1 / 12

Mabel Bridge Rezoning Hearing

Mabel Bridge Rezoning Hearing. John Wotton Thornhill Resident. Three Communities. Lake Mabel Drive Mabel Bridge Thornhill. Lake Mabel Drive Community. Long time residents with beautiful lakefront homes.

glen
Download Presentation

Mabel Bridge Rezoning Hearing

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Mabel Bridge Rezoning Hearing John Wotton Thornhill Resident

  2. Three Communities • Lake Mabel Drive • Mabel Bridge • Thornhill

  3. Lake Mabel Drive Community • Long time residents with beautiful lakefront homes. • Former KB management and home owners have history of mistrust in regards to green space on property line. • Two confirmed items that are true: • One of their own is selling the property to KB. • No line of sight to the construction site.

  4. Beautiful trees/shrubs planted between Lake Mabel Drive and KB

  5. Street view from Lake Mabel Drive to Construction site

  6. Opposite street view at construction site looking towards Lake Mabel Drive

  7. Mabel Bridge Community • Pond residents paid premium for lots that included a pond and green space. • No change to the pond! • Compromise on green space by not building on first three original proposed lots • 36% of new construction is adjacent to Mabel Bridge residents! • Four homes adjacent construction- one home owner not moved in.

  8. Mabel Bridge pond view towards proposed construction

  9. New home, no current resident

  10. Thornhill Community • 64% of proposed construction is adjacent to Thornhill residents. • Community concerns: • Increased traffic through Thornhill. • Safety of children using playground. • Resale value? • Lot premiums paid for green space. • Construction equipment, thefts and damages.

  11. What keeps me up at night! • Three concerns: • -Owner of property has the right to take down every tree in the green space. • -Current zoning allows for larger/mansion type homes that could be back to back with Thornhill with no buffer. • -Not knowing the future with this property!

  12. KB Commitments • Written Agreement with Thornhill HOA • 40 ft. buffer of current green space. Buffer area to be turned over to Thornhill HOA. • Three designated traffic devices for the safety of our children. • Construction plan to minimize traffic, increase safety and assist Thornhill owners with after construction improvements.

More Related