Mountain empire model railroaders
Download
1 / 18

Mountain Empire Model Railroaders - PowerPoint PPT Presentation


  • 73 Views
  • Uploaded on

Mountain Empire Model Railroaders. How to get the MEMRR Main Layout Up and running. Resetting Modem. Turn off the power strip on floor next to the computer Wait 20 to 30 seconds Turn the power strip back on

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' Mountain Empire Model Railroaders' - gomer


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
Mountain empire model railroaders

Mountain Empire Model Railroaders

How to get the MEMRR

Main Layout

Up and running


Resetting modem
Resetting Modem

  • Turn off the power strip on floor next to the computer

  • Wait 20 to 30 seconds

  • Turn the power strip back on

  • This allows the modem to reboot for those who want to use a Wireless Throttle (I Pad, I phone, Android devices)


Main power switches
Main Power Switches

  • Turn on the Large DCC track Power Switch

  • Turn on the Large 120 VAC Power Switch

  • These are located on the staging yard module

    At the right side of the control tower


Computer
Computer

  • Turn on Computer Tower

  • Key in Ctrl-Alt-Delete when asked

  • Hit Enter Key when password is asked for

  • Wait for computer to boot up


Panel pro
Panel Pro

  • Once the Computer has fully booted up

  • Double click on the Panel Pro Icon

  • Wait for Panel Pro to come up


Move panel pro pane
Move Panel Pro Pane

  • Once Panel Pro Pane comes up right click and drag

    Panel Pro Pane to upper left corner of right monitor screen.


Open panels screen
Open Panels Screen

  • Select the Panels drop down menu on The Panel Pro Pane

  • Click on Open Panels


Open panels
Open Panels

  • Select HO MEMRR.xml

  • Click on Open Panels


Opening panels
Opening Panels

  • Wait for Panels to open

  • On right hand monitor under Routes Click on

    Close All Sides. The screen should now look like this


Track power
Track Power

  • On the Panel Pro Pane click on Tools

  • Click on Power Control

  • Click on the ON button


  • Plug in a 400 series throttle

  • Check that you have a solid black square in

    the upper right corner of the Throttle Display Screen.

  • If you have no square or a flashing square go back to the

  • Power Control pane and hit the ON button again.


Wi throttles
Wi Throttles

  • If Wi Throttle use is requested

  • Go to the Panel Pro pane

  • Select Tools drop down menu

  • Select Throttles drop down menu

  • Click on Start WiThrottle

  • Allow start up time. WiThrottles should now be active


  • The WiThrottlepane should look like this



How to shut down
How to Shut Down

  • Check that no trains are running on Main Loops.

  • Check that all the Switches (turnouts) to the Wye& Crossovers are set to clear the Main Loops.

  • Turn off Track Power.


  • Shut down Panel Pro by hitting Quit on the

    Panel Pro Pane.

  • Shut down the Computer


Turn off main power switches
Turn Off Main Power Switches

  • Find the Main Power Switches.

  • These are located on the staging yard module

    At the right side of the control tower

  • Turn off the Large DCC track Power Switch

  • Turn off the Large 120 VAC Power Switch


The End

Thank You

John Edwards


ad