E1000304-v3 aLIGO SEI Testing and Commissioning Overall Plan Components and Sub-Assemblies Testing Electronics Actuators Sensors Vacuum Pods Modules Testing (HEPI, HAM-ISI, BSC-ISI) Phase I: Assembly Validation Phase II:Integration Phase III:Control Commissioning

Download Presentation

E1000304-v3 aLIGO SEI Testing and Commissioning Overall Plan

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


E1000304 v3 aligo sei testing and commissioning overall plan

  • E1000304-v3 aLIGO SEI Testing and Commissioning Overall Plan

  • Components and Sub-Assemblies Testing

  • Electronics

  • Actuators

  • Sensors

  • Vacuum Pods

  • Modules Testing (HEPI, HAM-ISI, BSC-ISI)

  • Phase I: Assembly Validation

  • Phase II:Integration

  • Phase III:Control Commissioning

  • Chamber Validation

  • Operations


E1000304 v3 aligo sei testing and commissioning overall plan

  • Components and Sub-Assemblies Testing

  • Electronics:E1100876 - aLIGO SEI Electronics Testing Reports and Procedures

  • T1100453 - Ham 2&3 System Test Plan

    • S1105160 - LHO ISI Test Stand Results

  • Inst. Main Page: E1100786 - aLIGO SEI Instruments, Testing Documents and Tracking Lists

  • Actuators: E1100338 - aLIGO LHO HEPI Actuators Tests Results

  • T1100234 - aLIGO Small Actuator Test Results from Qinetiq

  • T0900564 - aLIGO Large Actuator Test Results from Qinetiq

  • E1100741 - aLIGO BSC-ISI, Actuators Installation Location

  • Sensors: E1000257 - aLIGO HAM-ISI Capacitance Position Sensor Testing

  • E1100231 - aLIGO BSC-ISI Capacitance Position Sensor Testing

  • E1100326 - aLIGO T 240 seismometers for BSC-ISI

  • E1100397 - aLIGO GS-13 testing

  • E1000136 - aLIGO L4C Status Chart

  • Pods:E1100396 - aLIGO Seismometer Pods Neon Leak Test Results

  • Instrumentation: E1100740 - aLIGO BSC-ISI, Seismometers Installation Location

  • E1100770 - In-Vacuum Cabling Status for BSC6, BSC8, HAM2, HAM3

  • E1100822 - aLIGO BSC-ISI, Cables inventory and Installation Location


E1000304 v3 aligo sei testing and commissioning overall plan

Modules Testing Overview

HEPI Modules (33)

HAM-ISI Modules (15)

BSC-ISI Modules (15)

  • Phase I: Assembly Validation

  • Mechanical Assembly

  • No particular testing

  • Install Leads Validate

  • Phase I: Assembly Validation

  • Full Assembly

  • Generic procedure

  • - Validated per test results and report

  • Phase I: Assembly Validation

  • Full Assembly

  • Generic procedure

  • - Validated per test results and report

Instrumentation

Transport to IFO

Transport to IFO

  • Phase II: Integration

  • Install on stand, balance and check functionalities

  • Integration with optical components

  • Unit specific testing, function of optics installation sequence.

  • Cartridge installation

  • Post insertion testing

  • Phase II finishes when we close the chamber.

  • Phase II: Integration

  • Check HEPI is ready to receive an ISI platform (Stack, HAM-ISI or BSC-ISI)

  • Install ISI platform on HEPI

  • Leveling

  • Connect Actuators

  • Generic procedure to check and validate HEPI

  • Phase II finishes when we close the chamber.

  • Phase II: Integration

  • Simplified side chamber testing if no instrumentation change after Phase I.

  • Thorough side chamber testing if instrumentation modified after Phase I.

  • Insertion in the chamber

  • Integration with optical components

  • Unit specific testing, function of optics installation sequence.

  • Phase II finishes when we close the chamber.

Close the chamber

Close the chamber

Close the chamber

  • Phase III: Control Commissioning

  • Generic Step by Step procedure

  • Several levels of performance

  • Acceptance criteria

  • Phase III: Control Commissioning

  • Generic Step by Step procedure

  • Several levels of performance

  • Acceptance criteria

  • Phase III:

  • Control Commissioning

  • Generic Step by Step procedure

  • Acceptance criteria

Meet acceptance criteria.

Meet acceptance criteria.

Meet acceptance criteria.

Operation

Operation

Operation


E1000304 v3 aligo sei testing and commissioning overall plan

  • Phase I: Assembly Validation

  • HEPI

  • Overview: Mechanical assembly (no Instruments)

  • No particular tests (rigid connection between cross beams and piers). No report.

  • Final check is the leveling.

  • Assembly validation is responsibility of SEI installation lead (Jeremy @ LLO, Hugh @LHO)

  • HAM-ISI

  • Overview: Sub-assembly check, Inventory, Balancing, Check & adjust gaps, Range of motion, Static tests, Linearity tests, Power spectrums, Transfer functions…

  • Main page: E1000305 - aLIGO HAM-ISI Testing and Commissioning Documentation

  • Procedure: E1000309 - aLIGO HAM-ISI, Pre-integration Testing Procedure, Phase I (post-assembly)

  • Report Example: E1000326- aLIGO HAM-ISI, Pre-integration Test Report, Phase I, LLO Unit #2

  • BSC-ISI

  • Overview:Similar to HAM-ISI. Twice many stages.

  • Main page:E1000306 - aLIGO BSC-ISI Testing and Commissioning Documentation

  • Procedure: E1000486 - aLIGO BSC-ISI Testing Procedure, Phase I (Post-assembly)

  • Report Example:E1100294 - aLIGO BSC-ISI, Pre-integration Test Report, Phase I, LHO Unit #1


E1000304 v3 aligo sei testing and commissioning overall plan

  • Phase II: Integration

  • Everything between the end of the module assembly and closing the chamber.

  • In other words, all the testing related to merging with other modules

  • HEPI

  • Overview: Check that HEPI is ready to receive an ISI or Stack (Stops, Leveling…)

  • Check actuators and sensors (L4C power spectrums, IPS DC values…)

  • Install ISI (or passive stack)

  • Unlock HEPI. Monitor dial indicators, load cells.

  • Level HEPI.

  • Connect actuators.

  • Set IPS gaps.

  • Check the control software (SEI and SUS Watch dogs)

  • Test HEPI (Range of motions, Transfer functions, turn on low performance loops)

  • Leveling, alignments.

  • Report and validation of phase II.


E1000304 v3 aligo sei testing and commissioning overall plan

  • Phase II: Integration

  • Everything between end of the module assembly and closing the chamber

  • In other words, all tests related to merging with other modules

  • HAM-ISI

  • Phase II starts when the HAM-ISI unit is mounted on a stand in the observatory (LVEA or End Station)

  • Two-case scenario:

  • Assembly already completed and fully tested in the assembly building (i.e. HAM-ISI 8 & 9 @ LHO)

  • Minimum side chamber testing before insertion (DC values of CPS, power spectrums of GS13s…) . Could be done without electronic rack if not available. Testing completed after the chamber is closed.

  • Assembly completed in LVEA or End Station (Install GS13, CPS Shield…)

  • Need Side Chamber Testing before Installation.

  • After installation in the chamber:

  • - Platform is being populated with optics

  • - Testing sequence to be detailed chamber per chamber.

  • Report, Validation

  • Close the chamber: End of Phase II

  • Phase III: Control Commissioning


E1000304 v3 aligo sei testing and commissioning overall plan

  • Phase II: Integration

  • Everything between end of the module assembly and closing the chamber

  • In other words, all tests related to merging with other modules

  • BSC-ISI

  • Phase II starts when the BSC-ISI unit is mounted on stand in the observatory (LVEA or End Station)

  • Check functionalities (Static Tests, Transfer functions). Compare with measurements after assembly (Phase I)

  • Test control functionalities (Damping, Level 1 control…)

  • Integration with optical components. Testing is chamber specific, function of the optics installation sequence.

  • Installation in the chambers

  • Test basic control functionalities in the chamber (Damping, Level 1 control…)

  • Report, Validation

  • Close the chamber: End of Phase II

  • Phase III: Control Commissioning


E1000304 v3 aligo sei testing and commissioning overall plan

  • Phase III: Control Commissioning

  • Everything after closing the chamber and before hand-off to operations

  • HEPI: Control strategy developed for iLIGO

  • Detailed step by step procedure based on the BSC-ISI model

  • Being tested at LASTI

  • Procedure being written

  • HAM-ISI:Control strategy developed for eLIGO

  • Step by Step procedure based on the BSC-ISI model

  • Being tested at LASTI

  • Procedure being written

  • BSC-ISI: Control strategy developed on ETF and BSC-ISI prototype

  • Step by Step procedure

  • Tested at LASTI


E1000304 v3 aligo sei testing and commissioning overall plan

  • Performance Levels

  • HEPI

  • Basic control functionality tests during HEPI checkout (Phase II)

  • Regular performance control loops, Sensor Correction (Phase III)

  • HAM-ISI and BSC-ISI

  • Low Frequency control:

  • High Blend: Low performance ~ 1 Hz Blend frequency Phase II

  • Medium Blend: Medium Performance ~ .3 Hz Phase III

  • Low Blend: High Performance~.1 Hz Phase III

  • High Frequency Control:

  • Control Level 1 : Low performance ~ 10 Hz Unity gain frequency Phase II

  • Control Level 2 : Medium Performance ~ 20 Hz Unity gain frequency Phase III

  • Control Level 3 : High Performance~ 30 Hz Unity gain frequency Phase III