1 / 6

First two slides (3 & 4) together make a tool box talk. Simply print both on one page as a 2 slide set. See direct

First two slides (3 & 4) together make a tool box talk. Simply print both on one page as a 2 slide set. See direction slide #2. Slides 5 & 6 are examples of the What’s wrong series. Instructions For Use. 1.Each odd slide is the visual portion of the talk. 2.Even slide is the text portion.

greta
Download Presentation

First two slides (3 & 4) together make a tool box talk. Simply print both on one page as a 2 slide set. See direct

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. First two slides (3 & 4) together make a tool box talk. Simply print both on one page as a 2 slide set. See direction slide #2. Slides 5 & 6 are examples of the What’s wrong series.

  2. Instructions For Use 1.Each odd slide is the visual portion of the talk. 2.Even slide is the text portion. 3. To print a talk, select File/Print. 4. In the print box select the slide numbers you wish to print making sure the first slide is an odd slide.. 5. Under “Print What” select “2 slides per page” 6. The talk will be printed with the visual (odd slide) on top and the text (even slide) on the bottom of a standard 8 1/2 x 11 sheet. Tool Box Talk Series Safe-Con, LLC

  3. Tool Box TalkExcavations Access ladder outside box • This excavation is not in compliance or safe. Topsoil piles too close to trench. Need 2 feet min. Soil not properly sloped above box Need 1:1 for “B” soil

  4. Excavation Safety • All excavations must be supervised by a competent person. • The soil must be tested and typed for class. • All excavations over 5 feet deep, or shallower excavations where there is a potential for a cave-in must be sloped, benched or shored. • Access must be provided in all excavations over 4 feet deep. • Spoil piles must be at least 2 feet back from the edge of excavations. Attendees ________________________ ____________________________________________________ ____________________________________________________ ____________________________________________________ ____________________________ Date___________________ Safe-Con, LLC

  5. Temporary Lights • Lights must have bulbs. NO OPEN SOCKETS! • Cages must be supported. DO NOT HANG ON PIGTAIL WIRES! Safe-Con, LLC What’s Wrong Inspection Series

  6. Hoisting With Open Hook Right Wrong Sling is pulled toward the open hook. Sling is pulled to the throat of the hook. Safe-Con, LLC What’s Wrong Inspection Series