An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. THYSSENKRUPP ELEVATOR ELEVATOR MODERNIZATION PROJECT 450 N STREET

  2. THYSSENKRUPP ELEVATOR • 3RD LARGEST ELEVATOR COMPANY IN WORLD - LARGEST IN NORTH AMERICA • DIVISION OF THYSSENKRUPP AG – FORTUNE “GLOBAL 100” COMPANY • LARGEST ELEVATOR SERVICE COMPANY IN SACRAMENTO • SOLD MORE MODERNIZATION IN SAC THAN ANY OTHER COMPANY

  3. State Capitol Office Building 8 (714 P St.) 3) Office Building 10 (721 Capitol Mall) 4) Legislative Office Building (1020 N St.) 5) Resources Building (1416 9th St.) 6) Office Building 9 (744 P St. - Finishing now) 7) EDD Building (722/800 C.M. - In progress now) MODERNIZATION PROJECTS – STATE BUILDINGS DOWNTOWN

  4. Resources Building

  5. NEW CONTROL SYSTEM

  6. NEW CONTROL SYSTEM

  7. New, state-of-the-art, microprocessor controls. Generators will be removed and new AC hoist motors installed New digital tape landing system Rope-Gripper (ascending safety device), per 2004 Code All new hoistway and machine room wiring New, closed loop door operators New seismic switch New car and hall stations to comply with ADA and current F.S. Code New hall lanterns, hall position indicators, and lobby panel New electronic door edges Load weighing Voice annunciators SCOPE OF WORK

  8. New controls/system good for the next thirty (30) years Leveling accuracy exact – under all load conditions (digital feedback) Less wait time for elevators (dispatching & positioning) Power savings (elimination of generator) Enhanced safety (digital feedback and back-up safety circuitry) Less equipment downtime for repairs (all new equipment) Updated to current ADA and Fire Service Code Added door safety (electronic door edge) More efficient trips (load weighing) Modern look and feel (new fixtures and voice floor announcements) BENEFITS OF MODERNIZATION

  9. START = EARLY APRIL, 2010 One low rise and one high rise at same time Once complete: inspect, turn on, begin next pair Approximately 12 - 14 weeks per pair Overall Project Duration = 18 – 24 months SCHEDULE

  10. QUESTIONS?