Cooper Lake Hydroelectric Project
Download
1 / 8

Cooper Lake Hydroelectric Project and Transmission Line - PowerPoint PPT Presentation


  • 252 Views
  • Uploaded on

Cooper Lake Hydroelectric Project and Transmission Line. Relicensing Update May 7, 2003. Chugach Electric Burke Wick – Energy Supply Carol Johnson - Legal Mike Massin - Engineering Dora Gropp - Transmission Jim Topolski – Right of way Carl Harmon - Environmental. Consultants

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'Cooper Lake Hydroelectric Project and Transmission Line' - glain


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript

Cooper Lake Hydroelectric Project

and Transmission Line

Relicensing Update

May 7, 2003


Relicensing team

Chugach Electric

Burke Wick – Energy Supply

Carol Johnson - Legal

Mike Massin - Engineering

Dora Gropp - Transmission

Jim Topolski – Right of way

Carl Harmon - Environmental

Consultants

Longview & Assoc.

HDR Engineering

MWH Engineering

Heller Erhman

Relicensing Team


Relicensing Participants

  • Federal Agencies

    • EPA

    • USF&W

    • NMFS

    • Chugach NF

    • USFS

    • FERC

    • Army Corps of Eng.

  • State Agencies

    • ADF&G

    • ADNR

    • ADEC

    • AK. OMB


Relicensing Participants

  • Interested Groups

    • MEA

    • HEA

    • Cooper Landing Hist.

    • Alaska Flyfishers

    • Trout Unlimited

    • American Rivers

    • American Whitewater

    • Kenaitze Tribe

  • Local Government

    • Kenai Peninsula Borough

    • City of Seward



Study Plans

  • Hydrology Study

  • Stream Flow and Water Quality Study

  • Cooper Creek Aquatic Habitat Analysis

  • Cooper Creek Fish Resources Study

  • Cultural Resources Study

  • Sensitive and Exotic Plants Survey

  • Effects of Project on Kenai River Fish Habitat

  • Terrestrial Vegetation Study

  • Terrestrial Wildlife Study

  • Cooper Creek In Stream Flow Study

  • Cooper Creek Recreational Whitewater Potential

  • Road and Access Route Condition Survey

  • Project mapping

  • Cooper Lake Fish Resources Study

  • Cooper Lake Marco invertebrates Study

  • Evaluation of Entrainment

  • Porcupine Creek Fish Resources Study

  • Cooper Lake and Creek Water Birds Study


Milestones

Notice of Intent to relicense 2/25/02

Public outreach regarding relicensing plan 3/20/02

Initial Consultation Package 9/9/02

Develop Study Plans 3/20/02 – 5/2/03

Spring 2003 Technical Workshop 5/15/03

Conduct 2003 Studies 5/1/ – 12/31/03

Draft License Application 5/28/04

Draft License Comment Period 8/30/04

Substantive Disagreement Meeting 10/29/04

License Application to FERC 4/28/05

Milestones


Relicensing costs estimated at 4 918 900 does not include any future mitigation costs
Relicensing CostsEstimated at $4,918,900Does not include any future mitigation costs