Energy saving ppp contracts public lightning
This presentation is the property of its rightful owner.
Sponsored Links
1 / 10

ENERGY-SAVING PPP CONTRACTS : PUBLIC LIGHTNING PowerPoint PPT Presentation


  • 67 Views
  • Uploaded on
  • Presentation posted in: General

ENERGY-SAVING PPP CONTRACTS : PUBLIC LIGHTNING. Boštjan Ferk, Director Institute for Public - Private Partnerships , Slovenia E: bostjan.ferk @pppforum.si ,  S:  www.pppforum.si. GREEN PPP PROJECTS. Public lightning Solar Power Stations Energy Efficiency in the Building Sector

Download Presentation

ENERGY-SAVING PPP CONTRACTS : PUBLIC LIGHTNING

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Energy saving ppp contracts public lightning

ENERGY-SAVING PPP CONTRACTS: PUBLIC LIGHTNING

Boštjan Ferk, Director

Institute forPublic-PrivatePartnerships, Slovenia

E:[email protected], S: www.pppforum.si


Green ppp projects

GREEN PPP PROJECTS

  • Public lightning

  • Solar Power Stations

  • Energy Efficiency in the Building Sector

  • Cogeneration


Sources of finance for green projects

SOURCES OF FINANCE FOR GREEN PROJECTS

  • Public Procurement (public sources)

  • Public-Private Partnerships (private sources)

  • EU Funds

  • “Self-financing “


Renovation of public lightning system

RENOVATION OF PUBLIC LIGHTNING SYSTEM

typical green PPP project

suitable for project financing

Financing, Planning, Installation (Renovation), Maintenance (private partner) + option to include supply of electricity

periodical payments after renovation (public partner)


Project financing of public lightning project

PROJECT FINANCING OF PUBLIC LIGHTNING PROJECT

financing the project with FUTURE savings

life cycle costs of the project must not exceed future savings


P rinciple of duration and participation model

PRINCIPLE OF DURATION AND PARTICIPATION MODEL*

*Sourse: Guideline for Saving Contracting in Street Lighting, 2006


Challenge how to define future savings

CHALLENGE: HOW TO DEFINE FUTURE SAVINGS

  • mostly used: comparison of the cost of electricitybefore/after the project - WRONG

  • it is impossible to exactly predict future savings

  • future cost of electricity depends on:

    • price of electricity

    • number of lights

    • efficiency of lights technology

    • active time

    • failures of lights

    • ...


How to avoid mistakes in ppp for public lightning

HOW TO AVOID MISTAKES IN PPP FOR PUBLIC LIGHTNING?

involving INDEPENDENT technical expert

exact overview of the existing situation

involving private partner in all phases of the project

contract should include mechanisms to deal with future conflicts


Why ppp for green projects

WHY PPP FOR GREEN PROJECTS?

  • tehnically challenging projects

  • possibility to involve private sector in all phases of the project

  • potential risk sharing

  • private financing


Energy saving ppp contracts public lightning

Thank you for your attention!

Boštjan Ferk, Director

Institute forPublic-PrivatePartnerships, Slovenia

E:[email protected], S: www.pppforum.si


  • Login