An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Status of the TTF-2 RF System M. Ebert for MHFp & MHFe TTF 2 Review Meeting Schloss Salzau

  2. F-Längenausgleich 3-dB-Hybrid f Phasenschieber 5 MW, Df>20° Planned RF Distribution ACC 6 ACC 5 ACC 4 ACC 3 ACC 2 ACC 1 RF-Gun 2 MW > 2 MW ~ 4 MW ~4 MW ~1 MW Mod 4 (10 MW) 2 x 3 MW Mod 1 (5 MW) Mod 2 (5 MW) Mod 3 (5 MW) Mod 5 (5 MW) nur für Testzwecke Mod 6 (10 MW) Reserve, assembly in Spring ´03 TTF 2 Review Meeting Schloss Salzau

  3. Temporary RF Distribution(for rf test) Test-Superstruktur (passiv) ACC 6 (not installed in Feb 03) Module 1* (passiv) ACC 5 ACC 4 ACC 3 RF-Gun 2 x 2 MW Mod 4 (10 MW) 2 x 2 MW Mod 1 (5 MW) Mod 2 (5 MW) Mod 3 (5 MW) Mod 5 (5 MW) nur für Testzwecke TTF 2 Review Meeting Schloss Salzau

  4. Last Week´s Status of Waveguide Assembly Test-Superstruktur (passiv) ACC 1* (passiv) ACC 6 ACC 5 ACC 4 ACC 3 RF-Gun TTF 2 Review Meeting Schloss Salzau

  5. Status of Klystron / Modulator 4 & 5 • Klystron 4 (10MW) • Prototype tube installed • Tested at 10MW, 1.5ms, 10Hz • Stable operation up to 8 MW • Upgrading of RF-Interlock forimproved control system interface is under way • ( but necessary computers are not ordered yet) • Work could be finished in 2 months • Klystron 5 (5 MW) • Tested at 120kV, 1.5ms, 1Hz without rf • Upgraded RF-Interlock installed • Still to be done: • Full power rf test • Control system communication (necessary computers are not ordered yet) • Work could be finished in 2 months TTF 2 Review Meeting Schloss Salzau