West virginia cbp non tidal network 2006 status update
Download
1 / 8

West Virginia CBP Non-tidal Network: 2006 Status Update - PowerPoint PPT Presentation


  • 88 Views
  • Uploaded on

West Virginia CBP Non-tidal Network: 2006 Status Update . West Virginia Department of Environmental Protection West Virginia Department of Agriculture USGS West Virginia Water Science Center. Primary Sites CY 2006. 4 sites Patterson Creek near Headsville (USGS 01604500)

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'West Virginia CBP Non-tidal Network: 2006 Status Update' - hannelore


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
West virginia cbp non tidal network 2006 status update

West Virginia CBP Non-tidal Network: 2006 Status Update

West Virginia Department of Environmental Protection

West Virginia Department of Agriculture

USGS West Virginia Water Science Center


Primary sites cy 2006
Primary Sites CY 2006

  • 4 sites

    • Patterson Creek near Headsville (USGS 01604500)

    • South Branch Potomac River near Springfield (USGS 01608500)

    • Cacapon river near Great Cacapon (USGS 01611500)

    • Opequon Creek near Martinsburg (USGS 01616500)

  • All sites sampled using CBP methods


Non tidal primary site analytical parameters

Field parameters

Water temperature

Specific conductance

pH

Dissolved oxygen

Total Nitrogen

Dissolved Nitrate-Nitrite

Dissolved Nitrite

Dissolved Ammonium

Total Phosphorus

Dissolved Orthophosphorus

Total Suspended Solids

Suspended sediment concentration

Sand/Fine split (1 storm sample per quarter)

Non-Tidal Primary Site Analytical Parameters



Equipment history
Equipment History

All equipment on hand at beginning of sampling.


Cbp method implementation history
CBP Method Implementation History

  • All sites have been sampled using CBP methods from the start


2006 challenges
2006 Challenges

  • Funding stability

    • Current WVDEP and USGS-WVWSC funding fairly safe.


ad