department In Aramco

  2. Outline • Central Heavy Equipment Department • Heavy Equipment Shops • Cases Study • Conclusion

  3. Central heavy equipment department • 1. Dhahran Equipment Pm/Field Repair Service Unit • 2. Patch & Dispatch Unit • 3. Quality Control Unit • 4. Electric Shop Unit • 5.Heavy Equipment Shops Unit

  4. Heavy Equipment Shops • 1. Crane Shop • 2. Dozer Shop • 3. Fuel Room • 4. Pumps Rebuild Shop

  5. Case Study 1: Portable 900KW Generator

  6. Case study 1 Portable 900KW generator

  7. Case study 1 Portable 900KW generator • Quality Control Unit

  8. Case study 1 Portable 900KW generator

  9. Case study 1 Portable 900KW generator Repair cost: Alternative #2: : Repair Cost Estimate with External Overhaul or Replacement

  10. Case study 1 Portable 900KW generator • Alternative #1: % of Repair Cost vs. New Unit Cost: 27000/300,000 = 9% • Alternative #2: % of Repair Cost vs. New Unit Cost: 123000/300,000 = 41 % Repair cost:

  11. Case study 1 Portable 900KW generator

  12. Case Study 2: AT-750BE Crane

  13. Case study 2 AT-750BE Crane

  14. Case study 2 AT-750BE Crane

  15. Case study 2 AT-750BE Crane

  16. Case study 2 AT-750BE Crane

  17. Case Study 3: The 89-0865 Forklift (10 T)

  18. Case study 3 89-0865 Forklift

  19. Case study 3 89-0865 Forklift

  20. Case study 3 89-0865 Forklift

  21. Case study 3 89-0865 Forklift

  22. Case study 4 Pipe Loader

  23. Case study 4 Pipe Loader

  24. Case study 4 Pipe Loader

  25. Case study 4 Pipe Loader

  26. Case study 4 Pipe Loader

  27. Conclusion: • Value of time and commitment. • Value of team work. • maintenance of heavy equipment

More Related