1 / 28

BP Oil Spill Response

BP Oil Spill Response. US EPA Roles and Activities. Situation Overview: Updated August 3, 2010. On April 22, Deepwater Horizon rig capsizes and sinks The well was shut-in on July 15 at 2:24 p.m. No oil is flowing into the water

gusty
Download Presentation

BP Oil Spill Response

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. BP Oil Spill Response US EPA Roles and Activities

  2. Situation Overview:Updated August 3, 2010 • On April 22, Deepwater Horizon rig capsizes and sinks • The well was shut-in on July 15 at 2:24 p.m. No oil is flowing into the water • Pressure monitoring, visual surveillance of the seafloor, and monitoring of sonar, acoustic, and seismic data continues • About 640 miles of shoreline impacted

  3. DHS Declared SONS • On April 29, Secretary Napolitano declares the incident a Spill of National Significance (SONS) • This designation allows the U.S. Coast Guard (USCG) to leverage the full resources available to the federal government • USCG lead federal agency • EPA assisting USCG with evaluation of environmental impacts • EPA Regions 4 and 6 are integrated into single Unified Area Command structure • Area Command Post (New Orleans) • Incident Command Posts (Houma, LA and Mobile, AL)

  4. Response to Date: Updated August 3 • Total response vessels: 5,054 • Total boom deployed: over 11.7 million feet (3.56M regular plus 8.16M sorbent boom) • Oily water recovered: over 826,517 barrels • Dispersant used: about 1,072,514 gallons on the surface and 771,272 gallons subsurface • Overall personnel responding: around 31,418

  5. Dispersant Application Dispersant use has ceased since the well was capped on July 15 – except for 200 gallons used on July 19 EPA issued Phase 2 dispersant toxicity testing results on August 2, 2010 – mixtures of oil and dispersants USCG and EPA directives have been issued to BP EPA and USCG requiring BP to follow an adaptive monitoring plan for subsurface application Emphasis on reducing dispersant use Surface and subsurface application is by USCG Federal on-Scene Coordinator (FOSC) and EPA approval Requiring BP to make data public as available

  6. Research and Development • EPA office of Research and Development (ORD) made a $2 million appropriation request for dispersant research. • Would give grants to universities with oil spill, dispersant use and ecological risk expertise • Would focus on dispersant toxicity, application, surface washing and bio-remediation agents and other mitigation measures

  7. Sampling Plans • Air Sampling and Monitoring Plan • Water and Sediment Sampling Plans • Waste Management Plans

  8. Samples Collected by EPA R4

  9. EPA Sample Locations

  10. Air Monitoring and Air Sampling • Main objectives: monitoring for particulates, dispersant constituents, in-situ burning and evaporation by-products, air toxics, VOCs and compounds causing odors and establishing air quality baseline • Direct reading instrumentation, National Ambient Air Quality Standards (NAAQS) air monitoring network, and air toxic sampling • Special assets, Airborne Spectral Environmental Collection Technology (ASPECT) (airplane) and Trace Atmospheric Gas Analyzer (TAGA) (two mobile air sampling buses)

  11. Monitoring and Sampling Devices • AreaRaes were used for investigating odor complaints and to establish baseline VOC data • Emergency Response Team’s (ERT) TAGA vehicle was used to obtain Volatile Organic Carbon (VOC) readings in the parts per billion range • ASPECT – aerial imagery and monitoring for shoreline and in-situ burns • Summa canisters were used to obtain air toxic information

  12. Monitoring Locations vs. Complaints

  13. EPA Air Monitoring Results

  14. TAGA monitoring

  15. EPA Fixed air stations

  16. EPA Air Sampling Data

  17. EPA Air Sampling Data

  18. Water Sampling Along the Gulf

  19. Water Sampling Effort • Main objectives: establishing pre-spill impact sediment and water quality conditions and monitoring through impact and recovery • Using existing sample locations from EPA’s National Coastal Assessment and identified targeted locations • Special assets, coordinating with USCG and National Oceanic and Atmospheric Administration (NOAA) on deep water vessel sampling efforts and with U.S. Geological Survey (USGS) and NOAA on dispersant analyses, including aquatic toxicity

  20. Water and Sediment Analysis • Water sampling shoreline and expanding into near-shore includes baseline and ongoing surface and sediment sampling for oil-associated contaminants and parameters related to dispersants and aquatic toxicity • Semi-volatile (SVOC) • Metals • Total organic carbon (TOC) • Total petroleum hydrocarbons (TPH) • Dispersant constituents • Toxicity testing

  21. Surface Water Alkyl PAH Results

  22. Surface Water Metals, TPH, VOC Results

  23. Waste Management & Shoreline Cleanup • BP developed a waste management plan with EPA, states and local input • Directives were written to ensure that BP completes its responsibilities under the waste management plans. • Directives require BP to regularly report their waste management actions to EPA and USCG.

  24. EPA Personnel Resources: Updated August 3, 2010 Region 4 has 80+ personnel in field across AL, FL, and MS, and at Regional Office in Atlanta Total EPA and EPA contractor personnel 200-210 responding to incident, including Region 6 (Louisiana and Texas) and EPA HQ in Washington, DC.

  25. Branch locations and incident command post

  26. Orange Beach, AL cleanup July 2010

  27. Manual Sifting vs. Mechanized

  28. For additional information • Art Smith, EPA On-Scene Coordinator smith.art@epa.gov • www.epa.gov/bpspill

More Related