IP and AMHS TRIALS- PLANIFICATION STRATEGY
This presentation is the property of its rightful owner.
Sponsored Links
1 / 19

IP and AMHS TRIALS- PLANIFICATION STRATEGY PowerPoint PPT Presentation


  • 116 Views
  • Uploaded on
  • Presentation posted in: General

IP and AMHS TRIALS- PLANIFICATION STRATEGY. INITIAL SITUATION. At the end of 2008, it was initiated an interoperability planning test between Aena and new ANSPs that have migrated to AMHS or that are planning to migrate to AMHS in a sort time frame.

Download Presentation

IP and AMHS TRIALS- PLANIFICATION STRATEGY

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Ip and amhs trials planification strategy

IP and AMHS TRIALS- PLANIFICATION STRATEGY


Ip and amhs trials planification strategy

INITIAL SITUATION

At the end of 2008, it was initiated an interoperability planning test between Aena and new ANSPs that have migrated to AMHS or that are planning to migrate to AMHS in a sort time frame.

First action was the identification of the IP infrastructure to be used.


Ip and amhs trials planification strategy

GENERAL STEPS

DESIGN PHASE

LAYER 1: Identify the physical infrastructure that will be used.

LAYER 3: Agree the network configuration

LAYER 7: Agree the AMHS configuration

Agree the network test that will be performed.

Agree the AMHS test that will be performed.

TEST PHASE

Perform some network test to assure the network connectivity.

Perform the AMHS trials

MIGRATION PHASE

Define coordinated procedures to carry out the migration in a coherent and compatible manner.


Ip and amhs trials planification strategy

CONTACTs AMONG ANSPs

Contact among different ANSP have been initialized in two different forums. In the EUR-AFI Regions this project was materialized in a Task- Force, under the umbrella of the AEFMP group ( AEFMP IP-TF).

In the case of the Aena (Spain)-FAA(Argentina) initiative, it has born thanks to the good relations and understanding between both organizations.

The list of ANSP that have contacts in order to perform trials in short or medium term are:

SAM REGION

FAA-ARGENTINA

AFI REGION

ONDA-MOROCCO

ENNA-ALGERIA

EUR REGION

AENA - SPAIN

DSNA FRANCE

NAV- PORTUGAL


Ip and amhs trials planification strategy

AENA- FAA ARGENTINA PROGRESS

  • DESIGN PHASE

  • Identify the physical infrastructure that will be used  DONE

    • IP NATIONAL DATA NETWORS

    • CAFSAT INFRAESTRUCTURE

  • Agree the network configuration DONE

    • IP NATIONAL DATA NETWORS  DONE

    • CAFSAT INFRAESTRUCTURE DONE

  • Agree the AMHS configuration ON GOING

  • Agree the AMHS tests that will be performed DONE

  • TEST PHASE

  • Perform some network test to assure the network connectivity PARTIALLYDONE.

    • IP NATIONAL DATA NETWORS DONE (9th week)

    • CAFSAT INFRAESTRUCTURE  DONE

  • Perform AMHS trials PENDING

  • MIGRATION PHASE

  • Define coordinated procedures to carry out the migration in a coherent and compatible manner PENDING


Ip and amhs trials planification strategy

FR switch

FR switch

AENA(SPAIN)- FAA (ARGENTINA) PHYSICAL INFRASTRUCTURE

NAT-PT

IPv4

C A F S A T

BORDER ROUTER test

IPv6/FR

AMHS test

REDAN WAN

FR infrastructure

REDAN IP

BORDER ROUTER test

AMHS operational

NAT-PT

IP infrastructure

BORDER ROUTER operational

España

Argentina

AMHS test


Ip and amhs trials planification strategy

AENA ( SPAIN)- NAV(PORTUGAL) PROGRESS

  • DESIGN PHASE

  • Identify the physical infrastructure that will be used DONE

  • Two options depending on the time frame.

    • Short Term Solution. Connecting IP NATIONAL DATA NETWORS usinga TDMs COMMON INFRASTRUCTURE. PARTIALLYDONE.

    • Long Term Solution. Using the PENs infrastructure. PARTIALLYDONE.

  • Agree the network configuration -> ON GOING under the umbrella of the AEFMP IP Task Force (*)

    • IP NATIONAL DATA NETWORS

    • TDM COMMON CAFSAT INFRAESTRUCTURE

  • Agree the AMHS configuration -> DONE

  • Agree the AMHS test that will be performed -> DONE

  • (*) AEFMP is a Regional Plan composed of: Algeria, Spain, France, Morocco and Portugal.


Ip and amhs trials planification strategy

AENA (SPAIN)- NAV (PORTUGAL) PROGRESS

  • TEST PHASE

  • Perform network tests to assure the network connectivity  ON GOING.

    • IP NATIONAL DATA NETWORS  ON GOING

    • PENs INFRAESTRUCTURE Not yet Available.

  • Perform AMHS trials PARTIALLY DONE

    • Three different phases defined.

    • First phase: Performing AMHS trials in a local environment.  DONE

    • Second phase: Performing AMHS trials using the interconnection of both national IP networks, Medium term solution  PENDING.

    • Third phase: Performing AMHS trials using the PENs infrastructure  PENDING.

  • MIGRATION PHASE

  • Define coordinated procedures to carry out the migration in a coherent and compatible manner PARTIALLY DONE


Ip and amhs trials planification strategy

AENA(SPAIN)- NAV (PORTUGAL) SHORT TERM PHYSICAL INFRASTRUCTURE

QSIG/R2

QSIG/R2

QSIG/R2

QSIG/R2

Data applications:

OLDI, AMHS, RADAR


Ip and amhs trials planification strategy

REDAN IP

RINAL IP

AENA(SPAIN)- NAV (PORTUGAL) LONG TERM PHYSICAL INFRASTRUCTURE

PENS

BARCELONA

LISBOA

MADRID

AEFMP

REGIONAL

NETWORK

FARO

SEVILLA


Ip and amhs trials planification strategy

AENA (SPAIN)- DSNA (FRANCE)- ONDA (MOROCCO)-ENNA (ALGERIA) PROGRESS

DESIGN PHASE

Identify the physical infrastructure that will be used DONE

Agree the network configuration DONE

Agree the AMHS configuration  PARTIALLY DONE

Agree the AMHS test that will be performed  DONE

TEST PHASE  AGREEDED

Perform network test to assure the network connectivity

Perform AMHS trials

MIGRATION PHASE  AGREEDED

Define coordinated procedures to carry out the migration in a coherent and compatible manner.


Ip and amhs trials planification strategy

REDAN IP

RENAR

AENA(SPAIN)- DSNA (FRANCE) MEDIUM AND LONG TERM PHYSICAL INFRASTRUCTURE

PENS

BARCELONA

PotentiallyATHIS

PotentiallyAix-en Provence

MADRID

AEFMP

REGIONAL

NETWORK

PotentiallyBOURDEOS

BARCELONA


Ip and amhs trials planification strategy

FR switch

FR switch

AENA(SPAIN)- ONDA (MOROCCO) PHYSICAL INFRASTRUCTURE

NAT-PT

IPv4

C A F S A T

BORDER ROUTER test

IPv6/FR

AMHS test

REDAN WAN

F.R. infrastructure

REDAN IP

BORDER ROUTER test

AMHS operational

NAT-PT

IP infrastructure

BORDER ROUTER operational

Morocco

Spain

AMHS test


Ip and amhs trials planification strategy

AENA(SPAIN)- ENNA (ARGELIA) PHYSICAL INFRASTRUCTURE

NAT-PT

IPv4

BORDER ROUTER test

IPv6/FR

AMHS test

REDAN WAN

IPv6/FR

64kbps LL

BORDER ROUTER test

REDAN IP

AMHS operational

BORDER ROUTER operational

Algeria

Spain

AMHS test


Ip and amhs trials planification strategy

Low level protocols

AENA (SPAIN)- DSNA (FRANCE)- ONDA (MOROCCO)-ENNA (ALGERIA)- NAV (PORTUGAL)

  • 1.The low level protocol used in the communications stack by the members of the AEFMP group will be TCP/IP.

  • 2.IPv4 protocol will be used by the application because it is the commercialized version by the COTs providers nevertheless the international IP connectivity will be made using IPv6.

  • 3.ONDA and ENNA have formally requested to Eurocontrol a range of IPv6 address.

  • ONDA has been assigned an operational IPv6 address and a Pre-operational IPv6 address (for tests).

  • 5.The connectivity solution will be partially supported by PENs, in long term for those countries where the PENs infrastructure will be available. In short and in medium term bilateral agreements will be done to performing AMHS trials.

  • Be aware about the amount of traffic exchanged and use this data for estimating the network resources required by the AMHS.


Ip and amhs trials planification strategy

AMHS Addressing

AENA (SPAIN)- DSNA (FRANCE)- ONDA (MOROCCO)-ENNA (ALGERIA)- NAV (PORTUGAL)

  • 1.Is recommended to adopt the CAAS addressing scheme by the AEFMP members.

  • 2.Is agreed to use the AMC facility in support of the AMHS implementation, according with the EANPG conclusion.

  • Use the information of how to announce minor and mayor changes in the AMHS addressing scheme that is named “Outline of proposed procedures for coordination between ICAO AMHS MD Register and AMC” included in the doc. “11WP27 - Inter-regional co-ordination activities”.


Ip and amhs trials planification strategy

AMHS Routing

AENA (SPAIN)- DSNA (FRANCE)- ONDA (MOROCCO)-ENNA (ALGERIA) - NAV (PORTUGAL)

1.The short term proposal is to implement, as minimum, the current CIDIN routing/topology.

2.According with the current PENs implementation, a fully meshed topology will be possible in the Eur Region in medium term. As consequence, the topology among some members of the AEFMP will be “theoretically” fully meshed, in medium term.

3.In long term a different topology can be implemented among the AEFMP’s members. In order to choose the best one, it is needed to be aware about the real exchanged traffic.


Ip and amhs trials planification strategy

Tests

AENA (SPAIN)- DSNA (FRANCE)- ONDA (MOROCCO)-ENNA (ALGERIA) - NAV (PORTUGAL)

1.A network infrastructure has to be agreed to perform the AMHS trials.

2.It is strongly recommended to perform interoperability trials as are collected in the Eur AMHS Manual, appendix E (bilateral and trilateral, if possible).

3.Additionally some conformance test could be performed, the test cases could be expanded based on bilateral agreements.

AMHS CONFIGURATION

TCP/IP AMHS Parameters

  • X.400andUpperLayer Parameters


Ip and amhs trials planification strategy

Thanks for your attention


  • Login