CHARM Update. J. Mekki. CHARM Update. Goal of the facility : Complex mixed particle field present within the accelerators Simultaneous effect (TID, DD, SEE )

Download Presentation

CHARM Update

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Charm update

CHARM Update

J. Mekki


Charm update1

CHARM Update

  • Goal of the facility:

    • Complexmixed particlefieldpresentwithin the accelerators

    • Simultaneouseffect (TID, DD, SEE)

    • In the framework of the R2E project the testing of electronicequipment in a radiation fieldsimilar to CERN acceleratorsis crucial → Assure mid-long termoperationrequirements

    • Facility not onlyuseful for CERN accelerators but also for :

      • Groundlevel and atmosphericenvironment(neutron energyspectra)

      • Spaceenvironment(representative for the inner proton radiation belt)

    • Size of the test area (severaltens of m3):

      • Large objectscanbeirradiated

      • Evenobjects in operationwith services connected (power, cooling…)

      • Can also host satelittes, part of cars or planes.


Charm update

East Area Facilities

24 GeV/c proton beam


Charm update

East Area Facilities

24 GeV/c proton beam

IRRAD proton facility

PH/DT

24 GeV/c proton beam

LHC experiments


Charm update

East Area Facilities

24 GeV/c proton beam

CHARM

R2E Project


Charm update

East Area Facilities

24 GeV/c proton beam

Technical local

Connection to the radiation area


Charm update

East Area Facilities

24 GeV/c proton beam

Control room

Dry run test


Charm update

East Area Facilities

24 GeV/c proton beam

Platform for the Dry Run test of

heavy equipment e. g. UPS, Power converters


Charm update

CHARM

24 GeV/c proton beam


Charm update

Montrac conveyer

  • Implementation

    • Hypertack

    • 6 NE48 (RadTOL)


Charm update

News

  • Schedule:

    • We are on the way → around 2 monthsbeforegetting first beam → Everypieces/blocks/systems of CHARM are building/mountingeachday.

    • Commissioningshouldstart in August.

    • OperationshouldstartduringSeptember up to the 8th of December.

  • In order to prepare the CHARM operationschedule, the beam time requestform has been sent to the RadWGlist and externalusers.

  • For the moment someusers (alsoexternal) showedinterest of suchfacility (e. g. BNL, LHC experiments etc…)

  • FromRadWG, I have not yetreceivedanyfilledform.

  • Anycommentsregarding the beam time requestform ?

  • Information:

    • The new websiteisavailableherehttp://charm.web.cern.ch/CHARM/

    • You canalsofind information about the availablecables on-site. http://charm.web.cern.ch/CHARM/Cables.php


Charm update

Thank you for your attention


Charm update

Varying Radiation Field

Beam Positiontarget in:HEH: >1011cm-2h-1TID: >100 Gyh-1

target out:HEH: >1013cm-2h-1TID: >10 kGyh-1

Beam Pos.

Longitudinal

Lateral Positions

HEH: 108cm-2h-1 – 1011cm-2h-1TID: 0.1Gyh-1 – 100Gyh-1

(gradients to be considered)

Full racks, crates, set of cards, componentsHEH: 107cm-2h-1 – 1010cm-2h-1, TID: 10mGyh-1 – 10Gyh-1