1 / 11

CSC Online and Offline DQA Status

CSC Online and Offline DQA Status. Ken Johns, Venkat Kaushik, Xiaowen Lei (U. Arizona). CSC ROD Status. New version of ROD firmware/software is presently being tested on ROD test stand CSC is running parasitically with ATLAS using CTP triggers Gnam histograms are produced

grace
Download Presentation

CSC Online and Offline DQA Status

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CSC Online and Offline DQA Status Ken Johns, Venkat Kaushik, Xiaowen Lei (U. Arizona)

  2. CSC ROD Status • New version of ROD firmware/software is presently being tested on ROD test stand • CSC is running parasitically with ATLAS using CTP triggers • Gnam histograms are produced • Express stream histograms and DQM must be produced by hand

  3. CSC Online DQA • Issues • Some online (GNAM) histogram changes did not get propagated to current version • In theory, OHP, DQMF, DQ flag storage are in good shape but still lack daily exercise with ATLAS partition before signoff • Documentation for shifters exists • Calibration Stream GNAM monitoring in progress though probably not implemented until late January • Results from beam-beam collisions

  4. CSC Offline DQA • Issues • Splitting of the MuonDetector configuration resulted in the CSC folder disappearing in DQ Web Browser • It was there previously • Still trying to get experts to respond • In theory, HAN, DQMF, DQ flag storage are in good shape but still lack daily exercise with ATLAS partition before signoff • Results from beam-gas collisions

  5. CSC Offline DQM • CSC overview

  6. CSC Offline DQM • CSC timing • Beam moving from A side to C side

  7. CSC Offline DQM • CSC cluster monitoring

  8. CSC Offline DQM • CSC RDO monitoring

  9. CSC Offline DQM • CSC RDO monitoring

  10. CSC Offline DQM • CSC RDO monitoring

  11. Conclusions

More Related