Chapter 9: Project Scheduling: PERT - PowerPoint PPT Presentation

Chapter 9:  Project Scheduling: PERT Preloader

  • 343 Views
  • Uploaded on
  • Presentation posted in: General

Chapter 9. Project Scheduling with Known Activity Times (CPM) . Single-Time Estimate . With Uncertain Activity Times (PERT). Triple-Time Estimate . Considering Time-Cost Trade-offs. Crashing. . PERT/CPM. PERT and CPM have been used to plan, schedule, and control projects.PERT: Program Evaluatio

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha

Download Presentationdownload

Chapter 9: Project Scheduling: PERT

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


ad
  • Login