Wp1 a common strategy
This presentation is the property of its rightful owner.
Sponsored Links
1 / 30

WP1: A Common Strategy PowerPoint PPT Presentation


  • 59 Views
  • Uploaded on
  • Presentation posted in: General

WP1: A Common Strategy. Pascal Morin (INSU) Ingrid Puillat (Ifremer) Dominique Durand (NIVA). WP1 Context Jerico Vision. Prepare for the future European Network of operational coastal observatories (OCO) through: Better pan-European coordination

Download Presentation

WP1: A Common Strategy

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Wp1 a common strategy

WP1: A Common Strategy

Pascal Morin (INSU)

Ingrid Puillat (Ifremer)

Dominique Durand (NIVA)

PARIS – Maison de la recherche - 24 & 25 May 2011


Wp1 context jerico vision

WP1 ContextJerico Vision

  • Prepare for the future European Network of operational coastal observatories (OCO) through:

    • Better pan-European coordination

    • Increased harmonisation of existing infrastructures

    • Exchange of know-how and definition of Best Practices

    • Promotion European OCO through TNA

    • Agreed deployment strategy

PARIS – Maison de la recherche - 24 & 25 May 2011


1 wp1 context jerico main focus

1. WP1 ContextJERICO main focus

  • 1-To set up a European Research Infrastructure for coastal observation as needed in research and Operational Oceanography activities

  • 2-To define the criteria for a Label JERICO (set of parameters, frequency, sampling scheme, data quality, data delivery…)

  • 3- To sustain networks which are in compliance with Label criteria to secure long term series of data.

  • 4-To provide opportunities to access to plate-forms for testing/demonstrating experiments and data for assimilation experiments

  • 5- Better use of R/V, fishing boats & ships of opportunity

  • 6- Develop a partnership strategy to operate the pool of Gliders in Europe (technical expertise for both vehicle and sensors, operational strategy).

PARIS – Maison de la recherche - 24 & 25 May 2011


Wp1 a common strategy

1. WP1 ContextRole of WP1

PARIS – Maison de la recherche - 24 & 25 May 2011


2 wp1 objectives integrating

2. WP1 objectivesIntegrating

  • Define the rules for a better coordination at European level

  • Identify gaps in existing OCOs

  • Launching a European strategic view on OCO

  • Creating a JERICO label

  • Organizing a Forum for Coastal technology

  • Promote open access to JERICO network

  • Provide cross-regional integration and demonstration

  • Suggest a roadmap for a deployment strategy

  • Coordinating networking actions for optimal integration of knowledge and consensus

PARIS – Maison de la recherche - 24 & 25 May 2011


Wp1 a common strategy

3. Tasks of JERICO WP1

T1.1 : Set up the scene and implementation plan

  • Roadmap for the project (WP by WP)

  • Coordination of WP results

  • Share the experience with other projects

  • Agreeing on definitions and rationale sustaining analysis of existing observatories

    • Glossary, priority list of measured variables

  • Cooperation with Australian Integrated Marine Observing System (IMOS)…

  • Terms of Reference of the Forum for Coastal Technology

  • Analysis of existing facilities

  • User committee (EEA, EuroGOOS, Marine Board, …)

PARIS – Maison de la recherche - 24 & 25 May 2011


Wp1 a common strategy

3. Tasks of JERICO WP1

T1.1 : Set up the scene and implementation plan

  • Task leader: INSU

  • Support from: NIVA, Ifremer

  • Contributors: all

  • Deliverables:

    • Report on rationale and definition for a common strategy (M9)

    • ToR for the FCT (M9)

    • Contribution to final report (M48)

PARIS – Maison de la recherche - 24 & 25 May 2011


Wp1 a common strategy

3. Tasks of JERICO WP1

T1.1 : Set up the scene and implementation plan

  • Main deliverable:

    • An e-forum where a glossary will be presented and discussed.

    • This glossary documents :

      • outputs of previous projects

      • definitions and methods of, for instance: priority variables to measure, standards on quality assurance (methods), …

      • guidelines and technical guides and manuals

      • setting the terms of reference of the FCT

      • analysing the present successes and gaps of the existing facilities:

        • Relevance of the data

        • Quality of the data

        • Qualification processes of sensors

        • Benefit optimization

    • This is an input for other WPs work

PARIS – Maison de la recherche - 24 & 25 May 2011


Wp1 a common strategy

3. Tasks of JERICO WP1

T1.2 : JERICO Label

  • Set of criteria to be applied in order to make choices for the specifications of coastal observatories.

  • Mandatory aspects, from point of view expressed and experienced in JERICO

    • Consensus to be reached through WP3 and 4

  • Recommended solutions or options

  • Compliance with SeaDataNet, MyOcean and EMODNet

PARIS – Maison de la recherche - 24 & 25 May 2011


Wp1 a common strategy

3. Tasks of JERICO WP1

T1.2 : JERICO Label

  • Step 1: defining what is the Jerico label:

    • to define topics relevant for the label (topic criteria)

    • review of the existing label document (ESONET)

    • gaps to complete

  • Step 2: definition of criteria to be applied to JERICO observing systems

PARIS – Maison de la recherche - 24 & 25 May 2011


Wp1 a common strategy

3. Tasks of JERICO WP1

T1.2 : JERICO Label

  • Task leader: HCMR

  • Contributors: Puertos de Estado, HZG, CEFAS

  • Deliverables

    • JERICO label definition (M18)

    • Contribution to final report (M48)

PARIS – Maison de la recherche - 24 & 25 May 2011


Wp1 a common strategy

3. Tasks of JERICO WP1

T1.3 : Forum for Coastal technology

  • To implement a forum to encourage communication and collaboration between stakeholders and private companies

  • To ensure technologies developed by industry meet the requirements of long term operational systems

  • To animate a scientific secretariat to organise meetings, WGs and disseminating the outcomes = Subcontracting to Pole Mer

PARIS – Maison de la recherche - 24 & 25 May 2011


Wp1 a common strategy

3. Tasks of JERICO WP1

T1.3 : Forum for Coastal technology

  • Task leader: IM

  • Contributors: Ifremer

  • Milestones/Deliverables

    • ToR (M9)

    • First FCT (M18) / report (M24)

    • 2nd FCT (M30) / report (M36)

    • Contribution to final report (M48)

PARIS – Maison de la recherche - 24 & 25 May 2011


Wp1 a common strategy

3. Tasks of JERICO WP1

T1.4 : Definition strategy and interfaces with biodiversity observatories

  • to prepare an implementation strategy for the optimisation of long term observations to monitor state and evolution of marine biodiversity

  • Linked with Jerico label

  • to investigate the potential of existing observatories of biodiversity to define interfaces with a future network

PARIS – Maison de la recherche - 24 & 25 May 2011


Wp1 a common strategy

3. Tasks of JERICO WP1

T1.4 : Definition strategy and interfaces with biodiversity observatories

  • Task leader: NIOZ

  • Contributors: possibly all

  • Milestones/Deliverables

    • Proposed strategy for biodiversity (M36)

    • Contribution to final report (M48)

PARIS – Maison de la recherche - 24 & 25 May 2011


Wp1 a common strategy

3. Tasks of JERICO WP1

T1.5: Roadmap for the future

  • Synthetize outcomes from all other WPs

  • Translate outcomes from FCT into recommendations

  • Establish a GIS map for the future European network of OCO

    • Based upon the gap analysis (WP1 &2), network optimization (WP9) and new observing potentials (WP10)

  • Contribute with recommendations to the ERAnet SEAS-ERA

  • Disseminate recommendations to targeted stakeholders through an open seminar

PARIS – Maison de la recherche - 24 & 25 May 2011


Wp1 a common strategy

3. Tasks of JERICO WP1

T1.5: Roadmap for the future

  • Task leader: INSU

  • Contributors: all

  • Milestones/Deliverables

    • Roadmap for the next decade (nominal M48)

PARIS – Maison de la recherche - 24 & 25 May 2011


Wp1 a common strategy

3. Tasks of JERICO WP1

T1.6 : User modality Access for the Trans National Activities

Management of the Trans-National Access to selected installations of the JERICO network.

SubTask 1.6.1: Preparation of the call – peer review

- Setting the “Selection Panel”

- Drafting the call

- Drafting the guidelines for evaluation

- Meetings of the Panel

SubTask 1.6.2 : Information and reporting activities

- Drafting the specifications of the web site (call section),

managing its construction and implementation.

- Managing the calls (call opening, proposals reception and

transmission to the targeted providers for pre-screening

technical review).

- Access reporting and information.

PARIS – Maison de la recherche - 24 & 25 May 2011


Wp1 a common strategy

3. Tasks of JERICO WP1

T1.6: User modality Access for the Trans National Activities

  • Task leader: CNR

  • Contributors: all TNA-WP8 partners

  • Milestones/Deliverables

    • 1st call for TNA (M8)

    • 2nd call (M20)

    • 1st report for access activity (M24)

    • 2nd report for access activity (M42)

PARIS – Maison de la recherche - 24 & 25 May 2011


End of part 1

End of part 1

WP 1

PARIS – Maison de la recherche - 24 & 25 May 2011


4 ultimate goal

4. Ultimate goal

  • Roadmap for future implementation and deployment of OCOs in Europe

  • Through

    • Harmonisation of strategies, technologies and methodologies

    • Identification of gaps and plan for filling in gaps

    • Accounting for new environmental, research and service requirements

    • Accounting for new technologies

PARIS – Maison de la recherche - 24 & 25 May 2011


4 challenge

4. Challenge

  • from fragmented knowledge, know-how and strategies to

    A Common Strategy

PARIS – Maison de la recherche - 24 & 25 May 2011


4 cross cutting coordination

4. Cross-cutting coordination

NA

Existing technologies

Gaps

3.1.4 / 3.3.4

TNA

TOP

Proof-of-concept

JRA

New technologies

PARIS – Maison de la recherche - 24 & 25 May 2011


4 coordination of nas

4. Coordination of NAs

Forum Coastal Tech.

WP2: Overview

of Regional

components

WP3: Overview

of Technologies

& Harmonization

WP4: Operation

& Maintenance

Harmonization

Gaps

Best practices

JERICO LABEL

PARIS – Maison de la recherche - 24 & 25 May 2011


4 preliminary roadmap for wp2

4. Preliminary Roadmap for WP2

  • Contribution to definition of a common strategy

    • Overview on OCO per ROOS

    • Identification of gaps (parameter, sampling)

    • Inter-comparison of ROOS strategies

      • What is there in common? / what should be harmonized?

    • Definition of trans-regional products

  • Inputs to WP3 and 4

    • Overview of observing approaches at ROOSes

      • Available parameters/variables

      • Sampling in space and time

      • Overview on plateform

      • Overview of technologies

      • Overview of methods

PARIS – Maison de la recherche - 24 & 25 May 2011


4 preliminary roadmap for wp3

4. Preliminary Roadmap for WP3

  • Contribution to definition of a common strategy

    • Discrepancies between OCOs

      • Technologies

      • Practices

    • Agreement on a set of parameters

    • Recommendations for ad-hoc technologies

    • Approach for harmonization

    • Best practices on operating/managing platforms

  • Inputs to WP4

    • Aspects of ferrybox, gliders and fixed platform to be addressed within WP4.

    • Technologies that require a special focus when it relates to operation and maintenance

PARIS – Maison de la recherche - 24 & 25 May 2011


4 preliminary roadmap for wp4

4. Preliminary Roadmap for WP4

  • Contribution to definition of a common strategy

    • Harmonised procedures for operation and maintenance

    • Consensual (best) practices on

      • Calibration

      • Biofouling prevention

      • End-to-end quality assurance

  • Inputs to WP3

    • Feedback on operation/maintenance issues that can affect harmonization and best practices of procedures within and between platforms

PARIS – Maison de la recherche - 24 & 25 May 2011


Wp1 a common strategy

Questionnaire

WP2, 3, 4

Workshops

WP3, 4

WP4

Deliverables

WP3

WP2

PARIS – Maison de la recherche - 24 & 25 May 2011


Workshops

Workshops

  • Crucial tool for reaching consensus and delivering inputs to the common strategy

  • Joint workshops WP3 – WP4

  • Contribution from WP2

  • Joint questionnaire from WP2, 3, 4

  • Timeline for organisation

  • Approach for optimal gathering of information

PARIS – Maison de la recherche - 24 & 25 May 2011


That s all folks

That’s All Folks !

PARIS – Maison de la recherche - 24 & 25 May 2011


  • Login