An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PACIFIC PARTNERSHIP 2012 21 MAR 12 OPT Brief This brief is classified: UNCLASSIFIED

  2. Roll Call CDS-7 State Dept – Mr. Weinz USNS MERCY AUS HQ JOC HQ JFNZ JSDF FLC-Yokosuka C7F • C3F • CTF 76 • 351st Civil Affairs Command • DLA Troop Support - Pacific • ETG • 30th NCR • HSC-21 DET 2 • MCAST Blue: Normal participants not expected to attend VTC due to scheduling conflict.

  3. PP 12 Weekly Planning Rhythm 1100W read ahead slides posted to APAN CPF N3 Semi-Monthly Update 1200W MED WG Sun Mon Tues Wed Thurs Fri Sat 1200-1400W OPT VTC 1000W COMMS WG 1000W PA WG 1100W CA WG 1200W ENG WG 1300W LOG WG 1300W FP WG Every other week Effective 21MAR

  4. Planning Timeline EXORD PLANORD Mid Planning Conference Initial Planning Conference CPF RFF FSLO Letter MOU Letters Signed PN Invitation letters Final Initial Requirements Systems Assessment plan Country CONOPs Advanced Echelon PDSS Deployment

  5. ADF Planning Status General Planning CJOPS Decision Brief for PP12 signed. Command CMDR Ken Walters, RAN confirmed as Commander Australian Contingent. Small number of ASNCE staff remain to be identified. Engineering 12 engineers confirmed to participate as FIE in Indonesia. Medical All Personnel for ADF Health PP12 positions identified. Credentialing to follow. NO CHANGE

  6. ADF Participation Command Element O-5 Commander and 4/5 support staff. CIMIC 2 personnel. Engineering Section 12 person section. FIE Indonesia & SIE for remainder of mission. Medical Contribution of 20 personnel in each contingent. Contingent 1 embark USNS MERCY in Guam and change out in Subic Bay Philippines. Contingent 2: embark USNS MERCY in Subic Bay Philippines and disembark at the conclusion of mission in Cambodia. HQJOC Health PP12 POC: CMDR Kenneth Walters (SO1 Reg / Dom & Joint Ex Hlth Plans) kenneth.walters@defence.gov.au NO CHANGE

  7. PP12 RFI Tracker NO CHANGE

  8. JSDF Planning Status • CONOPS of Japan - Developing the CONOPS of Japan Country selection - Philippine - Vietnam Activities - Medical supports - Community service projects Introduction of culture etc. Vehicles - JMSDF ShipLST“OOSUMI” 2LCACs, 2launches(needs pontoon for get in and out form MERCY) - JASDF Aircraft(C-130orKC-767×1) Medical team - Approximately 20~30 NO CHANGE

  9. JSDF Planning Status • Humanitarian community in Japan • - 9 for Philippines(2Dr.s, 1Dentist, 6Nurses) • - 12 for Vietnam (4Dr.s, 1Dentist, 4Nureses, 1Dental hygienist, • 1Dental assistant) NO CHANGE

  10. JSDF Planning Status • POC • - PLANNING • PRI: LCDR Haga : j3haga@js.mod.go.jp DSN:224-7714 • SEC: LCDR Yamaguchi : j3yamaguchi_m@js.mod.go.jp • - MED • PRI: CDR Hayashizaki:j4hayashizaki@js.mod.go.jp • SEC: MAJ Yamasaki:j4yamasaki@js.mod.go.jp • - PA • CDR Maeyama: j1maeyama@js.mod.go.jp • - LCAC OPS • LTJG Yoshida: 1dl@inet.msdf.mod.go.jp • - COMM(for OOSUMI) • LCDR Manabe: 1dl@inet.msdf.mod.go.jp NO CHANGE

  11. JSDF Planning Status NO CHANGE

  12. JSDF RFI

  13. NZDF Planning Status NZDF elements confirmed for the duration of the Vietnam phase of PP12 only. SOM as follows: 02 Jul 12: Concentrate at Devonport Naval Base (DNB) 03 Jul 12: Fly to Manila, Philippines. 04 Jul 12: Embark USNS Mercy. 05 Jul 12: USNS Mercy ship familiarisation training. 06 - 09 Jul 12: USNS Mercy transiting to Vinh City, Vietnam. 10 - 24 Jul 12: Mission Conduct: Vietnam. 24 Jul 12: Disembark USNS Mercy / fly domestic to Hanoi (TBC). 25 Jul 12: Depart Vietnam. 26 Jul 12: Return to NZ (over-nighting in DNB). 27 Jul 12: Return to home locations. NZDF – 8 person team composition consists of the following personnel: OIC / Health Planner: Major Paul KENDALL Amphib Ops Health Planner: Chief Petty Officer Andy FINDLAY-CLARKE Medical Officer: Surgeon Lieutenant John NORTH Nursing Officer: Lieutenant Sarah LINEHAN Dentist: Major Mark WORTHINGTON Environmental Health Technician: Warrant Officer Steve HUNN Medic: Leading Medic Kataraina RATAPU Medic: Corporal Stacey JUNE UPDATE

  14. CPF FOPS Update • Manning Update • Remain 42 billets will be ordered by 23 Mar SDOB. After which PP manning will at 100% ordered • USARC will fill the 16 CA billets. • PACOM will task USARPAC in EXORD • Draft PACOM EXORD at CPF for Chop • JECC, JCSE parent command, acknowledged that TRANSCOM will fund JCSE’s participation in PP12 • Indonesia EAP is being discussed at CPF • Will provide determination mid-next week

  15. Medical Update • Transition to new DMOP – CAPT David Tanen. • Medical Assessment: PI report being chopped. CAM cancelled. RMI will go forward, Tentative date of July. • Staffing – 97/623 billets remain “un-named” – reportedly filled, names have not been forwarded. 7 positions “unfillable. NGO staffing progressing well. PN staffing behind. Malaysia and Netherlands joining. • Credential requirements: Still being reviewed by PACFLT, latest from JAG is that we can provide requested information. • CONOPS – Medical Annexes all at 95%, being reviewed by Mercy CoC prior to submitting to CDRE. • MRX – Exceeded expectations. LL being compiled. • RON – CPF has approved use of hotels “for all overnight stays in PP12”. Still 2 sites in IND that will likely require RON on-site, perhaps 1 in CAM. On-track Off-Track/Recoverable Off-Track not recoverable Completed

  16. Engineering Update Site Survey Projects Recommended SMEE Request Philippines 3 schools & 1 medical clinic P&E; Seawall Cambodia 3 health centers Water; Bldg Design Indonesia 3 health centers & 1 school Seismic; Disaster Vietnam 2 health centers Disaster; Safety Philippine Project Package preparation (ACB1 lead) Cambodia Project Package preparation (NMCB40 lead) Indonesia Project Package preparation (ADF lead/NMCB40 Alt) Vietnam Project Package preparation (NMCB40 lead) Engineering SMEE Plan. On-track Off-Track/Recoverable Off-Track not recoverable Completed NO CHANGE

  17. Logistics Update • Logistics WG held 20 MAR12 • Logistics Resource Matrix Completed • Contracted Medical Life Support items for Indonesia, Philippines and Vietnam submitted to KOs for contract award • Funding • APRI, ORF, OCO on track • Pharmaceuticals and Consumables • Indonesia and Vietnam Estimated Contract Award April • Donation Material • Project Handclasp (60 pallets) scheduled for 5 APR delivery • Next Logistics WG meeting scheduled for 27 MAR12

  18. PP12Supply and Logistics StatusFUNDING (21MAR12) 18 Completed On-track Off-Track/Recoverable Off-Track not recoverable

  19. PP12 Supply and Logistics StatusPHARMACEUTICALS and CONSUMABLES (21MAR12) 19 NO CHANGE On-track Off-Track/Recoverable Off-Track not recoverable Completed

  20. PP12 Supply and Logistics StatusDONATION MATERIAL (21MAR12) 20 On-track Off-Track/Recoverable Off-Track not recoverable Completed

  21. PP12CIS Information Systems Status(21MAR12) 21 On-track Off-Track/Recoverable Off-Track not recoverable Completed

  22. PP12CIS Information Systems Status(21MAR12) 22 On-track Off-Track/Recoverable Off-Track not recoverable Completed

  23. PP12CIS Information Systems Status(21MAR12) 23 NO CHANGE On-track Off-Track/Recoverable Off-Track not recoverable Completed

  24. PP12CIS Information Systems Status (21MAR12) 24 On-track Off-Track/Recoverable Off-Track not recoverable Completed

  25. PP12CIS Information Systems Status(21MAR12) 25 On-track Off-Track/Recoverable Off-Track not recoverable Completed

  26. Force Protection Update • USN Force Protection Asset Status • MESG1 Det Guam (24 EST, 24 Shore, 2 OIC & AOIC) • Travel Reqs nearly complete for FP Element • EST Mercy Mission Rehearsal Exercise Positive Evolution • On The Horizon • Det Guam Planning and Completion of FP products • C7F SATP, Straights Transit, ISP’s, FP Log Reqs, Mission Commander Briefs • Country Specific Support Requirements (HN and Contracting) • ADVON Travel Tracker Completion • Necessary to complete APACS request • Due 30MAR12 • POC’s: Blue – LCDR Weatherup / LT Adams, Gold – LCDR Palacios / LT Nutting

  27. ADVON/FIE SIE (Mil) ISOPREP Completed/validated by parent command within last 6 months https://prmsglobal.prms.af.smil.mil/prms215/default.htm AOR location specific brief Completed by embarked N2, NCIS, or FP OIC Level I ATFP (OCONUS) NKO eLearning within last 6 months https://wwwa.nko.navy.mil/portal/home/ SERE 100 B NKO eLearning within last 18 months https://wwwa.nko.navy.mil/portal/home/ Force Protection Update Pre-Deployment Travel Requirements • ISOPREP • Completed/validated by parent command within last 6 months • https://prmsglobal.prms.af.smil.mil/prms215/default.htm • AOR location specific brief • Completed by parent command N2 or FPO • Level I ATFP (OCONUS) • NKO eLearning within last 6 months • https://wwwa.nko.navy.mil/portal/home/ • SERE 100 B • NKO eLearning within last 18 months • https://wwwa.nko.navy.mil/portal/home/ • IATP / APACS • Completed by ADVON OIC/AOIC for ADVON and ENG OIC for FIE • https://iatp.pacom.mil/ • https://apacs.dtic.mil/apacs/ NO CHANGE

  28. CAWG Update (21 MAR 12)

  29. CAWG Update (21 MAR 12)

  30. Host Nations Indonesia Philippines Vietnam Cambodia 13 Partner Nations Thailand, Australia,Malaysia,Canada, France, Japan, New Zealand, Singapore, Korea, Chile, Peru*, UAE, Netherlands 9 NGOs (and counting) LDS Charities, Hope World Wide, Project Handclasp, Project Hope, World Vets, UCSD Pre-Dental Society, World Vets, Global Grins, Joint and Interagency USAID DOJ USAF NOAA USAR Partnerships for 2012 (as of 3/21/12)

  31. Projected HN/PN Participation by Mission Country (21 MAR 12)

  32. Projected NGO Participation by Mission Country (21 MAR 12) In-Country NGOs IndonesiaPhilippinesVietnamCambodia Help for Orphans(TBD) Calbayog Rotary Club Compassion Flower M'lop Tapang Hope World Wide GIZ (TBD) Vietnam Woman’s Union The Starfish Project Islamic Medical Society(TBD) ASWHO Cambodian Childrens Painting Project Hope Worldwide

  33. Public Affairs Update • Admin • Asst ADVON for PHL identified • Media Coordination NO CHANGE

  34. Public Affairs Update NO CHANGE On-track Off-Track/Recoverable Off-Track not recoverable Completed

  35. Public Affairs Update NO CHANGE On-track Off-Track/Recoverable Off-Track not recoverable Completed

  36. Planning Timeline NO CHANGE UPDATED: 14MAR12

  37. Mission Commander Priorities Country CONOPS Development Philippines, Vietnam, Cambodia CONOPS approved by CPF; posted to APAN under “Operations” Indonesia CONOPS approval pending EAP review (CPF) – status? CONOPS Engineering Annex (COMPLETE) CONOPS Medical Annex (IN PROGRESS – routing thru medical COC, with CO MTF) CONOPS Veterinarian Annex (IN PROGRESS – Estimated completion date?) ADVON Notification in progress by OIC/AOIC Collecting following information: contact info, passport, GOVCC, ATFP requirements, visas Following positions remain unfilled: Indonesia PAO and APAO ADVON contracting requirements submitted Why not contracting for hotel rooms?

  38. Mission Commander Priorities (continued) Voyage Planning CPF major sked change request approved (expect msg later this week) MERCY transit plan 291731Z FEB 12 MERCY transit plan change 1 (C7F transit ONLY) 161808Z MAR 12 CSFTP endorsement: 011817Z MAR 12 C3F approval: 091836Z MAR 12 CTF76 endorsement: 081800Z MAR 12 C7F approval: pending Pre-deployment Briefings 27MAR 1500 PDT (272200ZMAR12) – C3F 02APR 1730 PDT (030030ZAPR12) – CTF76 (VTC) 09APR 1730 PDT (100030ZAPR12) – C7F (VTC) TBD – CPF (13APR – proposed, request time/date confirmation) Final Planning Conference (FPC) / Pre-Sail Conference (PSC) 11APR12 (proposed; no OPT) VTC for all participants Final CONOPS presentation

  39. Mission Commander Priorities (continued) Concerns Manning 43x Unfilled billets (status?) 16x USA CA billets (351st) 21x 807th MEDCOM 6x Air Force Food Service/Culinary Support 3 SDOBs remain before deployment JCSE funding (status?) Indonesia EAP/CONOPS approval Veterinarian Annex (overdue) ORF request message to be released this week (with C7F LT Langhorne for review – status?) Finalizing PN/NGO participation plans (including point of embarkation) FFT (who has lead for resolution?) Medical RON (hotel/expeditionary) clarification

  40. Closing Questions/Comments CPF Staff State Dept – Mr. Weinz AUS HQ JOC HQ JFNZ JSDF FLC-Yokosuka C7F C3F CTF 76 • 351st Civil Affairs Command • DLA Troop Support - Pacific • 30th NCR • ETG • HSC-21 DET 2 • MCAST • USNS MERCY • CDS-7