West virginia cbp non tidal network 2006 status update
This presentation is the property of its rightful owner.
Sponsored Links
1 / 8

West Virginia CBP Non-tidal Network: 2006 Status Update PowerPoint PPT Presentation


  • 61 Views
  • Uploaded on
  • Presentation posted in: General

West Virginia CBP Non-tidal Network: 2006 Status Update . West Virginia Department of Environmental Protection West Virginia Department of Agriculture USGS West Virginia Water Science Center. Primary Sites CY 2006. 4 sites Patterson Creek near Headsville (USGS 01604500)

Download Presentation

West Virginia CBP Non-tidal Network: 2006 Status Update

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


West virginia cbp non tidal network 2006 status update

West Virginia CBP Non-tidal Network: 2006 Status Update

West Virginia Department of Environmental Protection

West Virginia Department of Agriculture

USGS West Virginia Water Science Center


Primary sites cy 2006

Primary Sites CY 2006

  • 4 sites

    • Patterson Creek near Headsville (USGS 01604500)

    • South Branch Potomac River near Springfield (USGS 01608500)

    • Cacapon river near Great Cacapon (USGS 01611500)

    • Opequon Creek near Martinsburg (USGS 01616500)

  • All sites sampled using CBP methods


Non tidal primary site analytical parameters

Field parameters

Water temperature

Specific conductance

pH

Dissolved oxygen

Total Nitrogen

Dissolved Nitrate-Nitrite

Dissolved Nitrite

Dissolved Ammonium

Total Phosphorus

Dissolved Orthophosphorus

Total Suspended Solids

Suspended sediment concentration

Sand/Fine split (1 storm sample per quarter)

Non-Tidal Primary Site Analytical Parameters


Sample summaries for cy05 and cy06

Sample Summaries for CY05 and CY06


Equipment history

Equipment History

All equipment on hand at beginning of sampling.


Cbp method implementation history

CBP Method Implementation History

  • All sites have been sampled using CBP methods from the start


2006 challenges

2006 Challenges

  • Funding stability

    • Current WVDEP and USGS-WVWSC funding fairly safe.