slide1
Download
Skip this Video
Download Presentation
E1000304-v3 aLIGO SEI Testing and Commissioning Overall Plan

Loading in 2 Seconds...

play fullscreen
1 / 9

E1000304-v3 aLIGO SEI Testing and Commissioning Overall Plan - PowerPoint PPT Presentation


  • 156 Views
  • Uploaded on

E1000304-v3 aLIGO SEI Testing and Commissioning Overall Plan Components and Sub-Assemblies Testing Electronics Actuators Sensors Vacuum Pods Modules Testing (HEPI, HAM-ISI, BSC-ISI) Phase I: Assembly Validation Phase II: Integration Phase III: Control Commissioning

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' E1000304-v3 aLIGO SEI Testing and Commissioning Overall Plan' - hamal


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
slide1

E1000304-v3 aLIGO SEI Testing and Commissioning Overall Plan

  • Components and Sub-Assemblies Testing
  • Electronics
  • Actuators
  • Sensors
  • Vacuum Pods
  • Modules Testing (HEPI, HAM-ISI, BSC-ISI)
  • Phase I: Assembly Validation
  • Phase II: Integration
  • Phase III: Control Commissioning
  • Chamber Validation
  • Operations
slide2

Components and Sub-Assemblies Testing

  • Electronics: E1100876 - aLIGO SEI Electronics Testing Reports and Procedures
  • T1100453 - Ham 2&3 System Test Plan
    • S1105160 - LHO ISI Test Stand Results
  • Inst. Main Page: E1100786 - aLIGO SEI Instruments, Testing Documents and Tracking Lists
  • Actuators: E1100338 - aLIGO LHO HEPI Actuators Tests Results
  • T1100234 - aLIGO Small Actuator Test Results from Qinetiq
  • T0900564 - aLIGO Large Actuator Test Results from Qinetiq
  • E1100741 - aLIGO BSC-ISI, Actuators Installation Location
  • Sensors: E1000257 - aLIGO HAM-ISI Capacitance Position Sensor Testing
  • E1100231 - aLIGO BSC-ISI Capacitance Position Sensor Testing
  • E1100326 - aLIGO T 240 seismometers for BSC-ISI
  • E1100397 - aLIGO GS-13 testing
  • E1000136 - aLIGO L4C Status Chart
  • Pods: E1100396 - aLIGO Seismometer Pods Neon Leak Test Results
  • Instrumentation: E1100740 - aLIGO BSC-ISI, Seismometers Installation Location
  • E1100770 - In-Vacuum Cabling Status for BSC6, BSC8, HAM2, HAM3
  • E1100822 - aLIGO BSC-ISI, Cables inventory and Installation Location
slide3

Modules Testing Overview

HEPI Modules (33)

HAM-ISI Modules (15)

BSC-ISI Modules (15)

  • Phase I: Assembly Validation
  • Mechanical Assembly
  • No particular testing
  • Install Leads Validate
  • Phase I: Assembly Validation
  • Full Assembly
  • Generic procedure
  • - Validated per test results and report
  • Phase I: Assembly Validation
  • Full Assembly
  • Generic procedure
  • - Validated per test results and report

Instrumentation

Transport to IFO

Transport to IFO

  • Phase II: Integration
  • Install on stand, balance and check functionalities
  • Integration with optical components
  • Unit specific testing, function of optics installation sequence.
  • Cartridge installation
  • Post insertion testing
  • Phase II finishes when we close the chamber.
  • Phase II: Integration
  • Check HEPI is ready to receive an ISI platform (Stack, HAM-ISI or BSC-ISI)
  • Install ISI platform on HEPI
  • Leveling
  • Connect Actuators
  • Generic procedure to check and validate HEPI
  • Phase II finishes when we close the chamber.
  • Phase II: Integration
  • Simplified side chamber testing if no instrumentation change after Phase I.
  • Thorough side chamber testing if instrumentation modified after Phase I.
  • Insertion in the chamber
  • Integration with optical components
  • Unit specific testing, function of optics installation sequence.
  • Phase II finishes when we close the chamber.

Close the chamber

Close the chamber

Close the chamber

  • Phase III: Control Commissioning
  • Generic Step by Step procedure
  • Several levels of performance
  • Acceptance criteria
  • Phase III: Control Commissioning
  • Generic Step by Step procedure
  • Several levels of performance
  • Acceptance criteria
  • Phase III:
  • Control Commissioning
  • Generic Step by Step procedure
  • Acceptance criteria

Meet acceptance criteria.

Meet acceptance criteria.

Meet acceptance criteria.

Operation

Operation

Operation

slide4

Phase I: Assembly Validation

  • HEPI
  • Overview: Mechanical assembly (no Instruments)
  • No particular tests (rigid connection between cross beams and piers). No report.
  • Final check is the leveling.
  • Assembly validation is responsibility of SEI installation lead (Jeremy @ LLO, Hugh @LHO)
  • HAM-ISI
  • Overview: Sub-assembly check, Inventory, Balancing, Check & adjust gaps, Range of motion, Static tests, Linearity tests, Power spectrums, Transfer functions…
  • Main page: E1000305 - aLIGO HAM-ISI Testing and Commissioning Documentation
  • Procedure: E1000309 - aLIGO HAM-ISI, Pre-integration Testing Procedure, Phase I (post-assembly)
  • Report Example: E1000326- aLIGO HAM-ISI, Pre-integration Test Report, Phase I, LLO Unit #2
  • BSC-ISI
  • Overview: Similar to HAM-ISI. Twice many stages.
  • Main page: E1000306 - aLIGO BSC-ISI Testing and Commissioning Documentation
  • Procedure: E1000486 - aLIGO BSC-ISI Testing Procedure, Phase I (Post-assembly)
  • Report Example: E1100294 - aLIGO BSC-ISI, Pre-integration Test Report, Phase I, LHO Unit #1
slide5

Phase II: Integration

  • Everything between the end of the module assembly and closing the chamber.
  • In other words, all the testing related to merging with other modules
  • HEPI
  • Overview: Check that HEPI is ready to receive an ISI or Stack (Stops, Leveling…)
  • Check actuators and sensors (L4C power spectrums, IPS DC values…)
  • Install ISI (or passive stack)
  • Unlock HEPI. Monitor dial indicators, load cells.
  • Level HEPI.
  • Connect actuators.
  • Set IPS gaps.
  • Check the control software (SEI and SUS Watch dogs)
  • Test HEPI (Range of motions, Transfer functions, turn on low performance loops)
  • Leveling, alignments.
  • Report and validation of phase II.
slide6

Phase II: Integration

  • Everything between end of the module assembly and closing the chamber
  • In other words, all tests related to merging with other modules
  • HAM-ISI
  • Phase II starts when the HAM-ISI unit is mounted on a stand in the observatory (LVEA or End Station)
  • Two-case scenario:
  • Assembly already completed and fully tested in the assembly building (i.e. HAM-ISI 8 & 9 @ LHO)
  • Minimum side chamber testing before insertion (DC values of CPS, power spectrums of GS13s…) . Could be done without electronic rack if not available. Testing completed after the chamber is closed.
  • Assembly completed in LVEA or End Station (Install GS13, CPS Shield…)
  • Need Side Chamber Testing before Installation.
  • After installation in the chamber:
  • - Platform is being populated with optics
  • - Testing sequence to be detailed chamber per chamber.
  • Report, Validation
  • Close the chamber: End of Phase II
  • Phase III: Control Commissioning
slide7

Phase II: Integration

  • Everything between end of the module assembly and closing the chamber
  • In other words, all tests related to merging with other modules
  • BSC-ISI
  • Phase II starts when the BSC-ISI unit is mounted on stand in the observatory (LVEA or End Station)
  • Check functionalities (Static Tests, Transfer functions). Compare with measurements after assembly (Phase I)
  • Test control functionalities (Damping, Level 1 control…)
  • Integration with optical components. Testing is chamber specific, function of the optics installation sequence.
  • Installation in the chambers
  • Test basic control functionalities in the chamber (Damping, Level 1 control…)
  • Report, Validation
  • Close the chamber: End of Phase II
  • Phase III: Control Commissioning
slide8

Phase III: Control Commissioning

  • Everything after closing the chamber and before hand-off to operations
  • HEPI: Control strategy developed for iLIGO
  • Detailed step by step procedure based on the BSC-ISI model
  • Being tested at LASTI
  • Procedure being written
  • HAM-ISI: Control strategy developed for eLIGO
  • Step by Step procedure based on the BSC-ISI model
  • Being tested at LASTI
  • Procedure being written
  • BSC-ISI: Control strategy developed on ETF and BSC-ISI prototype
  • Step by Step procedure
  • Tested at LASTI
slide9

Performance Levels

  • HEPI
  • Basic control functionality tests during HEPI checkout (Phase II)
  • Regular performance control loops, Sensor Correction (Phase III)
  • HAM-ISI and BSC-ISI
  • Low Frequency control:
  • High Blend: Low performance ~ 1 Hz Blend frequency Phase II
  • Medium Blend: Medium Performance ~ .3 Hz Phase III
  • Low Blend: High Performance ~.1 Hz Phase III
  • High Frequency Control:
  • Control Level 1 : Low performance ~ 10 Hz Unity gain frequency Phase II
  • Control Level 2 : Medium Performance ~ 20 Hz Unity gain frequency Phase III
  • Control Level 3 : High Performance ~ 30 Hz Unity gain frequency Phase III