1 / 39

LHCb

LHCb. SAC Review Meeting April 17, 2008 Marcel Merk for the LHCb group. Contents: Velo and PileUp Outer Tracker Software. b-b in LHCb. q b. q b. vertices and momenta (mass) reconstruction effective particle identification ( π , К, μ , е, γ ) triggers.

hang
Download Presentation

LHCb

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. LHCb SAC Review Meeting April 17, 2008 Marcel Merk for the LHCbgroup • Contents: • Velo and PileUp • OuterTracker • Software

  2. b-b in LHCb qb qb • vertices and momenta(mass) reconstruction • effective particle identification(π, К, μ, е, γ) • triggers LHCbeventrate: 40 MHz 1 in 160 is a b-bevent

  3. The VErtexLOcator in LHCb • Velo “Specials”: • Detectors move to 8mm from beam • Detectors inside vacuum • Cooling with 2-phase CO2 • Silicon strip detector • Reconstruct primary and secondary vertices • Tracking, use R-Phi geometry • Pile-Up Trigger in L0 

  4. The Outer Tracker in LHCb • Straw tube detector • Momentum determination with TT and magnet • Tracking, use XUVX geometry • 3 OT stations: T1, T2, T3 

  5. View of LHCb in Cavern Muondet Muondet Calo’s Calo’s Magnet Magnet RICH-2 RICH-2 OT RICH-1 RICH-1 OT VELO VELO Installation of major structures is complete

  6. VeLo Project Collab.: Heidelberg, MPI, Liverpool, Glasgow, CERN, Lausanne, Syracuse, VU, Nikhef NIKHEF provides Velo deputy projectleader • Nikhef Contributions: • Mechanics + RF • Vacuum control • Motion control • CO2 cooling • Pile-Up trigger • Commissioning

  7. The Detector Vacuum box (“RF Box”) • Thin, leak-tightcorrugated RF foilbetween sensors and beam 30 mm • Superplastic pressing of 300 mm Al foilwith hot gas • Weldinginto a vacuumtight box

  8. The Detector Vacuum box (“RF-box”) • Dp < 5 mbar at all times! • Leak rate between beam and detector volumes determined to be : 3.2x10-5mbar.l/s @ 1 mbar He • No problem for normal operation, venting and evacuation • Risk: saturation NEG coating during installation • Replacement in 2009 • R&D ongoing for improved production method

  9. Half Velo-detector in assembly lab • Operation of both detector halvestested in assembly lab

  10. Installation (Oct 2007)

  11. CO2 cooling system • 2-phase CO2 cooling system • Low mass • Radiation hard • Redundant / backup system • Only passive components in radiation area • Detector temperature (evaporator) is controlled by pressure in accumulator • Isothermal because of liquid-vapor mixture accumulator cooling plant shielding wall VELO detector 2-phase CO2 loop condenser -25 ‘C restriction -25 ‘C evaporator R507a chiller pump 60 m concentric tube liquid liquid -40 ‘C 2-phase -25 ‘C

  12. Cooling Plant Installation (summer 2007) Controls PLC accumulators Freon Unit CO2 Unit

  13. VeloCooling tests undervacuum T (oC) Performswell 20oC 10oC 0oC -10oC T= -10oC -20oC TRF-foil≈ +9oC Time (hours)

  14. Vacuum • During pumpdown and venting: • p < 5 mbar between beam-vacuum and detector-vacuum

  15. Effect of Cooling on Vacuum 10-2 Reach p < 10 -8: OK P [mbar] pdetector 10-5 T= -10oC TRF-foil≈ +9oC 10-8 pbeam Time

  16. VeloCommissioning • All cables and connectors checked • (20% LV modules missing) • Cooling, Vacuum and Motion being finalized • Hardware interlocks tested • Basic ECS software available, continuously being improved • First R-f station been powered up and read out under bias voltage (80 V): Outlook Velo (May-June): • Power up C-side modules under neon • Operate C-side under vacuum • Repeat for A-side detector half • Then look forward to beam… Noise level OK

  17. Pile-Up detector • 2 dedicated R-stations provide: • 1,2,n vertices for each bunch crossing • luminosity per time interval • All detectors/cables/fibers connected • Datapathestablished (apart from Output Board) • Final test of connections in May • Implementation in Trigger/DAQ to be worked on • Test with Level-0 decision unit planned in June • PVSS work ongoing Analog Tell1 digital tell1 Hybrids kapton cables repeater boards transition boards optical boards VEPROB boards output board L0DU @IP8

  18. Outer Tracker Project Collab.: Dortmund, Heidelberg, Warsaw, Cracow, Bejing, VU, Nikhef NIKHEF provides OT project leader • NikhefContributions: • Production and Installation: • mechanics & electronics • Infrastructure: • frames and support bridge • Quality Assurance • Commissioning • Irradiation Studies

  19. Detector Installation - completed Detector Modules Cooling and Gas LV,HV, ECS/TFC.. • Alignment: • Stations positionedwithnox-y-zrotations to +- 0.5 mm • xyz of modules known to +- 0.5 mm • Reproducibility of open-close ~ 30 mm (except 1 C-frame) • Final x-alignment of C-frames using RASNIK(RASNIK installation completes in April)

  20. OT Electronics . • 80% detector is equipped and installed • 80% -> 90% is ready for installation • 90% -> 100% • Produced and tested: May • Installed: June • 100% -> 110% • Finished after summer C-frame equipped with FE boxes

  21. OT Commissioning • Testingindividualchannelswith a source: 21 bad wires out of 32040 • DAQ: OT has been succesfullyincluded in globalcommissioning runs • Cosmics: Cosmic tracks and showers have been observed… Cosmictrigger in OT

  22. Ageing Phenomenon Ratio Plot: Iafter/Ibefore Carbon deposit on the surface Gas flow • Gain loss “in the neighborhood” • of the irradiation point: Croissant? Bean? Kidney? • Only at moderate intensity • Upstream of gas flow A real surprise – this was not seen in the aging tests performed over the last years with test modules

  23. Ageing: The Cause Put fresh glue (AralditeAW103, HY991) at straw entrance of Aluminum test module Test module: 17 hrs, 2 mCi TraBond 558 hr, 20 mCi Buildfull-scale module with different glue: TraBond 2115

  24. BeneficialTreatments L 1) Flushing: • PreventingTreatments: 1) Long term flushing 2) Heating of the modules 3) Lowering the gas flow 4) Adding O2 to the counting gas  Gain loss (%) ½ year ½ year 2) Heating (Lab):  Flushing Time (weeks) No heating: 20 hrs2mCi 90Sr With heating: 325 hrs2mCi 90Sr

  25. Recovery Treatment  Relative Gain  Irradiation Time (hours) 1st HV training 2nd HV training 3rd HV training • HV training (24 hours, 1900 V, G~106) • Darkcurrent ~10 m A/wire • Wireinspectionpromising: • no carbon depositsdespitelargecurrents Before HV training Trained half After HV training Non-trained half

  26. OuterTracker Outlook OT • Detector installed and aligned • Electronics productionbeingfinalized • Commissioningunderway • Irradiationresistance studies ongoing: • Detectors beingflushed and heated • Investigating HV training procedure • Furthertesting of ``TraBond module´´

  27. Software: Reconstruction, Trigger & Physics NIKHEF provides Trigger deputy project leader (HLT implementation) • NikhefContributions: • Kalman Filter track fitting • Software Alignment: • Framework, Geometry, Kalman filter implementation • HLT implementation • DaVinci and LoKi physics frameworks

  28. Display of LHCb simulatedevent 28

  29. Key measurements – NIKHEF group s b b s s b Looking for effects of new physics in the flavour sector: • CKM Metrology: • Amix: Bs→ Dsp Dms ACP: Bs→ Ds Kg-fs • ACP: Bs→ J/y f fs • Rare Decays: • Br: B(s)→mm • Afb: B0 →K*mm , b →s mm “Box” “Penguin” 4 “teams”: each with 1-2 staff, 1 postdoc, 2-3 students • Well matched to our activities: • VeLo and OT construction • Track reconstruction

  30. Kalman Track Fitting and Alignment z • Reconstruct tracks including multiple scattering. • Tracking in realistic (misaligned) geometry. • Simultaneous detector element alignment fit and trackfit Track c2/dof: Dimuonmassresolution: • Unaligned • O Aligned • Default • Unaligned • O Aligned • Default J/y peak

  31. Example: Bs→ J/y f . signal backg sum • Simultaneouslikelihoodanalysis in time, mass, angular distribution domains time mass cosqf cos qtr ftr

  32. Theses b-physics • Theses on LHCb: • (2001) N. ZaitsevPile-up and Bs→J/yf • (2002) R. v.d. EijkOT and tracking • (2003) R. HierckTracking and Bs→DsK/p • (2004) N. v. BakelVeloand Bs mixing • (2005) S. KlousVeloand Bs →J/y f • (2005) J. v. Tilburg Tracking and Bs→Ds K/p • (2006) B. HommelsTracking and Trigger • (2007) J.NardulliReconstruction of two body B decays in LHCb • Theses on Hera-B: • (2002) M. BruinsmaJ/yin pA • (2002) W. HulsbergenTrack reconstruction • (2003) M. MeviusB cross-section • (2005) H. WahlbergB cross-section • (2006) A. SbrizziB X-section & pentaquark • Thesis on Babar: • (2006) M.BaakCKM angle gamma

  33. The B-Team The “technical” Beauties! (the real backbone) The B-team The mad young geniuses: The Muscles: Those who love it when a plan comes together (the Planners): Nikhef-evaluation

  34. Summary • Velo • Cooling, vacuum, motion control are “ready” • The devil is in the (unforseen) detail • PileUp detectors installed, trigger implementation requires effort • New RF-boxes being produced • Outer Tracker • Detector installed and aligned • Electronics installation under time pressure • Irradiation studies ongoing with high priority • Software • Reconstruction framework ready • Tracking fitting and Alignment algorithms tested • Selection and physics algorithms being developed • Upgrade • Investigating contributions: • Better RF boxes • Velo module replacement • OT operation under high luminosity • 40 MHz readout electronics

  35. The End

  36. The Scientific Team (NIKHEF, VU) • Scientific Staff: (~9 FTE) • Bauer(0,5 OT), v Beuzekom(0.8, Velo),v/d Brand (0.5, Velo),Bulten(0.5,Phys), Hulsbergen(1, Reco), Jans(1, Velo),Ketel(0.5, OT/Velo),Merk(1),Pellegrino(1,OT),Raven (1,Phys), Tuning(1, OT,Phys),de Vries(0.8, Velo),Wiggers(0.7, PileUp/Upgrade) • Post-docs: • Belyaev(Phys),Kazu(Velo/Phys), Palacios (Reco), Serra(Phys), Terrier(OT) , Van Lysebetten(Velo) • Graduate Students: • Amoraal(Reco),Bos(Reco),Jansen(OT),M’charek(OT/Phys), Mous(Velo),Papadelis(Velo),du Pree(Phys), Simioni(OT/Phys),Snippe(Velo), Snoek(Babar),Storaci(OT ),Ybeles-Smit(Phys) • Master Students: • Aaij(Reco),Hooft v. Huysduynen(Phys)

  37. The group • StaffMembers • 12 people (~9 FTE) : 2(30+), 4(40+), 5(50+), 1(60+) • Postdocs • 3 FOM-Nikhef, 1 FOM-PR, 1 NWO-Vidi • TechnicalStaff • 7 (3 OT+4 Velo) MechanicsEngineers, 4 (2 OT+2 Velo) Mechanics Workshop, 8 (3 OT+5 Velo) Electronics, 1 Computing • GraduateStudents • 6 FOM-Nikhef, 1 FOM-BUW, 1 VU, 1 NWO-Vidi • 2 Masterstudents

  38. LHCb experiment in the cavern Offset interaction point (to make best use of existing cavern) Shielding wall(against radiation) Electronics + CPU farm Detectors can be moved away from beam-line for access

  39. b-b in LHCb qb qb Background Supression Flavourtagging Decay time measurement LHCbeventrate: 40 MHz 1 in 160 is a b-bevent • vertices and momenta(mass) reconstruction • effective particle identification(π, К, μ, е, γ) • triggers