Electronics WG

Electronics WG. Current schedule. DCS: In progress – RP box done - will need some help from the institutes Power supplies – need technician help from institute for protection diode in OPFCs Boards Host and optoRX status RP MB and hybrids Mezzanines CC, VFAT trigger Gas detector hybrids

graceland
Download Presentation

Electronics WG

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Electronics WG

  2. Current schedule DCS: In progress – RP box done - will need some help from the institutes Power supplies – need technician help from institute for protection diode in OPFCs Boards Host and optoRX status RP MB and hybrids Mezzanines CC, VFAT trigger Gas detector hybrids T1 electronics ROC, AFEC, CFEC … T2 electronics Cables -> need full list Triggering: need to fix ideas on how to signal a problem of one of the data paths (out of sync, etc…), if trigger rate too high how is throttle organized, etc… Interlock and RP electrical trigger

  3. Current schedule

  4. Current schedule

  5. Interlock block diagram Motor Control MACHINE FLAGS IN MOTOR CONTROL RACK ALL_RP_OUT RP_OUT 1 End Switch 1 AND INJECTION_INHIBIT Beam 1 ALL_RP_OUT CIBF 1 x 12 x 12 RP_OUT 12 End Switch 12 Position 1-3 OR USER_PERMIT Beam 1 LVDT Resolver 1 compare AND CIBU 1 x 4 x 12 Position 9-12 LVDT Resolver 12 compare USER_PERMIT Beam 2 Limits FESA x 12 INJECTION_INHIBIT Beam 2 CIBF 2 DEVICE_ALLOWED GMT (SMP) AND OVERRIDE 1 DCS BACK HOME OR STABLE BEAM IN S2E11 (TRIGGER/DAQ) RACK DAQTR_OUT 1 DAQTR 1 AND DAQTR_OUT OR USER_PERMIT Beam 1 x 4 x 4 CIBU 2 DAQTR_OUT 12 DAQTR 4 OVERRIDE 2 DAQTR DOWN USER_PERMIT Beam 2

  6. Interlock schematics Johan Morant • Specs finalized • Schematics almost finalized • Layout to start more seriously.

  7. Status • CC mezzanine: several problems with bakeout 2x ! Now again in production some (~ 10 available). New production available very soon. • Mapping: • For RP • For T2 : outputs 1-8 -> outputs 9-16 !

  8. RP LONG CABLES • Database being updated (S. Bally)

  9. RP SHORT CABLES • RP220 still to be verified • RP 147 being prepared with labels to be connectorized in institutes

  10. RP OPTICAL FIBERS • About to arrive