Cooper Lake Hydroelectric Project and Transmission Line. Relicensing Update May 7, 2003. Chugach Electric Burke Wick – Energy Supply Carol Johnson - Legal Mike Massin - Engineering Dora Gropp - Transmission Jim Topolski – Right of way Carl Harmon - Environmental. Consultants

Download Presentation

Cooper Lake Hydroelectric Project and Transmission Line

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Cooper lake hydroelectric project and transmission line

Cooper Lake Hydroelectric Project

and Transmission Line

Relicensing Update

May 7, 2003


Relicensing team

Chugach Electric

Burke Wick – Energy Supply

Carol Johnson - Legal

Mike Massin - Engineering

Dora Gropp - Transmission

Jim Topolski – Right of way

Carl Harmon - Environmental

Consultants

Longview & Assoc.

HDR Engineering

MWH Engineering

Heller Erhman

Relicensing Team


Cooper lake hydroelectric project and transmission line

Relicensing Participants

  • Federal Agencies

    • EPA

    • USF&W

    • NMFS

    • Chugach NF

    • USFS

    • FERC

    • Army Corps of Eng.

  • State Agencies

    • ADF&G

    • ADNR

    • ADEC

    • AK. OMB


Cooper lake hydroelectric project and transmission line

Relicensing Participants

  • Interested Groups

    • MEA

    • HEA

    • Cooper Landing Hist.

    • Alaska Flyfishers

    • Trout Unlimited

    • American Rivers

    • American Whitewater

    • Kenaitze Tribe

  • Local Government

    • Kenai Peninsula Borough

    • City of Seward


Cooper lake hydroelectric project and transmission line

Project Map


Cooper lake hydroelectric project and transmission line

Study Plans

  • Hydrology Study

  • Stream Flow and Water Quality Study

  • Cooper Creek Aquatic Habitat Analysis

  • Cooper Creek Fish Resources Study

  • Cultural Resources Study

  • Sensitive and Exotic Plants Survey

  • Effects of Project on Kenai River Fish Habitat

  • Terrestrial Vegetation Study

  • Terrestrial Wildlife Study

  • Cooper Creek In Stream Flow Study

  • Cooper Creek Recreational Whitewater Potential

  • Road and Access Route Condition Survey

  • Project mapping

  • Cooper Lake Fish Resources Study

  • Cooper Lake Marco invertebrates Study

  • Evaluation of Entrainment

  • Porcupine Creek Fish Resources Study

  • Cooper Lake and Creek Water Birds Study


Milestones

Notice of Intent to relicense2/25/02

Public outreach regarding relicensing plan3/20/02

Initial Consultation Package9/9/02

Develop Study Plans3/20/02 – 5/2/03

Spring 2003 Technical Workshop5/15/03

Conduct 2003 Studies5/1/ – 12/31/03

Draft License Application5/28/04

Draft License Comment Period8/30/04

Substantive Disagreement Meeting10/29/04

License Application to FERC4/28/05

Milestones


Relicensing costs estimated at 4 918 900 does not include any future mitigation costs