Naval Oceanographic Office WG/CSAB update. Lamar A. Russell April 18-19 th 2012. Approved for public release. Distribution is unlimited. Outline. Current satellite & In-Situ data sources/products Data retrievals and observations New and Future Satellites

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' Naval Oceanographic Office WG/CSAB update' - grant


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
Naval oceanographic office wg csab update

Naval Oceanographic OfficeWG/CSAB update

Lamar A. Russell

April 18-19th 2012

Approved for public release.

Distribution is unlimited.


Outline
Outline

Current satellite & In-Situ data sources/products

Data retrievals and observations

New and Future Satellites

NAVO Ocean Modeling/Forecast Status

NPP Readiness and JPSS IDPS

Approved for public release.

Distribution is unlimited.


Satellite data sources products
Satellite Data Sources & Products

Data Sources

NOAA/FNMOC ( DoD OTN)

AVHRR/HIRS - MetOp, N-18, N-19

Jason- 2/OSTM MODIS AQUA

SSM/I EDR SSM/IS EDR

MTSAT

NRTPE (NASA/NOAA)

MODIS AQUA

GOES direct readout (NAVO)

ESA

Envisat (altimeter & MERIS- offline 08 Apr 12)

JPL

Jason-1 (offline – 16 Feb 2012)

GHRSST ( AATSR, MSG, MSG2, AMSRE (died – 10/4/11))

Products

SST Retrievals

POES SST

GOES SST

Image Analysis

OFA

Annotated AVHRR

Altimetry

SSHA

SWH

WS

Ocean Optics

Visibility

Attenuation

Approved for public release.

Distribution is unlimited.


In situ data sources products
In-Situ Data Sources & Products

Data Sources

Service Argo

CTDs

Gliders

Profiling Floats

XBTs

Marine Mammals

Morred Buoys

Fixed Stations

Ship Reports

Drifting Buoys

Argos

Products

BUFR

Character Code (model ingest)

Web Products

Customers

NAVOCENO

Numerical Models

FNMOC

Atmospheric Models

Navy Exercise Support

Non-DoD

Academia

Approved for public release.

Distribution is unlimited.


Real time data handling systems

Current and Future Challenges/Issues

Wave Spectra Sensors ( gliders & drifters )

Sharc gliders

Iridium buoys / profiling floats

Emerging Technologies

New data formats for sensors on emerging technology

Standardizing data formats ( IOOS, glider groups, marine mammal data )

New data Delivery methods ( Iridium SBD, PPP, … )

Meeting DISA IA requirements for incoming data

Real Time Data Handling Systems

Approved for public release.

Distribution is unlimited.


Real-Time Altimetry Retrievals

Approved for public release.

Distribution is unlimited.


Real time mcsst retrievals
Real-Time MCSST Retrievals

Approved for public release.

Distribution is unlimited.


Real-Time Sub-surface Observations

Approved for public release.

Distribution is unlimited.


Real-Time Surface Observations

Approved for public release.

Distribution is unlimited.


New and future satellite data feeds
New and Future Satellite/Data Feeds

GOES-15 (2011 - 2017)

Launched 06 Dec 2011

Replacement of GOES-11

Operational implementation – 08 March 2012

NPP (2011 - )

Launched 28 Oct 2011

Initial data receipt – 05 March 2012

COMMS – dedicated OC-12; AFWA  NAVO

AFWA -- Backup Met Winds

Initial retrievals - March 2012

Continuing correlation of GFS and WRF data fields with NOGAPS

COMMS – dedicated OC-12; AFWA  NAVO

COMS1 (2010 – 2017)

Launch – May 2010

GOCI (Ocean Color) – retrieved from Korea Ocean Research and Development Inititive (KORDI)

Meteorological Image(MI)r – anticipate acquiring via SeaSpace

Approved for public release.

Distribution is unlimited.


New and future satellite data feeds cont
New and Future Satellite/Data Feeds (cont.)

Metop-B (2012 -- 2017)

Launch – May 2012

AltiKa ( 2012 - 2015)

Launch delayed to 3nd quarter 2012 (June 2012)

CNMOC/NAVO/NRLSSC Science/Evaluation Team members

EUMETSAT will provide operational support

Sentinel 3 ( 2014 – 2017)

Launch 2013/14

Follow-on to Envisat

ESA primary data provider, EUMETSAT operational support

Jason-3 ( 2014 – 2019)

Launch April 2014

Operational support provided by NOAA ( same as Jason-2 )

Approved for public release.

Distribution is unlimited.


DSRC Upgrades and NAVOCEANO

Model Transitions

“A Taxing Endeavor”

Systems and Operations

will be in-flux.

Approved for public release.

Distribution is unlimited.


Dod supercomputing resource center dsrc summer 2012 full refresh
DoD Supercomputing Resource Center (DSRC)Summer 2012 Full Refresh

Both UNCLAS and CLAS mainframes will be replaced

UNCLAS daVinci (IBM P6U1)

UNCLAS Einstein (Cray MX5U2)

and CLAS PASCAL (IBM P5C1)

Selection to be announced APR 12.

Anticipate 3 of the same - 2 UNCLAS (U1 & U2) and 1 CLAS (C1)

Expected to expand capability 3X from ~34 to ~110 teraflops

Will not know vendor, system, capabilities, etc., until announcement

Small test development system (TDS) to be available APR 12 (128-256 cores)

U1, U2, C1 delivery and testing in JUN 12

C1 will be first

May be issues / delays with installation (water cooled– is current cooling adequate?)

First user access ~1 JUL 12

Acceptance by ~1 AUG 12

Pascal (C) gone 30 SEP 12 (contract expires)

Could be extended if schedule continues to slip and we have issues

daVinci and Einstein (U) gone 31 DEC 12.

Approved for public release.

Distribution is unlimited.


Navo model ops dsrc transitions timetable always in flux
NAVO Model Ops DSRC Transitions Timetable (Always in Flux)

MID-APR - 30 JUN (2.5 months) - system definition / scope / education / testing

LATE-APR - 01 JUL (2 months) - test cases on TDS

Likely lots of competition

Small starter jobs: R-NCOM (64 cpus), SWAN (8 cpus), COAMPS (64 cpus), etc.

Modeler involvement required

01 JUL - 01 OCT (3 months) - move CLAS models (Pascal) to C1

OCEAN_QC / NCODA

GNCOM & HYCOM ???

~10 RNCOM, & ~12 CNCOMs

~150 WAMS & WW3 (???, but doubtful)

~150 SWANS

What else (PCTIDES, ...)

MID AUG – END DEC (4.5 months) - move UNCLAS models (daVinci / Einstein) to U1 / U2

First priority is CLAS move, start UNCLAS a month later

Probably move all to U1 with U2 as mirror site

A few less domains than above

Possible exception-- not GNCOM and only move HYCOM 1/12

Approved for public release.

Distribution is unlimited.


Hycom timetable preliminary
HYCOM Timetable (preliminary)

1 MAY- OPTEST report completed, submitted, and approved by end of APR.

End MAY- Target UNCLAS HYCOM on Einstein producing pre-operational output OSMEs evaluate throughout month.

MAY - 1 OCT- UNCLAS HYCOM and UNCLAS GNCOM to run in parallel on Einstein/daVinci through the summer. CLAS GNCOM continues as operational model.

OPTEST evaluations continue (F Bub – AutoMetrics-based)

JUL – AUG- CLAS GNCOM transition to the new DSRC system Pascal  C1, continues as operational model through summer/fall

Internal Model comparisons

AUG – SEP- CLAS HYCOM will be installed on C1 during the summer DSRC transition

CLAS HYCOM will replace CLAS GNCOM by 30 SEP (If seamless transition)

Pascal scheduled for decommissioning).

OCT - NOV-UNCLAS HYCOM will be installed on new system U1

UNCLAS HYCOM will replace GNCOM by DEC.

Approved for public release.

Distribution is unlimited.


NPP Acquisition and Implementation

Status

Launch– Oct 2011

COMMS (OC-12) online– 5 March 2012

Data Availability – 5 March 2012

Pitfalls and Challenges

Original COMMS requirements six (6) months prior to launch not fulfilled

Initial data throughput 0.5 Mbytes/sec/session @ 20 sessions

Anticipated throughput ~ 45-50 Mbytes/sec

Extensive coordination between NAVO and AFWA personnel has not significantly improved COMMS throughput; 3-4 Mbytes/sec/session @ 8 sessions

WDA-4 JMBL 8/5 is insufficient to validate operational functionality/capacity

Approved for public release.

Distribution is unlimited.


JPSS and IPDS Issues/concerns

Navy working with JPSS Program on revised requirements

and architectural options for CGS.

What infrastructure is required?

How and what data will be delivered/retrieved?

Dedicated COMMS Line

COPC Network

How does NFG fit into data delivery (CTO 10-21)

COST!!

Who covers what?

How much is Navy’s chunk?

NAVOCEANO IDPS facility space is ready and awaiting

final architectural design.