An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Rational Focal Point for Project Managementand RTC - 1.0 Beta 1 Check PointErich Gamma/Dirk Bäumer IBM Software Group | Rational software Planning relevant C/ALM LinkingMats Gothe & Dirk Bäumer IBM Confidential

  2. Project Area Links • To support CALM PPM scenarios we propose to add the following links between project areas: • Contributes to: if a project Area C contributes to a project area P • And the reverse link between P and C: comprises (or comprised of) Project Area A Contributes To Contributes To Project Area B Project Area C

  3. Plan linking • Due to the fact that in RTC a project area can be used to deliver more than one release pure project area linking is not enough. So we have to introduce links between plans and corresponding RRC and RQM artifacts as well: Plan P1 Contributes To Requirement Set Plan P2 Test Plan implements Tested by

  4. Work item links across Project Areas • Contributes To links between project areas and plans can spawn repository boundaries. This implies that links between work items on these plans must be able to spawn repository boundaries as well. Since a parent / child relationship implies semantic (for example last child closes parent) which we might not be able to provide across repository / project area boundaries we propose to add a special work item link here as well. Work Item W1 Contributes To Work Item W2