An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Current Background Situation in BaBar “Always a concern, often an issue but never a showstopper” • The background sources: (Synchrotron Radiation), Beam-Gas, Radiative Bhabbas , Beam-Beam effects, Radiation bursts, Injection, (Touscheck) • The background effects: integrated dose, instantaneous damage, operational issues, data quality • The background remediation strategy Babar protection system, budget policy, forward looking to bottlenecks using projection and simulations • Today’s questions • Trickle injection • Injection quality • Preparation for tomorrow • Conclusion Guy Wormser, Super B-Factory Workshop, Jan 04

  2. The background sources • Synchrotron radiation : very well masked, has never been a problem for BABAR • Beam-Gas : BABAR sees debris from electromagnetic showers of scattered electrons and photons. • Two subcomponents : Brems and Compton scattering • Well described by simulation • Efficient collimator scheme Guy Wormser, Super B-Factory Workshop, Jan 04

  3. The background sources (2) • Radiative Bhabbas • Showers debris from off-energy electrons or positrons after Bhabbas scattering swept away by magnetic elements in interaction regions • Beam-beam effects • « Trapped/Dust events » (HER specific) • Touschek effects : not observed yet Guy Wormser, Super B-Factory Workshop, Jan 04

  4. Predictability score • Predictables sources • Synchrotron • Beam gas • Bremstralhung • Compton • Touschek • In principle predictable source • Radiatvie Bhabbas • Unreliably predictable sources • Beam-beam • Electron cloud effects • Injection doses • Unpredictable sources • Radiation bursts, “dust events” Guy Wormser, Super B-Factory Workshop, Jan 04

  5. Agressive PEP-II plans Can BABAR keep up? Present headroom limited! Historically, the same challenge has always been met! Guy Wormser, Super B-Factory Workshop, Jan 04

  6. Background parametrization based on February 2002 data The observed background is roughly twice larger than the sum of the single beam contributions Guy Wormser, Super B-Factory Workshop, Jan 04

  7. M. Kelsey DCH background history Guy Wormser, Super B-Factory Workshop, Jan 04

  8. Serious problem in DCH readout if nothing is done Guy Wormser, Super B-Factory Workshop, Jan 04

  9. Remediation and Forward looking of bottlenecks • Example of DIRC TDC • In 1999, we predicted that the single rate PMT in the DIRC would in 2002-2003 exceed the 200 kHz limit • A lot of effort to improve the shiedling • Launch design of a new TDC, implemented in summer 2002 with a 2 MHz capability. • The 200 kHz limit was indeed reached in fall 2002 • Next on line: DCH read out! Guy Wormser, Super B-Factory Workshop, Jan 04

  10. DIRC main source of background: Radiative Bhabhas striking Q4 magnet inboard flange • Source discovered empirically with a Geiger counter. • Shielding erected step-by-step slowly building empirically a proof that things are improving. • A final shield erected in 2001, and the whole job completed in 2002. • Carsten proved later, with a Turtle program, that a major source of DIRC background is the radiative Bhabhas striking Q4 inboard flange, which is too small. Guy Wormser, Super B-Factory Workshop, Jan 04

  11. IFR issues • IFR is the only BABAR subdetector where the existing hardware capabilities are presently significantly degraded because of background: Layers 13, 15,16 turned off in the forward endcap (loss of factor ~2 in the mu/pi rejection in that region) IFR background comes losses near collimator BSC3042 which is very sensitive to beam-beam effects and thus very useful to the rest of BABAR… Must provide a shielding wall (summer 2004) Guy Wormser, Super B-Factory Workshop, Jan 04

  12. IFR issues Guy Wormser, Super B-Factory Workshop, Jan 04

  13. IFR and beam loss monitor Guy Wormser, Super B-Factory Workshop, Jan 04

  14. SVT Background from HER HER sensitive SVT module (Does not have threshold shift problem): (BW:MID) Background almost doubled after move to half-integer Again it has come down a bit during run-4 Note peak occupancy is 150% higher than average occupancy! Moves toward half-integer For occupancies in all SVT modules, see: http://www.slac.stanford.edu/~babarsvt/SectionOccupancies.ps Guy Wormser, Super B-Factory Workshop, Jan 04

  15. SVT rates in 2003 compared to 2002 extrapolation Guy Wormser, Super B-Factory Workshop, Jan 04

  16. Single beam and lumi sensitivity Guy Wormser, Super B-Factory Workshop, Jan 04

  17. MID Plane Doses Stable beam contribution of FW:MID and BW:MID is overestimated Damage in SVT modules starts Run 3+4 dose is 40-60% of Run1+2 Luminosity is 55% of Run1+2 Guy Wormser, Super B-Factory Workshop, Jan 04

  18. TOP Doses Dominated by injection dose (up to 90%) Getting HER to “trickle quality” would provide large gains Guy Wormser, Super B-Factory Workshop, Jan 04

  19. Summary of Detector sensivities and main issues • SVT : Integrated Dose, Occupancy, single beam and beam-beam, FE electronics strange effects • DCH : Readout capabilities, radiative Bhabbas • DIRC : No problem for now, radaitive Bhabbas • EMC Integrated dose in Endcap for the long term, leakage current in Diodes (neutrons?), occupancy, • IFR Single rate for external layers, beam-beam effects • SVTRAD : integrated dose, will need to be replaced soon • Integrated dose: SVT 2Mrad in the most exposed regions, EMC 1 krad in the most exposed regions • Rather similar to what BELLE received ? Guy Wormser, Super B-Factory Workshop, Jan 04

  20. MID Dose Rates until 2009 Use Seeman model for beam currents to predict dose rates: Dose rates do not looking forbiddingly high Rates peak at roughly the current soft abort limits - DQ should still be reasonable Guy Wormser, Super B-Factory Workshop, Jan 04

  21. Midplane Doses until 2009 • Module exchange in 2005 looks well timed with 4 Mrad budget • One rotation in 2007 should be able to keep MID modules installed in 2005 below 5 Mrad A rotation will move the high dose in FE:MID to other module Guy Wormser, Super B-Factory Workshop, Jan 04

  22. BABAR scorecard July 2004 Guy Wormser, Super B-Factory Workshop, Jan 04

  23. BABAR scorecard July 2006 Guy Wormser, Super B-Factory Workshop, Jan 04

  24. Dose in calorimeter Guy Wormser, Super B-Factory Workshop, Jan 04

  25. BABAR scorecard 2009 Guy Wormser, Super B-Factory Workshop, Jan 04

  26. Data quality issues in SVT Guy Wormser, Super B-Factory Workshop, Jan 04

  27. Resolution degration with occupancy Guy Wormser, Super B-Factory Workshop, Jan 04

  28. Example in Guy Wormser, Super B-Factory Workshop, Jan 04

  29. HER Injection Problems Guy Wormser, Super B-Factory Workshop, Jan 04

  30. Characterization of injection aborts/inhibits BP / LP + ODF Guy Wormser, Super B-Factory Workshop, Jan 04

  31. B. Petersen G. Wormser A variety of fast radiation spikes (stored beams) Guy Wormser, Super B-Factory Workshop, Jan 04

  32. B. Petersen G. Wormser A variety of fast radiation spikes (stored beams) Guy Wormser, Super B-Factory Workshop, Jan 04

  33. Run 4 Trip Summary Average of 4 trips/day – Run 3 average was 3 trips/day A couple of aborts are due to broken thermistor Only one other abort looked suspicious Last two weeks average is down to almost 1 trip/day Guy Wormser, Super B-Factory Workshop, Jan 04

  34. Some exemple of « Dust events » Guy Wormser, Super B-Factory Workshop, Jan 04

  35. Trickle solved top of fill beam_beam effects Guy Wormser, Super B-Factory Workshop, Jan 04

  36. Revided simulation efforts • Locations of the sources of Lumi terms and possible shielding • Improvment of collimators locations • Validation of new IR design Guy Wormser, Super B-Factory Workshop, Jan 04

  37. Evidence for neutron radiation? • Diode leakage current in EMC read-out • IFR background ? • J. Vavra developped a neutron detector very insensitive to photons that will be placed shortly along the beam pipe Guy Wormser, Super B-Factory Workshop, Jan 04

  38. Conclusions for short term issues • We have to look far ahead: Minimum 3 years • Look for worst case scenarios! • Look for end-product effects! • BABAR issues • Immediate concerns: SVT ATOM chip, IFRForward endcap • Next on-line: DCH DAQ • Longer term issues: SVT and EMC in 2008 • Changes in background issues • Beam-beam tails • injections • trapped events Guy Wormser, Super B-Factory Workshop, Jan 04

  39. Background issues for a Super B factory • Detector has to stay always on! • Detector Protection system : can we get rid of it? If not, it has to stand 100 MRad • Avoid all detector susceptible to instantaneous damage • Once proper rad hard technology has been chosen, occupancy will become the next major issue : ultra fast and hyper-segmented Guy Wormser, Super B-Factory Workshop, Jan 04

  40. Guy Wormser, Super B-Factory Workshop, Jan 04

  41. BABAR scorecard today x(trickle) X: visible effect with non-zero impact - : visible effect with no impact ? : yet unknown fixed: det upgrade to fix a significant issue Guy Wormser, Super B-Factory Workshop, Jan 04